{"component": "definition", "props": {"groups": [{"samples": [{"hash": "984pYsYEqGq", "uri": "https://nandankanan.org/images/tender-doc/tender_120324174744.pdf", "label": "Notice", "score": 16.0965092402, "published": false}, {"hash": "2RSsJJapS4t", "uri": "https://hllhites.com/uploads/tenders/_1834922274.pdf", "label": "Contract", "score": 15.9678302533, "published": false}, {"hash": "2ZaYo9IJPgW", "uri": "https://mpmetrorail.com/uploads/files/1851-MPMRCL-2023_Dated-_18-Aug-2023_Circular_No_25-PC-2023_GCC_(with_encl).pdf", "label": "Joint Venture", "score": 15.9253935661, "published": false}], "snippet_links": [{"key": "by-the-contractor", "type": "clause", "offset": [136, 153]}, {"key": "and-other-documents", "type": "clause", "offset": [154, 173]}, {"key": "relating-to", "type": "definition", "offset": [174, 185]}, {"key": "design-of-the-works", "type": "clause", "offset": [190, 209]}, {"key": "of-the-contractor", "type": "clause", "offset": [253, 270]}], "snippet": "means all specifications, plans, drawings, details, graphs, sketches, models, levels, setting-out dimensions, calculations duly checked by the Contractor and other documents relating to the design of the Works prepared or to be prepared by or on behalf of the Contractor.", "size": 33, "hash": "f5845c08e7be027e53435933053b0a30", "id": 1}, {"samples": [{"hash": "gpQEYj0xKsp", "uri": "/contracts/gpQEYj0xKsp#design-data", "label": "Wep Strategic Partnering Agreement", "score": 31.6931013047, "published": true}, {"hash": "iEZp5dOJIXx", "uri": "/contracts/iEZp5dOJIXx#design-data", "label": "Wep Strategic Partnering Agreement", "score": 31.6848884773, "published": true}, {"hash": "kOlydZKzB70", "uri": "/contracts/kOlydZKzB70#design-data", "label": "Wep Strategic Partnering Agreement", "score": 26.4770704997, "published": true}], "snippet_links": [{"key": "other-data", "type": "definition", "offset": [84, 94]}, {"key": "relating-to", "type": "definition", "offset": [95, 106]}, {"key": "the-design", "type": "clause", "offset": [107, 117]}, {"key": "operation-of", "type": "definition", "offset": [148, 160]}, {"key": "a-site", "type": "definition", "offset": [161, 167]}], "snippet": "means all drawings, reports, documents, plans, software, formulae, calculations and other data relating to the design, construction, testing and/or operation of a Site;", "size": 26, "hash": "f92be96d7e0aa7b009cb6680a523d090", "id": 2}, {"samples": [{"hash": "hhbM3AQ7Wzm", "uri": "https://www.tourism.rajasthan.gov.in/content/dam/transport/metro/Business%20with%20Us/General%20condition%20of%20Contract%20(GCC)/P11D25-11-201317465162F_21_november_2013_Final_GCC.pdf.pdf", "label": "Contract", "score": 10.9466119097, "published": false}, {"hash": "5gJh3iboJ68", "uri": "http://164.100.222.222/content/dam/transport/metro/Business%20with%20Us/General%20condition%20of%20Contract%20(GCC)/P11D25-11-201317465162F_21_november_2013_Final_GCC.pdf.pdf", "label": "Contract", "score": 10.9466119097, "published": false}, {"hash": "jKeSdZHH92c", "uri": "https://www.tourism.rajasthan.gov.in/content/dam/transport/metro/Business%20with%20Us/Tenders%20Archive/Tender%202014/Nov%2014/RFP%20VARIOUS%20STATION%20BUILDINGS%20SITUATED%20ON%20JAIPUR%20METRO%20SECTION.(MANSAROVER%20TO%20CHANDPOLE)_07.11.2014.pdf", "label": "www.tourism.rajasthan.gov.in", "score": 7.4257357974, "published": false}], "snippet_links": [{"key": "checked-by", "type": "clause", "offset": [128, 138]}], "snippet": "means all specifications, plans, drawings, details, graphs, sketches, models, levels, setting-out dimensions, calculations duly checked by", "size": 11, "hash": "cb232434b5f87fd48c1ae35f4313f114", "id": 3}, {"samples": [{"hash": "43dUItLsjzZ", "uri": "https://www.edengeothermal.com/wp-content/uploads/2021/10/EGL-ITT-C067-Design-and-installation-of-a-heat-main-Ver-2.0.pdf", "label": "www.edengeothermal.com", "score": 10.8699520876, "published": false}, {"hash": "jYBnigymSi5", "uri": "https://www.edengeothermal.com/wp-content/uploads/2021/09/EGL-ITT-C067-Design-and-installation-of-a-heat-main-Ver-2.0.docx", "label": "www.edengeothermal.com", "score": 10.8699520876, "published": false}, {"hash": "1cSwy5cB3VF", "uri": "https://www.edengeothermal.com/wp-content/uploads/2020/07/EGL-ITT-C007-Ver-2.0.pdf", "label": "www.edengeothermal.com", "score": 10.2703627652, "published": false}], "snippet_links": [{"key": "and-other-documents", "type": "clause", "offset": [68, 87]}, {"key": "of-the-contractor", "type": "clause", "offset": [131, 148]}, {"key": "relating-to", "type": "definition", "offset": [149, 160]}, {"key": "the-design", "type": "clause", "offset": [161, 171]}, {"key": "the-works", "type": "clause", "offset": [204, 213]}], "snippet": "means all specifications, plans, drawings, graphs, sketches, models and other documents prepared or to be prepared by or on behalf of the Contractor relating to the design, construction, and aftercare of the works.", "size": 4, "hash": "f035c55301714d8cda0f569f11dfa78d", "id": 4}, {"samples": [{"hash": "eoeBgeaDDMy", "uri": "http://dfccil.gov.in/upload/1334712583579.pdf", "label": "dfccil.gov.in", "score": 10.1704312115, "published": false}, {"hash": "cM0NwMQZoL7", "uri": "https://dfccil.com/upload/Bid_Doc_BRKN-DER_RFO_Pt_1-4.pdf", "label": "dfccil.com", "score": 9.2422997947, "published": false}, {"hash": "gYl4wi17K9c", "uri": "https://dfccil.com/upload/Bid_Doc_Track_Bal_Works_Pt-1-4.pdf", "label": "dfccil.com", "score": 8.2621492129, "published": false}], "snippet_links": [{"key": "and-other-documents", "type": "clause", "offset": [152, 171]}, {"key": "related-to", "type": "clause", "offset": [172, 182]}, {"key": "design-of-the-works", "type": "clause", "offset": [187, 206]}], "snippet": ": means all survey and investigations, specifications, plans, drawings, details, graphs, sketches, models, levels, setting-out dimensions, calculations and other documents related to the design of the Works.", "size": 4, "hash": "784ba16deb9c1012e30c5cdb8988af35", "id": 5}, {"samples": [{"hash": "8OCV5jpzlZO", "uri": "/contracts/8OCV5jpzlZO#design-data", "label": "Project Agreement", "score": 21.0, "published": true}], "snippet_links": [{"key": "financial-calculations", "type": "clause", "offset": [35, 57]}, {"key": "design-information", "type": "definition", "offset": [69, 87]}, {"key": "other-materials", "type": "definition", "offset": [151, 166]}, {"key": "by-or-on-behalf-of", "type": "definition", "offset": [266, 284]}, {"key": "project-co", "type": "definition", "offset": [289, 299]}, {"key": "relating-to", "type": "definition", "offset": [300, 311]}, {"key": "the-design", "type": "clause", "offset": [312, 322]}, {"key": "construction-of-the-works", "type": "clause", "offset": [326, 351]}], "snippet": "means all calculations (other than financial calculations), designs, design information, specifications, plans, drawings, graphs, sketches, models and other materials, including all eye readable or computer or other machine readable data, prepared or to be prepared by or on behalf of the Project Co relating to the design or construction of the Works or any Variation.", "size": 4, "hash": "90f307ce8ff7d5919a21b5c9f2cde5f9", "id": 6}, {"samples": [{"hash": "lpnayab6eq6", "uri": "/contracts/lpnayab6eq6#design-data", "label": "General Conditions of Contract", "score": 21.7665982204, "published": true}, {"hash": "h7Fvj78m5G9", "uri": "/contracts/h7Fvj78m5G9#design-data", "label": "General Conditions of Contract", "score": 20.8165639973, "published": true}], "snippet_links": [{"key": "by-the-contractor", "type": "clause", "offset": [136, 153]}, {"key": "and-other-documents", "type": "clause", "offset": [154, 173]}, {"key": "relating-to", "type": "definition", "offset": [174, 185]}, {"key": "design-of-the-works", "type": "clause", "offset": [190, 209]}, {"key": "of-the-contractor", "type": "clause", "offset": [253, 270]}, {"key": "submitted-by", "type": "definition", "offset": [338, 350]}, {"key": "contractor-and-any", "type": "clause", "offset": [355, 373]}, {"key": "modification-of", "type": "clause", "offset": [374, 389]}, {"key": "from-time-to-time", "type": "clause", "offset": [412, 429]}, {"key": "the-engineer", "type": "clause", "offset": [457, 469]}, {"key": "notice-of", "type": "definition", "offset": [483, 492]}, {"key": "no-objection", "type": "clause", "offset": [493, 505]}, {"key": "the-scope", "type": "clause", "offset": [567, 576]}, {"key": "design-criteria", "type": "definition", "offset": [588, 603]}, {"key": "programme-of-work", "type": "clause", "offset": [631, 648]}, {"key": "where-applicable", "type": "clause", "offset": [676, 692]}, {"key": "in-the-contract", "type": "clause", "offset": [706, 721]}, {"key": "alterations-and-modifications", "type": "clause", "offset": [731, 760]}, {"key": "in-accordance-with", "type": "definition", "offset": [769, 787]}, {"key": "interim-payment-schedule", "type": "definition", "offset": [812, 836]}, {"key": "the-schedule", "type": "clause", "offset": [844, 856]}, {"key": "cost-centre", "type": "definition", "offset": [875, 886]}, {"key": "pricing-document", "type": "definition", "offset": [894, 910]}, {"key": "by-the-employer", "type": "clause", "offset": [924, 939]}, {"key": "in-relation-to", "type": "clause", "offset": [972, 986]}, {"key": "achievement-of-milestones", "type": "clause", "offset": [987, 1012]}, {"key": "clause-11", "type": "clause", "offset": [1101, 1110]}, {"key": "letter-of-acceptance", "type": "clause", "offset": [1122, 1142]}, {"key": "formal-acceptance", "type": "clause", "offset": [1154, 1171]}], "snippet": "means all specifications, plans, drawings, details, graphs, sketches, models, levels, setting-out dimensions, calculations duly checked by the Contractor and other documents relating to the design of the Works prepared or to be prepared by or on behalf of the Contractor. 1.1.1.9 \u201cDrawings\u201d means the Employer\u201fs Drawings and the Drawings submitted by the Contractor and any modification of such drawings as any, from time to time, be furnished or for which the Engineer has issued a Notice of No Objection. 1.1.1.10 \u201cEmployer\u201fs Requirements\u201d means the description of the scope, standard, design criteria, specifications, drawings, programme of work, indigenisation programme (where applicable) as included in the Contract, and any alterations and modifications thereto in accordance with the Contract. 1.1.1.11 \u201cInterim Payment Schedule\u201d means the schedule included for each Cost Centre in the Pricing Document and accepted by the Employer to be used for interim payments in relation to achievement of milestones under that Cost Centre, as the same may be revised from time to time in accordance with Clause 11. 1.1.1.12 \u201cLetter of Acceptance\u201d means the formal acceptance to work by the 1.", "size": 3, "hash": "38e89d7552c14de8073258c9502ba893", "id": 7}, {"samples": [{"hash": "g2Og7pRsSsK", "uri": "/contracts/g2Og7pRsSsK#design-data", "label": "Project Agreement", "score": 21.3271731691, "published": true}], "snippet_links": [{"key": "other-data", "type": "definition", "offset": [75, 85]}, {"key": "prepared-by", "type": "definition", "offset": [86, 97]}, {"key": "project-co", "type": "definition", "offset": [98, 108]}, {"key": "relating-to", "type": "definition", "offset": [109, 120]}, {"key": "construction-works", "type": "clause", "offset": [136, 154]}, {"key": "infrastructure-works", "type": "definition", "offset": [170, 190]}, {"key": "but-excluding", "type": "clause", "offset": [192, 205]}, {"key": "intellectual-property-rights-of-third-parties", "type": "clause", "offset": [206, 251]}, {"key": "in-the-process", "type": "definition", "offset": [293, 307]}], "snippet": "means all drawings, reports, documents, plans, formulae, calculations, and other data prepared by Project Co relating to the Design and Construction Works and the Public Infrastructure Works, but excluding Intellectual Property rights of third parties, such as CAD software, that is used only in the process of design and construction.", "size": 3, "hash": "cf70ca3d7c6c24d5d877ba9e02e1c834", "id": 8}, {"samples": [{"hash": "a03IpWP9OZV", "uri": "/contracts/a03IpWP9OZV#design-data", "label": "Commercial Subordinated Loan Agreement (Macquarie Infrastructure CO Trust)", "score": 18.0, "published": true}, {"hash": "4uQz323MMff", "uri": "/contracts/4uQz323MMff#design-data", "label": "Commercial Subordinated Loan Agreement (Macquarie Infrastructure Assets Trust)", "score": 18.0, "published": true}], "snippet_links": [{"key": "eligible-change", "type": "definition", "offset": [0, 15]}, {"key": "good-industry-practice", "type": "definition", "offset": [19, 41]}, {"key": "latent-defects", "type": "definition", "offset": [60, 74]}, {"key": "new-road", "type": "definition", "offset": [87, 95]}, {"key": "penalty-points", "type": "definition", "offset": [99, 113]}, {"key": "project-road", "type": "definition", "offset": [117, 129]}, {"key": "retention-account", "type": "definition", "offset": [133, 150]}, {"key": "safety-improvement", "type": "definition", "offset": [154, 172]}, {"key": "subsequent-scheme", "type": "definition", "offset": [195, 212]}, {"key": "termination-date", "type": "clause", "offset": [240, 256]}, {"key": "termination-event", "type": "definition", "offset": [260, 277]}, {"key": "traffic-data", "type": "clause", "offset": [281, 293]}, {"key": "warning-notice", "type": "definition", "offset": [297, 311]}, {"key": "works-programme", "type": "definition", "offset": [328, 343]}], "snippet": "ELIGIBLE CHANGE\"; \"GOOD INDUSTRY PRACTICE\"; \"IMPROVEMENT\"; \"LATENT DEFECTS\"; \"LEASE\"; \"NEW ROAD\"; \"PENALTY POINTS\"; \"PROJECT ROAD\"; \"RETENTION ACCOUNT\"; \"SAFETY IMPROVEMENT\"; \"SECTION\"; \"SITE\"; \"SUBSEQUENT SCHEME\"; \"TERMINATION ACCOUNTS\"; \"TERMINATION DATE\"; \"TERMINATION EVENT\"; \"TRAFFIC DATA\"; \"WARNING NOTICE\"; \"WORKS\"; AND \"WORKS PROGRAMME\".", "size": 2, "hash": "a81e4639ad7263f70f8816ab69e55b06", "id": 9}, {"samples": [{"hash": "3plWGYXjw1P", "uri": "https://www.sec.gov/Archives/edgar/data/1289788/000095012304014280/y97636a4exv10w20.txt", "label": "Macquarie Infrastructure CO Trust", "score": 2.0, "published": false}, {"hash": "lkNoUQN5sSL", "uri": "https://www.sec.gov/Archives/edgar/data/1289788/000095012304007153/y97636exv10w19.txt", "label": "Macquarie Infrastructure Assets Trust", "score": 2.0, "published": false}], "snippet_links": [{"key": "construction-information", "type": "clause", "offset": [43, 67]}, {"key": "other-materials", "type": "definition", "offset": [142, 157]}, {"key": "by-or-on-behalf-of", "type": "definition", "offset": [257, 275]}, {"key": "the-secretary-of-state", "type": "clause", "offset": [291, 313]}, {"key": "relating-to", "type": "definition", "offset": [314, 325]}, {"key": "the-design", "type": "clause", "offset": [326, 336]}, {"key": "construction-of-the-works", "type": "clause", "offset": [340, 365]}, {"key": "the-operation", "type": "clause", "offset": [389, 402]}, {"key": "the-project-facilities", "type": "clause", "offset": [434, 456]}], "snippet": "means all calculations, designs, design or construction information, standards, specifications, plans, drawings, graphs, sketches, models and other materials, including all eye readable or computer or other machine readable data, prepared or to be prepared by or on behalf of the DBFO Co or the Secretary of State relating to the design or construction of the Works or any Works Change or the operation, maintenance or improvement of the Project Facilities.", "size": 2, "hash": "9d15a9800512e82c227190dceb14c157", "id": 10}], "next_curs": "ClgSUmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjQLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIUZGVzaWduLWRhdGEjMDAwMDAwMGEMogECZW4YACAA", "definition": {"title": "Design Data", "snippet": "means all specifications, plans, drawings, details, graphs, sketches, models, levels, setting-out dimensions, calculations duly checked by the Contractor and other documents relating to the design of the Works prepared or to be prepared by or on behalf of the Contractor.", "size": 109, "id": "design-data", "examples": ["Signed by: NAME: AFFILIATION: EMAIL: AUTHOR CONTRIBUTION: Study Concept or <strong>Design Data</strong> Collection Data Analysis or Interpretation Writing the Paper Others ORCID: We agree to the terms as set out in the Agreement.", "NAME: AFFILIATION: EMAIL: AUTHOR CONTRIBUTION: Study Concept or <strong>Design Data</strong> Collection Data Analysis or Interpretation Writing the Paper Others ORCID: We agree to the terms as set out in the Agreement.", "Signed by: 9 [v.122016] NAME: AFFILIATION: EMAIL: AUTHOR CONTRIBUTION: Study Concept or <strong>Design Data</strong> Collection Data Analysis or Interpretation Writing the Paper Others ORCID: We agree to the terms as set out in the Agreement.", "AUTHOR CONTRIBUTION: Study Concept or <strong>Design Data</strong> Collection Data Analysis or Interpretation Writing the Paper Others We agree to the terms as set out in the Agreement.", "All correspondence, notices, drawings, <strong>Design Data</strong>, test reports, certificates, specifications and information shall be in English.", "Desktop Metal will implement and maintain reasonable and appropriate technical and organizational measures designed to protect <strong>Design Data</strong> against unauthorized access, accidental loss or damage, and unauthorized destruction.", "The Contractor shall procure that the Building Contractor establishes and maintains a computerised design database which the Contractor\u2019s Representative and the Authority\u2019s Representative may access remotely by computer to view drawings comprised within the <strong>Design Data</strong> (including Reviewable <strong>Design Data</strong>) and electronically store and print copies of such <strong>Design Data</strong>.", "This Attachment 1 is comprised of the Scope of Work (Attachment 1, Schedule 1-1), Scope of Facilities, Basis of Design, Basic Engineering <strong>Design Data</strong>, and other FEED Documents (Attachment 1, Schedule 1-2) (collectively the \u201cScoping Documents\u201d) incorporated into the Agreement.", "Buyer retains all right, title and interest in and to the <strong>Design Data</strong>.", "With effect from the date on which any item of Reviewable <strong>Design Data</strong> is or becomes an Approved RDD Item in accordance with the Review Procedure, the Contractor may proceed with the construction of the relevant part or parts of the Works (subject to the need to submit any associated Reviewable <strong>Design Data</strong> to review) in accordance with that Approved RDD Item."], "related": [["design-flow", "Design flow", "Design flow"], ["design-build-team", "Design-build team", "Design-build team"], ["design-manual", "Design Manual", "Design Manual"], ["design-builder", "Design-Builder", "Design-Builder"], ["contractor-software", "Contractor Software", "Contractor Software"]], "related_snippets": [], "updated": "2025-07-06T21:56:45+00:00"}, "json": true, "cursor": ""}}