{"component": "definition", "props": {"groups": [{"size": 73, "snippet_links": [{"key": "the-specifications", "type": "clause", "offset": [65, 83]}, {"key": "the-commissioner", "type": "clause", "offset": [133, 149]}], "samples": [{"hash": "dkugTnOE0EH", "uri": "https://a856-cityrecord.nyc.gov/Search/GetFile?sectionId=6&requestId=20171218014&requestStatus=Archived&documentId=37010", "label": "Service Contract", "score": 14.1704311371, "published": false}, {"hash": "iWbVMDPe3T", "uri": "https://a856-cityrecord.nyc.gov/Search/GetFile?SectionID=6&RequestStatus=Archived&RequestID=20151118008&DocumentID=25592", "label": "Contract", "score": 14.1704311371, "published": false}, {"hash": "32ontGESbv6", "uri": "https://a856-cityrecord.nyc.gov/Search/GetFile?SectionID=6&RequestStatus=Archived&RequestID=20121016016&DocumentID=24618", "label": "Contract", "score": 14.1704311371, "published": false}], "snippet": "means those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.", "hash": "fb531496c730fb27c556ebb32ef0d3d8", "id": 1}, {"size": 57, "snippet_links": [{"key": "the-specifications", "type": "clause", "offset": [70, 88]}, {"key": "the-commissioner", "type": "clause", "offset": [138, 154]}], "samples": [{"hash": "iCUynOY8IPf", "uri": "/contracts/iCUynOY8IPf#contract-drawings", "label": "Construction Contract", "score": 27.6617984772, "published": true}, {"hash": "knYZE9fqMlA", "uri": "/contracts/knYZE9fqMlA#contract-drawings", "label": "Standard Construction Contract", "score": 26.2026519775, "published": true}, {"hash": "eEtHzmOARaR", "uri": "/contracts/eEtHzmOARaR#contract-drawings", "label": "Proposal for Bids", "score": 26.1704311371, "published": true}], "snippet": "means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.", "hash": "38d0ed9a56c25fa4c0e0186c0ca1d986", "id": 2}, {"size": 55, "snippet_links": [{"key": "the-contract-documents", "type": "clause", "offset": [44, 66]}, {"key": "the-design", "type": "clause", "offset": [114, 124]}, {"key": "of-the-work", "type": "clause", "offset": [150, 161]}], "samples": [{"hash": "fKckEZy0AZO", "uri": "https://www.surrey.ca/sites/default/files/media/tender_docs/RFQ-2025-022-Fleetwood-Rec-Centre-Library-Glazing-Replacement.pdf", "label": "www.surrey.ca", "score": 20.4046802521, "published": false}, {"hash": "apDdpvL9vz5", "uri": "https://www.surrey.ca/sites/default/files/media/tender_docs/RFQ-2025-011-Surrey-Art-Gallery-Roof-Replacement.pdf", "label": "www.surrey.ca", "score": 20.1544399261, "published": false}, {"hash": "ignDK4Q1uPe", "uri": "https://www.surrey.ca/sites/default/files/media/tender_docs/RFQ-2025-029-Surrey-Sports-and-Leisure-Complex-HVAC-Optimization,-Mechanical.pdf", "label": "www.surrey.ca", "score": 20.1435680389, "published": false}], "snippet": "means the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details and diagrams;", "hash": "8f81ece563faaf75a7bc799cccbc4631", "id": 3}, {"size": 52, "snippet_links": [{"key": "in-the-contract", "type": "clause", "offset": [62, 77]}, {"key": "pursuant-to-the", "type": "definition", "offset": [116, 131]}], "samples": [{"hash": "fZ3qShTqWQG", "uri": "/contracts/fZ3qShTqWQG#contract-drawings", "label": "Service Agreement", "score": 26.2416152954, "published": true}, {"hash": "lWiZMpZUHAa", "uri": "/contracts/lWiZMpZUHAa#contract-drawings", "label": "Supply and Service Agreement", "score": 26.1704311371, "published": true}, {"hash": "kX9lqro0NmN", "uri": "/contracts/kX9lqro0NmN#contract-drawings", "label": "Furnish and Install Agreement", "score": 26.1704311371, "published": true}], "snippet": "means those drawings specifically entitled as such and listed in the Contract, and any drawings furnished by NYCDOT pursuant to the Contract.", "hash": "745cbadfd7d8c2000bd63798a998e945", "id": 4}, {"size": 35, "snippet_links": [{"key": "plans-and-drawings", "type": "definition", "offset": [10, 28]}, {"key": "the-work", "type": "definition", "offset": [40, 48]}], "samples": [{"hash": "ctqDIz8CbOn", "uri": "https://www.essatownship.on.ca/media/xllhen0f/rfq-epw-25-004-line-painting.pdf", "label": "www.essatownship.on.ca", "score": 20.0774650574, "published": false}, {"hash": "9NlU25BMkLA", "uri": "https://www.essatownship.on.ca/media/roikwytf/rfq-epw-25-003-street-sweeping.pdf", "label": "www.essatownship.on.ca", "score": 18.1162147522, "published": false}, {"hash": "j8xWhIp6UWt", "uri": "https://www.essatownship.on.ca/media/scfdfmlq/rfq-epw-25-001-sand-gravel.pdf", "label": "www.essatownship.on.ca", "score": 18.0663204193, "published": false}], "snippet": "means the plans and drawings describing the Work.", "hash": "9ab1475167cfa2296c9b85be0d67b97d", "id": 5}, {"size": 28, "snippet_links": [{"key": "drawings-or-plans", "type": "clause", "offset": [52, 69]}, {"key": "of-the-city", "type": "clause", "offset": [115, 126]}, {"key": "drawings-submitted", "type": "clause", "offset": [242, 260]}, {"key": "terms-of-this-contract", "type": "clause", "offset": [281, 303]}, {"key": "the-successful-bidder", "type": "definition", "offset": [307, 328]}, {"key": "to-the-city", "type": "clause", "offset": [376, 387]}, {"key": "approved-by", "type": "definition", "offset": [400, 411]}, {"key": "the-engineer", "type": "definition", "offset": [412, 424]}, {"key": "submitted-by", "type": "definition", "offset": [445, 457]}, {"key": "to-the-contractor", "type": "clause", "offset": [471, 488]}, {"key": "progress-of-the-work", "type": "clause", "offset": [500, 520]}], "samples": [{"hash": "2lvnLETAGjq", "uri": "https://cityofukiah.com/wp-content/uploads/2024/08/Appendix-D-Special-Provisions-for-Great-Redwood-Trail-Phase-4-Spec.-no-21-02.pdf", "label": "cityofukiah.com", "score": 16.6135940552, "published": false}, {"hash": "d5wwmki7NiS", "uri": "https://cityofukiah.com/wp-content/uploads/2023/05/Ukiah-Streetscape-Ph-II_100-Special-Provisions-2023-02-22.pdf", "label": "cityofukiah.com", "score": 15.738776207, "published": false}, {"hash": "5evvgXTfEFG", "uri": "https://www.bidnet.com/bneattachments?/763153610.pdf", "label": "www.bidnet.com", "score": 9.1327857971, "published": false}], "snippet": ", \"drawings\", \"plans\" shall mean and include 1) all drawings or plans which may have been prepared by or on behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, 2) all drawings submitted in pursuance of the terms of this contract by the successful bidder with his or her proposal and by the Contractor to the City if and when approved by the Engineer and 3) all drawings submitted by the Engineer to the Contractor during the progress of the work as provided for herein.", "hash": "a6a0dc0e6aeb88a3b2d1511d54fbb634", "id": 6}, {"size": 21, "snippet_links": [{"key": "the-contract-documents", "type": "clause", "offset": [81, 103]}], "samples": [{"hash": "ekKV1HLRtG4", "uri": "/contracts/ekKV1HLRtG4#contract-drawings", "label": "Sanitary Sewer Main Flushing Contract", "score": 23.3436012268, "published": true}, {"hash": "6IeykKhTs1g", "uri": "https://www.fairfaxwater.org/sites/default/files/solicitations/IFB%2022-051%20-%20GUM%20SPRINGS%20NO.2%20REHABILITATION.pdf", "label": "www.fairfaxwater.org", "score": 17.5177116394, "published": false}, {"hash": "xPMbPKfSNj", "uri": "https://www.fairfaxwater.org/sites/default/files/solicitations/IFB%2022-029%20-%20Water%20Main%20Installation%20and%20Service%20Contract.pdf", "label": "Service Contract", "score": 13.1984939575, "published": false}], "snippet": "or \"DRAWINGS\" shall mean only those drawings specifically referred to as such in the Contract Documents.", "hash": "cbe71d3ca89c8d1cba33bde824bfe1b2", "id": 7}, {"size": 19, "snippet_links": [{"key": "the-drawings", "type": "definition", "offset": [25, 37]}, {"key": "the-contract-documents", "type": "clause", "offset": [50, 72]}, {"key": "shop-drawings", "type": "clause", "offset": [193, 206]}, {"key": "by-the-company", "type": "clause", "offset": [236, 250]}, {"key": "reviewed-by", "type": "definition", "offset": [255, 266]}], "samples": [{"hash": "1JkIss6ITme", "uri": "https://www.ttc.ca/PDF/M_and_P/00%2072%2000%20General%20Conditions%20RFB.pdf", "label": "Contract", "score": 11.6255989075, "published": false}, {"hash": "gMVt0b722ZL", "uri": "https://ttc-cdn.azureedge.net/-/media/Project/TTC/DevProto/Documents/Home/Doing-business-with-the-TTC/00-72-00-General-Conditions-RFB.pdf?rev=301925be853146d08d6ce51a3361df66&hash=F4268097AAE6821A03C11832AD25C59C", "label": "Contract", "score": 9.4435319901, "published": false}, {"hash": "cuXL2NEhuX4", "uri": "https://www.ttc.ca/TTC_Business/Materials_and_procurement/Ads_PandS/PDF%20Files/SUPPLY%20OF%20MODULES%20FOR%20ORION%207%20BUSES%20-T06BH14074.pdf", "label": "www.ttc.ca", "score": 7.3353867531, "published": false}], "snippet": "or \"Drawings\" shall mean the drawings included in the Contract Documents, any supplementary or revised drawings furnished by the TTC\u2019s Representative and incorporated into the Contract and the shop drawings and other drawings submitted by the Company and reviewed by the TTC\u2019s Representative.", "hash": "e87d07ba5cbb7c7e6ce0548792e9e9a9", "id": 8}, {"size": 18, "snippet_links": [{"key": "the-commissioner", "type": "clause", "offset": [34, 50]}], "samples": [{"hash": "6A3ZUVdSQWZ", "uri": "https://www.bidnet.com/bneattachments?/409225985.pdf", "label": "Agreement", "score": 12.292265892, "published": false}, {"hash": "jgpqISKb3P", "uri": "https://www1.nyc.gov/assets/doh/downloads/pdf/acco/2014/acco-ifb-15BS000600R0X00.pdf", "label": "Agreement", "score": 11.4804925919, "published": false}, {"hash": "eVkK9X9EUU2", "uri": "https://a856-cityrecord.nyc.gov/Search/GetFile?sectionId=6&requestId=20201224101&requestStatus=Archived&documentId=171769", "label": "Service Agreement", "score": 11.3545513153, "published": false}], "snippet": "means those drawings furnished by the Commissioner in any", "hash": "1b0b775f4c08ff357b2d3f659bd551d8", "id": 9}, {"size": 15, "snippet_links": [{"key": "supplied-by-the-contractor", "type": "clause", "offset": [72, 98]}, {"key": "the-execution", "type": "clause", "offset": [103, 116]}, {"key": "by-the-purchaser", "type": "clause", "offset": [145, 161]}], "samples": [{"hash": "ju2Za0QEDt8", "uri": "https://midhani-india.in/WordPress-content/uploads/2019/07/NIT-DEEP-HOLE-DRILLING-compressed.pdf", "label": "Notice", "score": 13.7227926254, "published": false}, {"hash": "jgE8QsRKhme", "uri": "https://midhani-india.in/WordPress-content/uploads/2020/02/NIT-Metal-Powder.pdf", "label": "Notice", "score": 13.1656398773, "published": false}, {"hash": "5dXJKmJPMgU", "uri": "https://midhani-india.in/WordPress-content/uploads/2019/04/NITCFApril.pdf", "label": "midhani-india.in", "score": 9.6433944702, "published": false}], "snippet": "means the designs, plans drawings, sketches and details which have been supplied by the Contractor for the execution of the Contractand approved by the Purchaser.", "hash": "0da6199d9abe7ceb1c2f5cb649754ac8", "id": 10}], "next_curs": "Cl4SWGoVc35sYXdpbnNpZGVyY29udHJhY3RzcjoLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIaY29udHJhY3QtZHJhd2luZ3MjMDAwMDAwMGEMogECZW4YACAA", "definition": {"title": "Contract Drawings", "size": 489, "snippet": "means those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.", "id": "contract-drawings", "examples": ["All work, labor and materials to be furnished under this Contract shall be furnished strictly pursuant to, and in conformance with the specifications, and the instructions of the City\u2019s designee as given from time to time during the progress of the work, under the terms of this Contract, and in accordance with <strong>Contract Drawings</strong>.", "The Contractor shall provide all labor, materials, equipment and scheduling necessary in order to demolish/remove those items specified on the <strong>Contract Drawings</strong> for demolition/removal and shall be responsible for any degree of unforeseen difficulty in the removal of said items.", "Unless otherwise expressly provided in the <strong>Contract Drawings</strong>, Specifications and Addenda, the work shall be performed in accordance with the best modern practice for work of this character and in accordance with industry standards, to the Satisfaction of the Assistant Commissioner, or designee.", "Where Plans or Specifications or <strong>Contract Drawings</strong> state that materials, processes, or procedures must be approved by the Division of State Architect, State Fire \u2587\u2587\u2587\u2587\u2587\u2587\u2587\u2587, or other body or agency, Contractor shall be responsible for satisfying requirements of such bodies or agencies.", "If Contractor observes that Plans or Specifications or <strong>Contract Drawings</strong> are at variance therewith, in consultation with District, Contractor shall promptly notify Architect in writing and any changes deemed necessary by the Architect shall be adjusted as provided for changes in Work.", "The &quot;<strong>Contract Drawings</strong>&quot; or &quot;Drawings&quot; are the plans and working drawings which show the location, character, dimensions and details of the Work to be performed, and all supplemental drawings issued by District.", "For convenience, the Plans, Specifications and <strong>Contract Drawings</strong> in the Contract Documents are arranged in several sections, but this separation shall not be considered as the limits of the work required of any separate trade.", "Where drawings are provided, work not specified in the specifications nor detailed on the <strong>Contract Drawings</strong> but required in carrying out their intent or in the complete and proper execution of the work, is required, and shall be performed by the Contractor.", "Pursuant to Government Code section 4215, District assumes the responsibility for removal, relocation, and protection of utilities located on the Site at the time of commencement of construction under this Facilities Lease with respect to any such utility facilities which are not identified in the <strong>Contract Drawings</strong>, Plans and Specifications.", "Where investigations of subsurface conditions have been made by or on behalf of District with respect to subsurface conditions, utilities, foundations, or other structural designs, and that information is shown on the <strong>Contract Drawings</strong> or Plans, it represents only a statement by District as to the character of the materials which have been encountered by District\u2019s investigation."], "related": [["shop-drawings", "Shop Drawings", "Shop Drawings"], ["working-drawings", "Working Drawings", "Working Drawings"], ["construction-drawings", "Construction Drawings", "Construction Drawings"], ["as-built-drawings", "As-built drawings,", "As-built drawings,"], ["drawings", "Drawings", "Drawings"]], "related_snippets": [], "updated": "2025-07-26T06:10:51+00:00"}, "json": true, "cursor": ""}}