{"component": "definition", "props": {"groups": [{"snippet_links": [{"key": "metric-tonne", "type": "definition", "offset": [10, 22]}], "size": 20, "snippet": "means dry metric tonne;", "samples": [{"hash": "6GX1ZkuNP7V", "uri": "/contracts/6GX1ZkuNP7V#dmt", "label": "Iron Ore Off Take Agreement (Alderon Iron Ore Corp.)", "score": 23.7022590637, "published": true}, {"hash": "w8XsEXtaQT", "uri": "/contracts/w8XsEXtaQT#dmt", "label": "Subscription Agreement (Alderon Iron Ore Corp.)", "score": 23.308008194, "published": true}, {"hash": "9NdAW83wK5i", "uri": "https://minedocs.com/29/TVI-Pacific-AIF-2024.pdf", "label": "minedocs.com", "score": 20.3826293945, "published": false}], "hash": "306e215be0ffc26bb9ec581e92c80df4", "id": 1}, {"snippet_links": [], "size": 18, "snippet": "means N, N-dimethyltryptamine.", "samples": [{"hash": "jiuJUN7u5Xp", "uri": "https://www.sec.gov/Archives/edgar/data/1833141/000183314123000013/cybin-informationcircularx.htm", "label": "Notice (Cybin Inc.)", "score": 22.7002048492, "published": false}, {"hash": "hb23zs98IRH", "uri": "https://s28.q4cdn.com/259445127/files/Cybin-Information-Circular-2023-2023-09-19-11-15.pdf", "label": "Notice", "score": 22.3580989838, "published": false}, {"hash": "al1bCksTZOO", "uri": "https://www.sec.gov/Archives/edgar/data/1833141/000162828025033606/cybin-annualinformationfor.htm", "label": "Cybin Inc.", "score": 20.4962348938, "published": false}], "hash": "ecfa42b3b51ccddb49d2a94176fc2c23", "id": 2}, {"snippet_links": [], "size": 12, "snippet": "means N,N-Dimethyltryptamine;", "samples": [{"hash": "bZxZFuQu52q", "uri": "/contracts/bZxZFuQu52q#dmt", "label": "Equity Distribution Agreement (Cybin Inc.)", "score": 36.9945259094, "published": true}, {"hash": "1jtscOmxgMk", "uri": "/contracts/1jtscOmxgMk#dmt", "label": "Equity Distribution Agreement (Cybin Inc.)", "score": 36.1129379272, "published": true}, {"hash": "lsSlISmlyzj", "uri": "/contracts/lsSlISmlyzj#dmt", "label": "Agency Agreement (Cybin Inc.)", "score": 35.2176589966, "published": true}], "hash": "aa9a2fd4255c5a676a2cb85970889240", "id": 3}, {"snippet_links": [], "size": 9, "snippet": "means dry metric tonnes.", "samples": [{"hash": "dt3AWJVfPaU", "uri": "/contracts/dt3AWJVfPaU#dmt", "label": "Offtake and Sales Agreement (Atlas Lithium Corp)", "score": 33.9137573242, "published": true}, {"hash": "bpaxuexWdPh", "uri": "/contracts/bpaxuexWdPh#dmt", "label": "Offtake and Sales Agreement (Atlas Lithium Corp)", "score": 33.3682403564, "published": true}, {"hash": "9TOog5VDrhy", "uri": "https://cdn.kscope.io/73e28af98d08feeb330b85e4ae7bdec3.pdf", "label": "cdn.kscope.io", "score": 19.57289505, "published": false}], "hash": "de831baa413188d143b9f1340f58f575", "id": 4}, {"snippet_links": [{"key": "metric-ton", "type": "definition", "offset": [12, 22]}, {"key": "moisture-content", "type": "clause", "offset": [35, 51]}], "size": 4, "snippet": "means a dry metric ton without any moisture content.", "samples": [{"hash": "gTkuLcNNT5m", "uri": "/contracts/gTkuLcNNT5m#dmt", "label": "Copper Concentrate Sales Agreement (Thompson Creek Metals Co Inc.)", "score": 26.3415470123, "published": true}, {"hash": "b4qmkQ0S4wo", "uri": "/contracts/b4qmkQ0S4wo#dmt", "label": "Copper Concentrate Sales Agreement (Thompson Creek Metals CO Inc.)", "score": 23.8555774689, "published": true}, {"hash": "4Lxstg7MgMl", "uri": "/contracts/4Lxstg7MgMl#dmt", "label": "Copper Concentrate Sales Agreement (Thompson Creek Metals CO Inc.)", "score": 23.6036968231, "published": true}], "hash": "15e44f4056f0f28d002132047f5814df", "id": 5}, {"snippet_links": [{"key": "metric-tonne", "type": "definition", "offset": [10, 22]}, {"key": "feasibility-study", "type": "clause", "offset": [25, 42]}, {"key": "technical-and", "type": "clause", "offset": [119, 132]}, {"key": "economic-viability", "type": "clause", "offset": [133, 151]}, {"key": "underground-mining", "type": "definition", "offset": [250, 268]}, {"key": "open-pit", "type": "definition", "offset": [314, 322]}, {"key": "method-of", "type": "definition", "offset": [356, 365]}, {"key": "financial-analysis", "type": "clause", "offset": [414, 432]}, {"key": "based-on", "type": "definition", "offset": [433, 441]}, {"key": "modifying-factors", "type": "definition", "offset": [472, 489]}, {"key": "the-evaluation", "type": "clause", "offset": [494, 508]}, {"key": "other-relevant-factors", "type": "clause", "offset": [516, 538]}, {"key": "a-qualified-person", "type": "definition", "offset": [564, 582]}, {"key": "acting-reasonably", "type": "clause", "offset": [584, 601]}, {"key": "to-determine", "type": "definition", "offset": [603, 615]}, {"key": "the-mineral", "type": "clause", "offset": [634, 645]}, {"key": "at-the-time", "type": "clause", "offset": [693, 704]}, {"key": "confidence-level", "type": "definition", "offset": [758, 774]}, {"key": "internal-rate-of-return", "type": "definition", "offset": [813, 836]}, {"key": "physical-characteristics", "type": "definition", "offset": [991, 1015]}, {"key": "application-of", "type": "clause", "offset": [1070, 1084]}, {"key": "sufficient-detail", "type": "clause", "offset": [1106, 1123]}, {"key": "planning-and-evaluation", "type": "clause", "offset": [1140, 1163]}, {"key": "the-deposit", "type": "clause", "offset": [1193, 1204]}, {"key": "sampling-and-testing", "type": "definition", "offset": [1288, 1308]}, {"key": "to-assume", "type": "clause", "offset": [1327, 1336]}, {"key": "points-of", "type": "clause", "offset": [1388, 1397]}, {"key": "lower-level", "type": "definition", "offset": [1447, 1458]}, {"key": "measured-mineral-resource", "type": "definition", "offset": [1497, 1522]}, {"key": "probable-mineral-reserve", "type": "definition", "offset": [1554, 1578]}, {"key": "basis-of", "type": "clause", "offset": [1733, 1741]}, {"key": "the-majority", "type": "clause", "offset": [2078, 2090]}, {"key": "inferred-mineral-resources", "type": "definition", "offset": [2094, 2120]}, {"key": "indicated-mineral-resources", "type": "definition", "offset": [2142, 2169]}, {"key": "life-of-mine", "type": "definition", "offset": [2210, 2222]}, {"key": "per-annum", "type": "definition", "offset": [2310, 2319]}], "size": 3, "snippet": "means dry metric tonne. \u201cFeasibility Study\u201d A Feasibility Study is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on the Modifying Factors and the evaluation of any other relevant factors which are sufficient for a Qualified Person, acting reasonably, to determine if all or part of the Mineral Resource may be converted to a Mineral Reserve at the time of reporting. A Pre- Feasibility Study is at a lower confidence level than a Feasibility Study. \u201cIRR\u201d means internal rate of return. \u201cIndicated Mineral Resource\u201d An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve. \u201cInferred Mineral Resource\u201d An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. \u201cLOM\u201d means life of mine. \u201cm\u201d means metre. \u201cMRE\u201d means a Mineral Resource estimate. \u201cMtpa\u201d means million tonnes per annum. \u201cMeasured Mineral A Measured Mineral Resource is that part of a Mineral Resource for which quantity,", "samples": [{"hash": "3o1SxXq3XCM", "uri": "https://www.aspecthuntley.com.au/asxdata/20200520/pdf/02237024.pdf", "label": "www.aspecthuntley.com.au", "score": 13.1831855774, "published": false}, {"hash": "herWdLTanLb", "uri": "https://www.championiron.com/wp-content/uploads/2020/05/cia-aif-2020.pdf", "label": "www.championiron.com", "score": 8.1895961761, "published": false}], "hash": "76acc140a61073d4ee6b8ba8674302f6", "id": 6}, {"snippet_links": [{"key": "of-the-borrower", "type": "clause", "offset": [79, 94]}], "size": 3, "snippet": "means Dynegy Marketing and Trade, a Colorado partnership, that is a Subsidiary of the Borrower.", "samples": [{"hash": "cOpf7uja6Ii", "uri": "/contracts/cOpf7uja6Ii#dmt", "label": "Facility and Security Agreement (Dynegy Inc.)", "score": 21.0, "published": true}, {"hash": "k9T9p6FhbxP", "uri": "/contracts/k9T9p6FhbxP#dmt", "label": "Facility and Security Agreement (Dynegy Holdings Inc)", "score": 19.0, "published": true}], "hash": "9d20e696ec3369348c448471af4944d6", "id": 7}, {"snippet_links": [{"key": "metric-tonne", "type": "definition", "offset": [10, 22]}], "size": 3, "snippet": "means dry metric tonne.", "samples": [{"hash": "5SwGwMxP8g5", "uri": "https://www.championiron.com/wp-content/uploads/2025/05/cil-2025-aif-final.pdf", "label": "www.championiron.com", "score": 20.3990516663, "published": false}, {"hash": "4uFsJdXeA7V", "uri": "https://www.championiron.com/wp-content/uploads/2024/05/cil-2024-aif-final.pdf", "label": "www.championiron.com", "score": 12.2046546936, "published": false}], "hash": "c26a3c97a4225e03205b5b38d09702e6", "id": 8}, {"snippet_links": [{"key": "the-software", "type": "definition", "offset": [6, 18]}, {"key": "management-tool", "type": "clause", "offset": [29, 44]}], "size": 2, "snippet": "means the Software \u201cDatabase Management Tool\u201d.", "samples": [{"hash": "iaGh2zUT0fq", "uri": "/contracts/iaGh2zUT0fq#dmt", "label": "End User License Agreement", "score": 20.8668842316, "published": true}, {"hash": "gXLdUjSK0Fj", "uri": "/contracts/gXLdUjSK0Fj#dmt", "label": "Support and Maintenance Agreement", "score": 20.8668842316, "published": true}], "hash": "ebcb13f876a91d0c5d4acd4b585f0cb5", "id": 9}, {"snippet_links": [{"key": "feasibility-study", "type": "clause", "offset": [1, 18]}, {"key": "technical-and", "type": "clause", "offset": [65, 78]}, {"key": "the-selected", "type": "clause", "offset": [97, 109]}, {"key": "development-option", "type": "definition", "offset": [110, 128]}, {"key": "modifying-factors", "type": "definition", "offset": [214, 231]}, {"key": "operational-factors", "type": "clause", "offset": [265, 284]}, {"key": "financial-analysis", "type": "clause", "offset": [298, 316]}, {"key": "at-the-time", "type": "clause", "offset": [352, 363]}], "size": 2, "snippet": "\u201cFeasibility Study\u201d means dry metric tonne.means a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable Modifying Factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting,", "samples": [{"hash": "4kyrKqoolBD", "uri": "https://www.championiron.com/wp-content/uploads/2019/07/aif-march-31-2019-june-19-2019-sedar.pdf", "label": "www.championiron.com", "score": 12.1697683334, "published": false}, {"hash": "4cd8rDWuedW", "uri": "https://sec.report/otc/financial-report/278214/Annual-Information-Form.pdf", "label": "sec.report", "score": 7.7310061455, "published": false}], "hash": "bf7a65e6ba0d7a459301f32b45d0e30e", "id": 10}], "next_curs": "ClASSmoVc35sYXdpbnNpZGVyY29udHJhY3RzciwLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIMZG10IzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"size": 99, "snippet": "means dry metric tonne;", "title": "DMT", "id": "dmt", "examples": ["US$ [***]/<strong>DMT</strong> shall be deducted for every 0.10% that the final content may be above [***]% up to [***]%.", "<strong>DMT</strong> G.P., L.L.C. <strong>DMT</strong> HOLDINGS, L.P. DYNEGY MARKETING AND TRADE DYNEGY COAL TRADING &amp; TRANSPORTATION, L.L.C. NGC STORAGE, INC.", "<strong>DMT</strong> Major End Customer Throughput Assignment to this tariff category is made upon User request.", "First, N,N\u00addimethyltryptamine (<strong>DMT</strong>) depro\u00ad tection of the monomer occurs, allowing the connec\u00ad tion of the next monomer by phosphoramidite coupling, followed by oxidation of the phosphite to a phosphate.", "Bismuth: US$ [***]/<strong>DMT</strong> shall be deducted for every 0.01% that the final content may be above [***]% up to [***]%.", "US$ [***]/<strong>DMT</strong> shall be deducted for every 0.10% that the final content may be above [***]% up to [***]%, andUS$ [***]/<strong>DMT</strong> flat shall be deducted if final content is equal to or greater than [***]% up to [***]%.", "If the shortfall is 500 <strong>DMT</strong> or less, then Seller shall be considered to be in compliance with Annual Quantity and the shortfall shall be considered cancelled with no obligation on Seller to ship any deficiency in the succeeding period.", "US$ [***]/<strong>DMT</strong> flat shall be deducted if final content is equal to or greater than [***]% up to [***]%.", "The expected value of a shipment of Product (Expected Value) is calculated by multiplying the price (as detailed in Schedule 1) by the Base Quantity (expressed in <strong>DMT</strong>) for that shipment (as detailed in Schedule 1).", "Hereby incorporated by reference, A double-blind, randomised, placebo-controlled study of ascending single and fixed repeat intravenous doses of <strong>DMT</strong> in healthy subjects (CHDR2227) Version 2.0, dated July 29, 2022."], "related": [["mgd", "MGD", "MGD"], ["cm", "CM", "CM"], ["soq", "SOQ", "SOQ"], ["mt", "MT", "MT"], ["mwh", "MWh", "MWh"]], "related_snippets": [], "updated": "2026-03-07T04:27:53+00:00"}, "json": true, "cursor": ""}}