Estimated Applied Water Use definition

Estimated Applied Water Use or “EAWU” means the annual total amount of water estimated to keep plants in a healthy state. It is based on factors such as reference evapotranspiration rate, the size of the landscape area, plant water use factors, and the irrigation efficiency within each hydrozone.
Estimated Applied Water Use means the average annual total amount of water estimated to be necessary to keep plants in a healthy state, calculated as provided in the Guidelines. It is based on the reference evapotranspiration rate, the size of the landscape area, plant water use factors, and the relative irrigation efficiency of the irrigation system.
Estimated Applied Water Use means the portion of the Estimated Total Water Use that is derived from applied water. The Estimated Applied Water Use shall not exceed the Maximum Applied Water Allowance. The Estimated Applied Water Use may be the sum of the water recommended through the irrigation schedule, as referenced in Section 492(c)(3).

Examples of Estimated Applied Water Use in a sentence

  • The Estimated Applied Water Use shall not exceed the Maximum Applied Water Allowance.

  • Maximum Applied Water Allowance, MAWA, and Estimated Applied Water Use shall be calculated and submitted on all landscape construction documents.

  • All tape-based digital video formats are either obsolete or will be soon.

  • A calculation of Estimated Applied Water Use shall be submitted with the Landscape Documentation Package.

  • When the Estimated Total Water Use is greater than the Estimated Applied Water Use due to precipitation being included as a source of water, an Effective Precipitation Disclosure Statement shall be included in the Landscape Documentation Package.

  • The recommended maximum is 25% of the Irrigated Landscape Area may be planted with low-water demand varieties of turf, providing the Estimated Applied Water Use is within the Maximum Applied Water Allowance.

  • The sum of the Estimated Applied Water Use for all individually metered areas shall not exceed the Maximum Applied Water Allowance (Water Budget) for the Landscape Area.

  • A calculation of the Estimated Applied Water Use shall be submitted with the Landscape Documentation Package.

  • The Estimated Applied Water Use shall be the sum of the water recommended in the monthly irrigation schedules for the established landscape based on local historical average evapotranspiration data from the CIMIS weather station in Castroville, California.

  • Any plants may be used in the landscape, providing the Estimated Applied Water Use recommended does not exceed the Maximum Applied Water Allowance.


More Definitions of Estimated Applied Water Use

Estimated Applied Water Use means the portion of the estimated total water use that is derived from applied water, as described in Appendix C, Section C4 .
Estimated Applied Water Use means the portion of the Estimated Total Water Use that is derived from applied water, as described in the current City of Lancaster Landscape and Irrigation Design Standards.
Estimated Applied Water Use or “EAWU” means the annual total amount of water estimated to keep plants in a healthy state. It is based on factors such as reference evapotranspiration rate, the
Estimated Applied Water Use means the portion of the estimated total water use that is derived from applied water.

Related to Estimated Applied Water Use

  • Maximum Applied Water Allowance (MAWA) means the upper limit of annual applied water for the established landscaped area as specified in Section 492.4. It is based upon the area's reference evapotranspiration, the ET Adjustment Factor, and the size of the landscape area. The Estimated Total Water Use shall not exceed the Maximum Applied Water Allowance. Special Landscape Areas, including recreation areas, areas permanently and solely dedicated to edible plants such as orchards and vegetable gardens, and areas irrigated with recycled water are subject to the MAWA with an ETAF not to exceed 1.0. MAWA = (ETo) (0.62) [(ETAF x LA) + ((1-ETAF) x SLA)]

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Estimated revenue means the amount of revenue estimated to be received from all sources during the budget year in each fund for which a budget is being prepared.

  • Bottled water means water that is placed in a safety sealed container or package for

  • Ground water means water below the land surface in a zone of saturation.

  • licensed water supplier means a company which is the holder for the time being of a water supply licence under Section 17A(1) of the 1991 Act(f);

  • estimated consumption means the consumption that a customer, whose consumption is not measured during a specific period, is deemed to have consumed and that is estimated by taking into account factors that are considered relevant by the Municipality and which may include the consumption of municipal services by the totality of the users of a service within the area where the service is rendered by the Municipality, at the appropriate level of service, for a specific time;

  • Quantity Surveyor means the quantity surveyor appointed by the Seller for the purposes of the Development;

  • MONTHLY KILOMETREAGE STATEMENT CUM BILL means the format specified by the Company.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Estimated Value means the value of the Contract estimated under these Contract and Procurement Regulations.

  • Allowable Costs means the costs defined as allowable in 42 CFR, Chapter IV, Part 413, as amended to October 1, 2007, except for the purposes of calculating direct medical education costs, where only the reported costs of the interns and residents are allowed. Further, costs are allowable only to the extent that they relate to patient care; are reasonable, ordinary, and necessary; and are not in excess of what a prudent and cost-conscious buyer would pay for the given service or item.

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Allowable Cost means a cost that complies with all legal requirements that apply to a particular federal education program, including statutes, regulations, guidance, applications, and approved grant awards.

  • Produced water means water extracted from the earth from an oil or natural gas production well, or that is separated from oil or natural gas after extraction.

  • Estimated Costs means costs estimated by the Authority as likely to be:

  • Current Assessed Value means the assessed value of the District certified by the municipal assessor as of April 1st of each year that the District remains in effect.

  • Used water means any water supplied by a public water supply system to a consumer's water system after it has passed through the service connection and is no longer under the control of the water supply official custodian.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.