Delivered total phosphorus load definition

Delivered total phosphorus load means the discharged mass load of total phosphorus from a point
Delivered total phosphorus load means the discharged mass load of total phosphorus from a point source that is adjusted by the delivery factor for that point source.
Delivered total phosphorus load means the discharged mass load of total phosphorus from a point source that is adjusted by

Related to Delivered total phosphorus load

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Transit Traffic means traffic originating on CLEC’s network that is switched and transported by AT&T-TSP and delivered to a Third Party Terminating Carrier’s network or traffic from a Third Party Originating Carrier’s network. A call that is originated or terminated by a CLEC purchasing local switching pursuant to a commercial agreement with AT&T-TSP is not considered Transit Traffic for the purposes of this Attachment. Additionally Transit Traffic does not include traffic to/from IXCs.

  • Total tetrahydrocannabinol means the sum of the percentage by weight of tetrahydrocannabinolic acid multiplied by eight hundred seventy-seven thousandths plus the percentage of weight of tetrahydrocannabinol.

  • Accelerator-produced material means any material made radioactive by a particle accelerator.

  • Loop Concentrator/Multiplexer or "LCM" is the Network Element that does one or more of the following: aggregates lower bit rate or bandwidth signals to higher bit rate or bandwidth signals (multiplexing); disaggregates higher bit rate or bandwidth signals to lower bit rate or bandwidth signals (demultiplexing); aggregates a specified number of signals or channels to fewer channels (concentrating); performs signal conversion, including encoding of signals (e.g., analog to digital and digital to analog signal conversion); or in some instances performs electrical to optical (E/O) conversion. LCM includes DLC, and D4 channel banks and may be located in Remote Terminals or Central Offices.

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • Small quantity generator means a generator who generates less than 1000 kg of hazardous waste in a calendar month.

  • Combined sewer overflow means the discharge of untreated or

  • True vapor pressure means the equilibrium partial pressure exerted by a petroleum liquid as determined in accordance with methods described in American Petroleum Institute (API) Bulletin 2517, Evaporation Loss from External Floating Roof Tanks, 1980. The API procedure may not be applicable to some high viscosity or high pour crudes. Available estimates of true vapor pressure may be used in special cases such as these.

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Transit Traffic MOUs means all Transit Traffic minutes of use to be billed at the Transit Traffic rate by AT&T-TSP.

  • Shared Transport is defined as local interoffice transmission facilities shared by more than one Carrier, including Qwest, between End Office Switches, between End Office Switches and Tandem Switches (local and Access Tandem Switches), and between Tandem Switches within the Local Calling Area, as described more fully in the Agreement.

  • Palletized unit load means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.

  • Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.

  • Integrated Digital Loop Carrier means a subscriber loop carrier system that is twenty-four (24) local Loop transmission paths combined into a 1.544 Mbps digital signal which integrates within the switch at a DS1 level.

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Service Switching Point (SSP) is a telephone central office switch equipped with a Signaling System 7 (SS7) interface.

  • Check Meter means the Buyer revenue-quality meter section(s) or meter(s), which Buyer may require at its discretion, and which will include those devices normally supplied by Buyer or Seller under the applicable utility electric service requirements.