Converter Station definition

Converter Station means the converter station and associated electrical equipment to be constructed as part of the Development and which comprises Work No.2; “Converter Station Access Works”
Converter Station means one converter station built for the purpose of transmission of electricity within the parameters of one only of either Option B(i) or (ii) as shown on the plan entitled "Converter Station and Telecommunications Buildings Parameter Plans Combined Options" with Plan Reference EN020022-2.6-PARA-Sheet1 REV 02, the plan entitled "Converter Station and Telecommunications Buildings Parameter Plans Option B(i)" with Plan Reference EN020022-2.6-PARA-Sheet2 REV 03, and the plan entitled "Converter Station and Telecommunications Buildings Parameter Plans Option B(ii)" with Plan Reference EN020022-2.6-PARA-Sheet3 REV 03, north of the existing pylon line on the northern part of the Affected Property;

Examples of Converter Station in a sentence

  • At no time will it be necessary for the Connecting Transmission Owner to provide station service via the 345kV AC cable to the Converter Station.

  • Failure of a single temporary overvoltage control equipment, including the Converter Station, shall not cause the overvoltage criteria to be exceeded.

  • These protective systems include but are not limited to the Western Montana Generation Dropping Scheme LAPS, Miles City Converter Station Tripping RAS, Shelby Area UVLS, and Western-UGP’s UFLS Program in the Western Interconnection.

  • The Labrador section is to carry two electrode conductors from the Muskrat Falls Converter Station to ▇▇▇▇▇▇▇ ▇▇▇▇▇ (▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇ - ▇▇▇▇▇▇▇▇).

  • The Project requires fiber from a Converter Station in Canada through Lake Champlain to a Converter Station in Ludlow, VT (the “Fiber Route”) and does not require any “fiber off-ramp facilities” along the route.

  • In recognition of the lack of housing available within a reasonable distance of the ▇▇▇▇▇▇ Converter Station, employees assigned a ▇▇▇▇▇▇ headquarters zone will receive a special allowance of $5.50 for each day they are required and report for work.

  • Employees assigned to work at the ▇▇▇▇ Converter Station will receive a special travel rate of $5.50 for each day they are required and report for work to the ▇▇▇▇ Station.

  • Selected Project work items and related components and work may generally include, without limitation: Wind Turbine Foundations, Monopiles, Wind Turbines, Inter-Array Cables, Offshore Converter Stations, Offshore Export (Submarine) Cables – State and Federal Waters, Horizontal Directional Drilling and Cables, Electrical Duct Bank and Civil, Onshore Transmission Cables, Fiber Optic Cables, Onshore Converter Station and Onshore Interconnection Cables.

  • The Project comprises the following components and associated civil works: the Converter Station Component; the new 400kV overhead line connecting the Chisinau and Vucanesti substations (single-circuit with pre-fitted for extension to double-circuit); the new 400/330kV bay at the Chisinau substation; and the extension of the existing 400kV station in Vulcanesti, including the upgrade of the communication infrastructure of the existing Isaccea (RO)-Vulcanesti (MD) high voltage line.

  • In January 2017, the CD0504-002 Contractor made a claim presentation to the Contractor for the HVdc Converter Station at Muskrat Falls (CD0501) and the Contractor for the HVac Substations at ▇▇▇▇▇▇▇▇▇ Falls and Muskrat Falls, and Labrador Transco/General Partner, setting the basis for their claim.