Examples of E175 Covered Aircraft in a sentence
Contractor agrees to mitigate the risk of passenger ozone exposure on the E175 Covered Aircraft and CRJ Covered Aircraft through the use of a dispatcher product that detects the presence of ozone and adjusts to a higher altitude when ozone is absent.
Contractor’s early brake release performance relating to E175 Covered Aircraft for each calendar month (the “EBR Performance”) shall be determined by calculating the simple average of the EBR Periods for all Scheduled Flights.
Notwithstanding anything in the preceding sentence to the contrary, if Contractor and United mutually agree in writing that Spare Aircraft has not been evenly distributed throughout the network flown by Contractor (i.e., if all Spares are E175LL Spare Aircraft), then Contractor may operate an E175LL Spare Aircraft for a Scheduled Flight originally scheduled for an E175 Covered Aircraft.
The warranty shall not apply to the extent of any non-conformance which is caused by use of the Service contrary to the Supplier's instructions, or modification or alteration of the Service by any party other than the Supplier or the Supplier's duly authorised contractors or agents.
If the sum of the On-Time Adjustment Amount for the E175 Covered Aircraft plus the On-Time Adjustment Amount for the Bombardier Covered Aircraft is a positive number for a calendar month, then the Monthly Incentive Adjustment shall be increased by the absolute value of such sum for such month.
For each calendar month during the Term, an on-time adjustment amount (the “On-Time Adjustment Amount”) shall be determined as set forth in this Section 3.2(b) and Schedule 4; provided that the On-Time Adjustment Amount shall be calculated separately for the E175 Covered Aircraft, on the one hand, and Bombardier Covered Aircraft, on the other hand.
Its subsidiaries are principally involved in nominees and custodian services.
United shall have the right to designate which United Owned E175 Covered Aircraft shall be removed pursuant to a 2.4(b)(i) Notice by providing written notice of the same to Contractor within thirty (30) days following delivery of the 2.4(b)(i) Notice to Contractor.
Contractor shall ensure that all Scheduled Flights using E175 Covered Aircraft are capable of operating in Category 2 conditions (with respect to instrument landing systems), crew training and other requirements to provide such capability.
For clarification purposes, Contractor Owned E175 Covered Aircraft that are not the subject of a 2.4(b)(ii) Notice shall remain subject to the terms of this Agreement (including this Section 2.4).