Disposal and Destruction Plan definition

Disposal and Destruction Plan means the Plan to be developed by the Council governing retention and disposal of Personal Data

Examples of Disposal and Destruction Plan in a sentence

  • The Disposal and Destruction Plan shall be agreed no later than 3 months after the signing of this Agreement by both parties.

  • The Provider shall enter into a Disposal and Destruction Plan with the Council which will specify the requirements for the retention and disposal of Personal Data over the life of the Contract and on termination to ensure that Personal Data is not held longer than is necessary and that Personal Data is permanently and securely destroyed unless the Council instructs the Provider to transfer and/or supply Personal Data to the Council on termination or the Provider is required by law to retain Personal Data.

  • The implementation of the Disposal and Destruction Plan, including arrangements on termination shall be undertaken by the Provider at no cost to the Council.

  • TheProvider shall enter into a Disposal and Destruction Plan with the Council which will specify the requirements for the retention and disposal of Personal Data over the life of the Contract and on termination to ensure that Personal Data is not held longer than is necessary and that Personal Data is permanently and securely destroyed unless the Council instructs the Provider to transfer and/or supply Personal Data to the Council on termination or the Provider is required by law to retain Personal Data.

  • A comparison of the terms of the will and the instructions raised questions in my mind.

  • The implementation of the Disposal and Destruction Plan, including arrangements on termination shall be undertaken by the Provider at no cost to Rossendale Borough Council.

  • We can choose A = 4, u = 65536 and the pre- computation table is about 2MB.

Related to Disposal and Destruction Plan

  • electrical and electronic equipment or ‘EEE’ means equipment which is dependent on electric currents or electromagnetic fields in order to work properly and equipment for the generation, transfer and measurement of such currents and fields and designed for use with a voltage rating not exceeding 1 000 volts for alternating current and 1 500 volts for direct current;

  • Air pollution control equipment means a mechanism, device, or contrivance used to control or prevent air pollution, that is not, aside from air pollution control laws and administrative regulations, vital to production of the normal product of the source or to its normal operation.

  • Construction Plan means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan is a part of the construction plan.

  • Construction, panel, and floor covering adhesive means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Holding Tank Waste means any waste from holding tanks such as vessels, chemical toilets, campers, trailers, septic tanks, and vacuum-pump tank trucks.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • deforestation means direct human-induced conversion of forested land to non-forested land.

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • Environmental Infrastructure System means the Environmental Infrastructure Facilities of the Borrower, including the Project, for which the Borrower is receiving the Loan.

  • Construction and demolition debris means and includes:

  • National Pollutant Discharge Elimination System means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements under Sections 307, 402, 318, and 405 of the Clean Water Act.

  • Control apparatus means any device which prevents or controls the emission of any air contaminant directly or indirectly into the outdoor atmosphere.

  • aerodrome control service means air traffic control service for aerodrome traffic;

  • National Pollutant Discharge Elimination System Permit or “NPDES” means a permit issued by the MPCA as required by federal law for the purpose of regulating the discharge of pollutants from point sources into waters of the United States from concentrated animal feeding operations (CAFOs) as defined by federal law

  • Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Work, together with all supplements, amendments or corrections approved by the City in accordance with the Municipal Code and this Agreement.

  • industrial agreement means an agreement registered by the Commission under this Act as an industrial agreement;

  • Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Electrostatic application means the application to a substrate of charged atomized paint droplets that are deposited by electrostatic attraction.

  • Construction Completion Certificate means a document:

  • fall arrest equipment means equipment used to arrest a person in a fall, including personal equipment, a body harness, lanyards, deceleration devices, lifelines or similar equipment;

  • Processes with Significant Environmental Aspects means the Equipment which, during regular operation or if not properly operated or maintained, may cause or are likely to cause an adverse effect.

  • Reforestation means the renewal of vegetative cover by seeding, planting, or transplanting.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Disturbance Control Standard or “DCS” shall mean the reliability standard that sets the time limit following a disturbance within which a balancing authority must return its Area Control Error to within a specified range.