Disaster Management Manual definition

Disaster Management Manual means the manual “Special Scheme for Post Disaster Rehabilitation”, including the Disaster Management Implementation Guidelines for Environmental and Social Safeguards, and meeting the requirements of paragraph 1(b) of Section I.B of Schedule 2 to this Agreement and acceptable to the World Bank and the Recipient, as such manual may be amended or updated from time to time with the prior written agreement of the World Bank and the Recipient, and such term includes any annexes or schedules to such manual.
Disaster Management Manual means the document provided by Employer / Operator which provides for the procedure to be followed in the event of unforeseen contingencies affecting the Kolkata Metro East West Line or its operation.

Examples of Disaster Management Manual in a sentence

  • A set of emergency procedures shall be formulated to deal with different emergency situations and the operations staff shall be trained to respond appropriately during emergency through periodic simulated exercises as laid down in a Disaster Management Manual to be prepared and published by the Developer prior to COD.

  • Work with the appropriate engineering, life safety, and maintenance personnel for the development and implementation of the Emergency and Disaster Management Manual and all its components, designed for the specific property and property type.

  • H.B Grant from G.T.A The grant in aid shall be provided to the affected populace as per the rule of West Bengal Disaster Management Manual 2011.

  • Political philosophers can take up a normative po- sition within politics only at the price of becoming prescriptive anthropologists and disrespecting the people acting within politics.

  • The Recipient shall ensure that each Sub-project is the subject of a corresponding proposal for a Disaster Management Kecamatan Grant that has been prepared, submitted and reviewed in accordance with the guidelines, procedures and selection criteria set forth in the Project Manual, the supplemental Disaster Management Manual and this Annex.

  • Wendy's research includes work examining the determinants and impacts of audit qualifications in Australia and in emerging markets, auditor switching, audit committees, as well as factors affecting auditor judgment quality such as auditor specialisation.

  • Disaster Management Manual TRAINING How successfully the Disaster Management Department achieves its objectives, satisfies social responsibilities, or both, depends, to a large extent, on its officials.

  • The Recipient, through PMD, shall ensure that, prior to carrying out Sub-project works, the technical Facilitators shall have completed a technical review of each Sub-project in accordance with the Project Manual and supplemental Disaster Management Manual and the requirements of Annex 1 to this Schedule.

  • Disaster Management Manual 3.3.1. Relief Commissioner to satisfy himself about the preparation The State Relief Commissioner should satisfy himself that adequate preparations are being uniformly made in all districts in which distress is anticipated.

  • In the event of any conflict between the provisions of the Project Manual or the supplemental Disaster Management Manual and this Agreement, the latter shall prevail.

Related to Disaster Management Manual

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Disaster Management Act means the Disaster Management Act, 2002 (Act No.57 of 2002)

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Procurement Manual means the Procurement Manual under the Standard Operating Procedures prepared by the Borrower and endorsed by ADB, which sets forth procurement-related policies and procedures for externally-financed projects and programs;

  • Procurement Management means the Director of Lee County’s Procurement Management Department or designee.

  • Financial Management Manual means the Financial Management Manual, referred to in paragraph B of Schedule 4 to this Agreement, that sets out the financial and accounting arrangements for Implementing Partners and the Recipient’s entities, in form and substance satisfactory to the Association;

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Stormwater management system means any equipment, plants,

  • Best management practice (BMP means a structural device or nonstructural practice designed to temporarily store or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.

  • Disaster means the occurrence of one or more events which, either separately or cumulatively, mean that the Services, or a material part thereof will be unavailable (or could reasonably be anticipated to be unavailable) for the period specified in the Call Off Order Form (for the purposes of this definition the “Disaster Period”);

  • Procurement Manager means any person or designee authorized by a state agency or local public body to enter into or administer contracts and make written determinations with respect thereto.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Emergency medical services provider means a person who has received formal training in prehospital and emergency care, and is licensed to attend any person who is ill or injured or who has a disability. Police officers, firefighters, funeral home employees and other persons serving in a dual capacity one of which meets the definition of “emergency medical services provider” are “emergency medical services providers” within the meaning of this chapter.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Security Management Plan means the Supplier's security management plan prepared pursuant to paragraph 3 of schedule 2 an outline of which is set out in paragraph 2.7 of the Order Form as updated from time to time;

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Database Management System (“DBMS”) is a computer process used to store, sort, manipulate and update the data required to provide Selective Routing and ALI.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;