{"component": "definition", "props": {"groups": [{"snippet_links": [{"key": "the-process", "type": "clause", "offset": [11, 22]}, {"key": "basic-sciences", "type": "definition", "offset": [154, 168]}, {"key": "engineering-sciences", "type": "definition", "offset": [187, 207]}, {"key": "to-convert", "type": "clause", "offset": [220, 230]}, {"key": "fundamental-elements", "type": "clause", "offset": [289, 309]}, {"key": "design-process", "type": "definition", "offset": [317, 331]}, {"key": "establishment-of", "type": "clause", "offset": [340, 356]}, {"key": "testing-and-evaluation", "type": "clause", "offset": [417, 439]}, {"key": "in-particular", "type": "clause", "offset": [602, 615]}, {"key": "the-words", "type": "definition", "offset": [616, 625]}], "snippet": "means that the process of devising a system, component, or process to meet desired needs. It is a decision-making process (often iterative), in which the basic sciences, mathematics, and engineering sciences are applied to convert resources optimally to meet a stated objective. Among the fundamental elements of the design process are the establishment of objectives and criteria, synthesis, analysis, construction, testing and evaluation. Central to the process are the essential and complementary roles of synthesis and analysis. This definition is intended to be interpreted in its broadest sense. In particular the words \u201csystem, component, or process\u201d and \u201cconvert resources optimally\u201d operate to indicate that sociological, economic, aesthetic, legal, ethical, etc., considerations can be included.", "size": 26, "samples": [{"hash": "gwsrxozcfxW", "uri": "https://fbpe.org/wp-content/uploads/2019/01/61G15-as-of-1.7.19.pdf", "label": "fbpe.org", "score": 9.507871321, "published": false}, {"hash": "jkVm8Gjh8ey", "uri": "https://fbpe.org/wp-content/uploads/2018/08/61G15-as-of-8-10-18.pdf", "label": "fbpe.org", "score": 9.302532512, "published": false}, {"hash": "3km7RaY5kPA", "uri": "https://fbpe.org/wp-content/uploads/2018/02/61G15-as-of-2-20-18.pdf", "label": "fbpe.org", "score": 9.0684462697, "published": false}], "hash": "c8b061256ceaa8cf357bfe8b43eca267", "id": 1}, {"snippet_links": [{"key": "the-process", "type": "clause", "offset": [6, 17]}, {"key": "basic-sciences", "type": "definition", "offset": [31, 45]}, {"key": "engineering-sciences", "type": "definition", "offset": [64, 84]}, {"key": "to-convert", "type": "clause", "offset": [97, 107]}, {"key": "a-course", "type": "clause", "offset": [160, 168]}, {"key": "to-qualify", "type": "clause", "offset": [169, 179]}, {"key": "the-decision-making-process", "type": "clause", "offset": [241, 268]}, {"key": "fundamental-elements", "type": "clause", "offset": [419, 439]}, {"key": "design-process", "type": "definition", "offset": [447, 461]}, {"key": "establishment-of", "type": "clause", "offset": [470, 486]}, {"key": "and-evaluation", "type": "clause", "offset": [556, 570]}, {"key": "the-content", "type": "clause", "offset": [572, 583]}], "snippet": "means the process by which the basic sciences, mathematics, and engineering sciences are applied to convert resources optimally to meet these stated needs. For a course to qualify as an engineering design course, the course must instruct on the decision making process in which the basic sciences and mathematics and engineering sciences are applied to convert resources optimally to meet a stated objective. Among the fundamental elements of the design process are the establishment of objectives and criteria, synthesis, analysis, construction, testing, and evaluation. The content of an engineering design course must include some of the following features:", "size": 6, "samples": [{"hash": "zRDyVudq5U", "uri": "http://iac.iga.in.gov/iac//T08640/A00011.PDF", "label": "iac.iga.in.gov", "score": 11.4271047228, "published": false}, {"hash": "dGGKDxAkIZU", "uri": "http://www.in.gov/legislative/iac/T08640/A00011.PDF", "label": "www.in.gov", "score": 10.1704312115, "published": false}, {"hash": "3FPBAHlxu45", "uri": "http://iac.iga.in.gov/iac//T08640/A00011.PDF?&iacv=iac2020", "label": "iac.iga.in.gov", "score": 9.0684462697, "published": false}], "hash": "6da2c6aa245851e5d992a6466cedaf05", "id": 2}, {"snippet_links": [{"key": "prepared-by", "type": "definition", "offset": [72, 83]}, {"key": "new-jersey", "type": "clause", "offset": [86, 96]}, {"key": "licensed-professional-engineer", "type": "definition", "offset": [97, 127]}, {"key": "solid-waste-facility", "type": "definition", "offset": [142, 162]}, {"key": "proposed-operation", "type": "clause", "offset": [171, 189]}], "snippet": "means reports and drawing, including a narrative operating description, prepared by a New Jersey licensed professional engineer to describe a solid waste facility and its proposed operation.", "size": 4, "samples": [{"hash": "55QbvflR6TZ", "uri": "https://www.trentonnj.org/DocumentCenter/View/9573/BID2025-27-SOLID-WASTE-TRACH-COLLECTION-ASSISTANCE---PW-SW?bidId=", "label": "www.trentonnj.org", "score": 19.9313296035, "published": false}, {"hash": "81Dr19UBSb1", "uri": "https://www.nj.gov/dep/dshw/resource/rules_docs/26%20CHAPTER%201.pdf", "label": "www.nj.gov", "score": 8.128678987, "published": false}, {"hash": "4aMtiUTytca", "uri": "https://www.nj.gov/dep/dshw/resource/CURRENT/WEB%20PDFS/26%20CHAPTER%201.pdf", "label": "www.nj.gov", "score": 6.9691991786, "published": false}], "hash": "c69996060e0fb21b9fc9fe5bf01cddc9", "id": 3}, {"snippet_links": [{"key": "the-plans", "type": "clause", "offset": [6, 15]}, {"key": "designs-and-specifications", "type": "clause", "offset": [17, 43]}, {"key": "by-seller", "type": "clause", "offset": [53, 62]}, {"key": "for-buyer", "type": "definition", "offset": [63, 72]}, {"key": "pertaining-to", "type": "definition", "offset": [73, 86]}, {"key": "the-system", "type": "clause", "offset": [145, 155]}, {"key": "in-accordance-with", "type": "definition", "offset": [156, 174]}], "snippet": "means the plans, designs and specifications prepared by SELLER for BUYER pertaining to complete supply of imported Equipment and Engineering for the System in accordance with Appendices I, II & IX. \u201c\u5de5\u7a0b\u8bbe\u8ba1\u201d\u610f\u6307\u6309\u7167\u9644\u5f551\uff08\u4e00\uff09\u30012\uff08\u4e8c\uff09\u30019\uff08\u4e5d\uff09\u4e2d\u6709\u5173\u4e8e\u7531\u9500\u552e\u65b9\u63d0\u4f9b\u7ed9\u91c7\u8d2d\u65b9\u4e3a\u5176\u7cfb\u7edf\u5b8c\u6210\u8fdb\u53e3\u8bbe\u5907\u548c\u5de5\u7a0b\u7684\u4f9b\u5e94\u800c\u51c6\u5907\u7684\u5e73\u9762\u56fe\u3001\u8bbe\u8ba1\u548c\u89c4\u8303\u8bf4\u660e\u3002", "size": 2, "samples": [{"hash": "6gd1G4FcHfM", "uri": "/contracts/6gd1G4FcHfM#engineering-design", "label": "Engineering Design / Equipment Supply / Supervision and Commissioning Contract", "score": 31.8436698075, "published": true}, {"hash": "f1UeRoBkyEO", "uri": "/contracts/f1UeRoBkyEO#engineering-design", "label": "Epc Contract for the Supply of Engineering Design and Equipment, and Supervision and Commissioning", "score": 29.7642791424, "published": true}], "hash": "a52a35af0ae82e70583e2189c9a16c72", "id": 4}, {"snippet_links": [{"key": "process-a", "type": "definition", "offset": [10, 19]}, {"key": "engineering-department", "type": "clause", "offset": [42, 64]}, {"key": "minimum-standards", "type": "definition", "offset": [121, 138]}], "snippet": "means the process a competent engineer or engineering department, uses to devise a system, component, or process to meet minimum standards.", "size": 1, "samples": [{"hash": "luqNxyV4I9R", "uri": "https://www.cbos.tas.gov.au/__data/assets/pdf_file/0014/405140/Occupational-Licensing-Standards-of-Electrical-Work-Code-of-Practice-2017.pdf", "label": "www.cbos.tas.gov.au", "score": 8.9575633128, "published": false}], "hash": "1094718f23a5355915b4d054c5198e02", "id": 5}, {"snippet_links": [{"key": "project-engineer", "type": "definition", "offset": [16, 32]}, {"key": "process-manager", "type": "definition", "offset": [118, 133]}, {"key": "project-controls", "type": "clause", "offset": [193, 209]}, {"key": "process-controls", "type": "clause", "offset": [233, 249]}, {"key": "design-architect", "type": "definition", "offset": [315, 331]}, {"key": "fire-protection", "type": "clause", "offset": [524, 539]}, {"key": "construction-manager", "type": "clause", "offset": [704, 724]}, {"key": "scope-of-work", "type": "definition", "offset": [794, 807]}, {"key": "commercial-facility", "type": "definition", "offset": [808, 827]}], "snippet": "\u2587\u2587\u2587\u2587\u2587\u2587 \u2587. \u2587\u2587\u2587\u2587\u2587 Project Engineer (Process Equip.) \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587 Project Engineer (Utilities Equip.): Haren Master Lead Process Manager: \u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Process Managers: \u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 & \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 Project Controls Manager: \u2587\u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 Process Controls/Instr./Automation: \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Process Architect \u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Design Architect: \u2587\u2587\u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587/\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587 Civil/Structural: Jun Bausa Electrical: \u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 HVAC/Utilities: \u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Piping: \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 Plumbing: \u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Piping Specs/MTO/Supports \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Fire Protection: \u2587\u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587 CIE Administrator/Coordinator: \u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587 Purchasing Lead: \u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 Project Subcontracts Manager \u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587 Validation Lead: \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 Resident Construction Manager: \u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587 Project Secretary: \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587\u2587\u2587 [KVAERNER(TM) LOGO] SCOPE OF WORK COMMERCIAL FACILITY DATE: NOVEMBER 26, 2001 IMCLONE SYSTEMS INCORPORATED REV.: E BRANCHBURG, NJ PAGE: 3 OF 29 --------------------------------------------------------------------------------", "size": 1, "samples": [{"hash": "6hP2cSbJQzV", "uri": "/contracts/6hP2cSbJQzV#engineering-design", "label": "Target Price Contract (Imclone Systems Inc/De)", "score": 18.0, "published": true}], "hash": "b0fc53929a90b0a372fb693f8e3a6033", "id": 6}, {"snippet_links": [{"key": "the-design", "type": "clause", "offset": [6, 16]}, {"key": "phase-of", "type": "clause", "offset": [30, 38]}, {"key": "the-project", "type": "definition", "offset": [39, 50]}, {"key": "key-features", "type": "definition", "offset": [61, 73]}, {"key": "major-deliverables", "type": "clause", "offset": [112, 130]}], "snippet": "means the design in the early phase of the project where the key features, structure, criteria for success, and major deliverables are all planned out.", "size": 1, "samples": [{"hash": "lf7NtOzQhHS", "uri": "https://sacramento.granicus.com/MetaViewer.php?view_id=22&clip_id=4399&meta_id=554741", "label": "sacramento.granicus.com", "score": 9.674880219, "published": false}], "hash": "a7312459ecc0d15a1613f312b30f431e", "id": 7}, {"snippet_links": [{"key": "report-prepared-by", "type": "clause", "offset": [29, 47]}, {"key": "design-basis", "type": "definition", "offset": [80, 92]}, {"key": "construction-of-the", "type": "clause", "offset": [101, 120]}, {"key": "wastewater-systems", "type": "definition", "offset": [127, 145]}, {"key": "as-amended", "type": "definition", "offset": [150, 160]}, {"key": "from-time-to-time", "type": "clause", "offset": [161, 178]}], "snippet": "means the engineering design report prepared by MPE Engineering and used as the design basis for the construction of the Local Wastewater Systems and as amended from time to time.", "size": 1, "samples": [{"hash": "1oGaoYEZOfQ", "uri": "/contracts/1oGaoYEZOfQ#engineering-design", "label": "Pipeline Emergency and Temporary Use Agreement", "score": 24.5345653662, "published": true}], "hash": "527ed7c48fc38c3df3ab15d74e00e493", "id": 8}, {"snippet_links": [{"key": "required-by", "type": "definition", "offset": [20, 31]}, {"key": "construction-law", "type": "clause", "offset": [39, 55]}, {"key": "other-regulations", "type": "clause", "offset": [60, 77]}, {"key": "the-employer", "type": "definition", "offset": [88, 100]}, {"key": "construction-permit", "type": "definition", "offset": [115, 134]}, {"key": "of-the-contractor", "type": "clause", "offset": [174, 191]}], "snippet": "means documentation required by Polish Construction Law and other regulations to enable the Employer to obtain the Construction Permit. The Engineering Design will form part of the Contractor\u2019s Document.", "size": 1, "samples": [{"hash": "5zT8ndKAMfd", "uri": "http://www.nfosigw.gov.pl/download/gfx/nfosigw/pl/nfoopisy/314/2/3/zolty_fidic_warunki_kontraktu_ang.doc", "label": "Contract", "score": 14.3894592745, "published": false}], "hash": "337e73e04429a4a197520371685cd14b", "id": 9}, {"snippet_links": [{"key": "the-process", "type": "clause", "offset": [11, 22]}], "snippet": "means that the process of devising a system, component, or process to meet desired needs. It is", "size": 1, "samples": [{"hash": "isudZPK7reU", "uri": "https://s3.amazonaws.com/suncam/docs/125.pdf", "label": "s3.amazonaws.com", "score": 8.5619438741, "published": false}], "hash": "2eb666f593cc2874ddef5a50e5d74ccf", "id": 10}], "next_curs": "Cl8SWWoVc35sYXdpbnNpZGVyY29udHJhY3RzcjsLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIbZW5naW5lZXJpbmctZGVzaWduIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"title": "Engineering Design", "snippet": "means that the process of devising a system, component, or process to meet desired needs. It is a decision-making process (often iterative), in which the basic sciences, mathematics, and engineering sciences are applied to convert resources optimally to meet a stated objective. Among the fundamental elements of the design process are the establishment of objectives and criteria, synthesis, analysis, construction, testing and evaluation. Central to the process are the essential and complementary roles of synthesis and analysis. This definition is intended to be interpreted in its broadest sense. In particular the words \u201csystem, component, or process\u201d and \u201cconvert resources optimally\u201d operate to indicate that sociological, economic, aesthetic, legal, ethical, etc., considerations can be included.", "size": 45, "id": "engineering-design", "examples": ["After the Town\u2019s final approval of record drawings, as-builts and certifications, the installation performance security shall be refunded to the applicant or terminated, in accordance with the Town of Morrisville Unified Development Ordinance (UDO) and <strong>Engineering Design</strong> and Construction Manual (EDCM).", "In addition to the documents referenced elsewhere in this contract and those noted below, Contractor shall comply with the requirements set forth in the most current version of the Georgia Tech Architectural and <strong>Engineering Design</strong> Standards for Building Technology (also known as the Georgia Tech \u201cYellow Book\u201d).", "The plan shall conform to the City\u2019s <strong>Engineering Design</strong> and Construction Standards Manual.", "The plan shall conform to <strong>Engineering Design</strong> and Construction Standards Manual.", "Requirements shall meet the <strong>Engineering Design</strong> Standards for Street Lights.", "SOFTWARE &amp; LICENSING TYPE COTS Volume Licensing Custom/Customized Hosting as part of delivery &amp; use On-Premise Off-Premise Managed Services SERVICES Basic Installation, Training and Maintenance Means that activity which does not require Consulting, Configuration, Engineering, Design or any other type of service specific to a Purchasing Entity requiring description of tasks and deliverables and agreement by the parties (Statement of Work).", "The COUNTY\u2019s required Record Drawing Media Standards are outlined in Chapter 10 of the Snohomish County <strong>Engineering Design</strong> and Development Standards (\u2587\u2587\u2587\u2587).", "<strong>Engineering Design</strong> and Development Standards may be downloaded at: \u2587\u2587\u2587\u2587://\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587.\u2587\u2587\u2587/492/Design-Standards-\u2587\u2587\u2587\u2587 *Electronic files can be transmitted through CONSULTANT\u2019s ftp site, OneDrive, Google Drive, or similar.", "If required, the CONSULTANT shall also provide data in hard copy according to specifications required by the AGENCY per the current <strong>Engineering Design</strong> and Development Standards 2021, Chapter 10.", "Additionally, in accordance with the Township\u2019s <strong>Engineering Design</strong> Standards, as-built plans certified by a licensed engineer, reviewed by the Township\u2019s engineer, shall be submitted to the Township."], "related": [["engineering", "Engineering", "Engineering"], ["engineering-control", "Engineering control", "Engineering control"], ["systems-engineering", "Systems Engineering", "Systems Engineering"], ["external-engineering-service", "external engineering service", "external engineering service"], ["engineering-services", "Engineering Services", "Engineering Services"]], "related_snippets": [], "updated": "2025-07-06T21:56:50+00:00"}, "json": true, "cursor": ""}}