Construction Method definition
Examples of Construction Method in a sentence
Include contact names for each supplier and attach warranties when possible.) Technique or Construction Method: (List all architects and fabricators.
No work on the airside will be allowed until the Employer has approved this Construction Method Statement.
The Contractor shall indicate in his Construction Method Statement how he will manage an emergency where a plant item breaks down during an operation being undertaken on the airside within the 50 m restriction zone, to ensure timeous opening of the taxiway (i.e. all limited occupation period works, especially runway tie-in areas between stop-bar and runway shoulders).
Once approved, the Construction Method Statement will form part of the Procedure Manual for Working Airside (Volume 5).
Within 14 days of award of the contract the Contractor shall draw up and submit a detailed Construction Method Statement addressing i.e. safety and contingency plan to ACSA for approval.
Include contact names for each supplier and attach warranties when possible.) Material Thickness: Welding or Joint Material: Welding Rod Alloy or Joint Material: Casting Alloy, Wax Body, Glass or Fiber Type: Framing Materials and Construction Method: (List type and brand name for all materials; attach Material Safety and Technical Data Sheets.
Within 14 days of the Commencement Date the Contractor shall submit a Construction Method Statement to the Employer’s Agent for approval by the Employer.
ARTIST shall present to UNIVERSITY in advance, for further review and approval, a written proposal for any significant changes in the scope, design, color, size, material, or texture of the WORK not permitted by or not in substantial conformity with ARTIST's Construction Method and/or Plan.
Mitigation should be required to protect the water environment in the form of a Construction Method Statement.
Item 76 E12.2 b Labour Intensive Construction Method Those parts of the contract to be constructed using Labour Intensive methods will be marked in the BoQ with letter LI (indicating Labour Intensive) against every item so designated.