Completed Infill Development Project Report definition

Completed Infill Development Project Report means a report submitted to the Strategic Partner which includes the Applicant’s certification of a Completed Infill Development Project which will include, but is not limited to:

Examples of Completed Infill Development Project Report in a sentence

  • Agreement that upon Completion of the Infill Development Project the Grantee or Borrower will submit a Completed Infill Development Project Report.

Related to Completed Infill Development Project Report

  • Project Report means a summary statement of the likely environmental effects of a proposed development referred to in section 58;

  • Development Project means a project for the development of land within a

  • Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.

  • Detailed Project Report or ‘‘DPR’’ means the detailed project report relating to Station Development Project and Redevelopment Project attached hereto;

  • Progress Report means the report similar in form and content to that attached hereto as Appendix III.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Phase II Study means a study in humans of the safety, dose ranging or efficacy of a product, as further defined in 21 C.F.R. § 312.21(b) (or the equivalent thereof outside the United States).

  • Research Project means a discrete scientific endeavor to answer a research question or a set of research questions related to medical marijuana and is required for a medical marijuana research license.

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Development Phase means the period before a vehicle type is type approved.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Redevelopment project means a specific construction project

  • Feasibility Study means a comprehensive study of a deposit in which all geological, engineering, operating, economic and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution to finance the development of the deposit for mineral production;

  • Development Property means a Property currently under development for use as an office or industrial building that has not become a Stabilized Property, or on which the improvements (other than tenant improvements on unoccupied space) related to the development have not been completed, provided that such a Development Property on which all improvements (other than tenant improvements on unoccupied space) related to the development of such Property have been completed for at least twelve (12) months shall cease to constitute a Development Property notwithstanding the fact that such Property has not become a Stabilized Property.

  • Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.

  • Progress Reports The Progress Reports as required by the individual Task Work Orders issued pursuant to this Agreement. Responsible: Responsible or Responsibility means the financial ability, legal capacity, integrity and past performance of Contractor and as such terms have been interpreted relative to public procurements. See NYS Finance Law § 163(1)(c).

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Project Improvements means site improvements and facilities that are:

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Commercial project means any project, including, but not

  • Infill development means new construction on a vacant commercial lot currently held as open space.

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.