Construction and Maintenance Costs definition

Construction and Maintenance Costs which means the estimated costs of design, engineering, construction and installation of BMPs, implementation of non- structural BMPs, and in-stream and riparian restoration in and along Long Creek and within the Long Creek Watershed for implementation of the Long Creek Watershed Management Plan, and the estimated costs of reconstruction, operation, modification, alteration, use, maintenance, repair, replacement and inspection of the same, and the estimated costs of any debt service for amounts borrowed by the District and/or by CCSWCD for design, engineering, construction and installation of the same for implementation of the Plan incurred by it prior to the Effective Date of this Agreement (the “Construction and Maintenance Costs”).

Examples of Construction and Maintenance Costs in a sentence

  • Orchard District & Mountain View Neighborhood Projects 11/3/2014 123 3/6/2015 Task 6b.2 Opinion of Probable Construction and Maintenance Costs 2 2 $250 Task 6b.3 Continued Design and Construction Scoping Plan 1 1 $125 Task 6c.

  • Greenwood Avenue West 4/30/2015 29 5/29/2015 Task 6e.2 Opinion of Probable Construction and Maintenance Costs 2 2 $250 Task 6e.3 Continued Design and Construction Scoping Plan 1 1 $125 Task 6f.

  • Roadway Departure Safety Improvements 8/4/2014 90 11/2/2014 Task 6a.1 Preliminary Design (30%) 4 16 20 3 43 $4,829 Task 6a.2 Opinion of Probable Construction and Maintenance Costs 4 10 14 $1,890 Task 6a.3 Continued Design and Construction Scoping Plan 2 4 6 $820 Task 6b.

  • Up to 20% reduction of the Participating Landowner’s share of the Construction and Maintenance Costs for the Parcel(s) or portion thereof served by the Retrofit upon which the Retrofit is located for Retrofits that provide some temperature protection to Long Creek.

  • Greenwood Avenue East 4/30/2015 29 5/29/2015 Task 6d.2 Opinion of Probable Construction and Maintenance Costs 2 2 $250 Task 6d.3 Continued Design and Construction Scoping Plan 1 1 $125 Task 6e.

  • Other Retrofits could receive a total reduction of anywhere from 0% to 100% of the Participating Landowner’s share of the Construction and Maintenance Costs for the Parcel(s) or portion thereof served by the BMP, depending upon which standards each Retrofit would meet: • Reductions in Impact of Altered Hydrology.

  • Modifications to the Plan and/or any event of Default by one or more Participating Landowners may result in removal of a project from the Plan and/or the decrease of Construction and Maintenance Costs.