Construction Ecological Protection and Mitigation Strategy definition

Construction Ecological Protection and Mitigation Strategy means the strategy to be approved pursuant to paragraph 3.1 of Schedule 1;

Examples of Construction Ecological Protection and Mitigation Strategy in a sentence

  • Construction Ecological Protection and Mitigation Strategy 3.1 Not to Implement the Development until the Construction Ecological Protection and Mitigation Strategy has been submitted to and approved by the Councils.

Related to Construction Ecological Protection and Mitigation Strategy

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data;

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Electrical protection barrier means the part providing protection against any direct contact to the high voltage live parts.

  • Waste Framework Directive or “WFD” means Waste Framework Directive 2008/98/EC of the European Parliament and of the Council on waste

  • Clinical nurse specialist means a registered nurse with relevant post-basic qualifications and 12 months’ experience working in the clinical area of his/her specified post-basic qualification, or a minimum of four years’ post-basic registration experience, including three years’ experience in the relevant specialist field and who satisfies the local criteria.

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Department of Health and Human Services means the Department of Health and Human Services

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Collaborative drug therapy management means participation by an authorized pharmacist and a physician in the management of drug therapy pursuant to a written community practice protocol or a written hospital practice protocol.

  • Technology protection measure means a specific technology that blocks or filters Internet access to visual depictions that are:

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Urban Coordinating Council Empowerment Neighborhood means a neighborhood given priority access to State resources through the New Jersey Redevelopment Authority.

  • Cathodic protection tester means a person who can demonstrate an understanding of the principles and measurements of all common types of cathodic protection systems as applied to buried or submerged metal piping and tank systems. At a minimum, such persons must have education and experience in soil resistivity, stray current, structure-to-soil potential, and component electrical isolation measurements of buried metal piping and tank systems.

  • Health and Safety Plan means a documented plan which addresses hazards identified and includes safe work procedures to mitigate, reduce or control the hazards identified;

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Environmental and Social Management Framework or “ESMF” means the framework disclosed in country on September 13, 2010 and at the Association’s Infoshop on September 14, 2010, in form and substance satisfactory to the Association, setting out modalities to be followed in assessing the potential adverse environmental and social impact associated with activities to be implemented under the Project, and the measures to be taken to offset, reduce, or mitigate such adverse impact.

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Procurement Code means §13-1-101, et seq., XXXX 0000, as amended and supplemented from time to time.