Company Interconnection Facilities definition

Company Interconnection Facilities. − The meaning ascribed thereto in the Power Purchase Agreement.
Company Interconnection Facilities. The facilities and equipment to be designed, constructed or installed by or on behalf of the Company on the Company’s side of the Interconnection Point that are described in Schedule 3, including any telemetering equipment, transmission lines and associated equipment, transformers and associated equipment, relay and switching equipment, telecommunications devices, telemetering and data interface for the SCADA System, protective devices and safety equipment.
Company Interconnection Facilities means the structures, facilities, equipment, devices and apparatus owned or leased by, or under contract to, the Company or its Affiliates, including those that are identified as Company Interconnection Facilities or as Joint Use Facilities owned, by the Company in Schedule A, as amended from time to time, which are necessary to interconnect, and to facilitate the interconnection of, the Stations to the Transmission System.

Examples of Company Interconnection Facilities in a sentence

  • All Company Interconnection Facilities shall be the property of the Company.

  • The Company will bill the Customer-Generator monthly and the Customer-Generator will, within 30 days after the billing date, reimburse the Company for any costs incurred in operating, maintaining or testing the Company Interconnection Facilities.

  • The Customer-Generator agrees to pay to the Company: (1) a non-refundable contribution for the Company's investment in the Company Interconnection Facilities described in Exhibit C (Company-Owned Interconnection Facilities), subject to the terms and conditions included in Exhibit C and to pay for other interconnection costs.

  • Where portions of the Company Interconnection Facilities are located on the Customer- Generator’s premises, the Customer-Generator shall provide, at no expense to the Company, a suitable location for and access to all such equipment.

  • The latter is comprised of (i) the total costs of the Company Interconnection Facilities, and (ii) the total engineering costs associated with a) developing the Company Interconnection Facilities and b) reviewing and specifying those portions of the Generating Facility which allow interconnected operations as such are described in Exhibit A, and iii) reviewing the verification testing.

  • The Company Interconnection Facilities, for which the Customer-Generator agrees to pay, include: [Need to specify the interconnection facilities.

  • The Company will purchase, construct, own, operate and maintain all interconnection facilities required to interconnect the Company’s system with the Generating Facility at volts, up to the point of interconnection.The Company Interconnection Facilities, for which the Customer-Generator agrees to pay, include: [Need to specify the interconnection facilities.

  • Progressive capital work to inventory and fixed assets are carried in work in progress accounts within theirrespective statement of financial position classifications with fixed in progress”.

  • Within thirty (30) days of receipt of an invoice, which shall be provided within fourteen (14) days of the final accounting, which shall take place within sixty (60) days of completion of construction of the Company Interconnection Facilities, the Subscriber Organization shall remit to the Company the difference between the Total Estimated Interconnection Cost paid to date and the total actual interconnection cost (Total Actual Interconnection Cost).

  • The Subscriber Organization agrees to pay to the Company a non-refundable contribution for the Company's investment in the Company Interconnection Facilities described in Exhibit C (Company-Owned Interconnection Facilities), subject to the terms and conditions included in Exhibit C and to pay for other interconnection costs.


More Definitions of Company Interconnection Facilities

Company Interconnection Facilities means the structures, facilities, equipment, devices and apparatus owned or leased by, or under contract to, the Company, including those that are identified in Schedule A, as amended from time to time, which are necessary to interconnect, and to facilitate the interconnection of, the Stations to the BGE System.
Company Interconnection Facilities means all equipment and facilities owned, operated and maintained by Company, including any modifications, additions, or upgrades made to such facilities, which, in conjunction with the Generator Interconnection Facilities, are necessary to connect the Facility to the Transmission System, as such are so designated and described in Appendix A. Includes Company’s Company Interconnection Facilities includes Company's Metering Equipment, Protective Equipment, and Joint Use Facilities.
Company Interconnection Facilities means the facilities and equipment to be designed, constructed or installed by or on behalf of the Company on the Company’s side of the Interconnection Points.

Related to Company Interconnection Facilities

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Customer Interconnection Facilities means all facilities and equipment owned and/or controlled, operated and maintained by Interconnection Customer on Interconnection Customer’s side of the Point of Interconnection identified in the appropriate appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions, or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. Transmission Provider: The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Production Facilities (7 9) means "production equipment" and specially designed software therefor integrated into installations for "development" or for one or more phases of "production".

  • Interconnection equipment means a group of components or an integrated system owned and operated by the interconnection customer that connects an electric generator with a local electric power system, as that term is defined in Section 3.1.6.2 of IEEE Standard 1547, or with the electric distribution system. Interconnection equipment is all interface equipment including switchgear, protective devices, inverters or other interface devices. Interconnection equipment may be installed as part of an integrated equipment package that includes a generator or other electric source.

  • Interconnection is As Defined in the Act.

  • generation facility means a facility for generating electricity or providing ancillary services, other than ancillary services provided by a transmitter or distributor through the operation of a transmission or distribution system, and includes any structures, equipment or other things used for that purpose;

  • Production facility means a facility in California at which gasoline or CARBOB is produced. Upon request of a producer, the executive officer may designate, as part of the producer's production facility, a physically separate bulk storage facility which (A) is owned or leased by the producer, and (B) is operated by or at the direction of the producer, and (C) is not used to store or distribute gasoline or CARBOB that is not supplied from the production facility.

  • Transportation Facilities means any physical facility that moves or assist in the movement of people or goods including facilities identified in OAR 660-012-0020 but excluding electricity, sewage, and water systems.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Common Facilities means the facilities under D.G.sets/D.G.rooms, water storage tanks its pumping and supply system, sewerage & drainage systems, electric sub-station/ transformers/electric panels/distribution network, maintenance service rooms, lawns including lighting & services etc., roads, pathways & driveways including street lighting & services etc., guard posts, fire hydrants & fire fighting system etc. and all such facilities and areas for common use and excluded from the computation of Super Area of the Said Premises;

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Air navigation facility means any facility, other than one owned and operated by the United States, used in, available for use in, or designed for use in aid of air navigation, including any structures, mechanisms, lights, beacons, markers, communicating systems, or other instrumentalities or devices used or useful as an aid, or constituting an advantage or convenience to the safe taking off, navigation, and landing of aircraft, or the safe and efficient operation or maintenance of an airport, and any combination of any or all of such facilities.

  • Clean coal SNG facility means a facility that uses a

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region. Generation Interconnection Request:

  • Wastewater facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Interconnection Party means a Transmission Provider, Interconnection Customer, or the Interconnected Transmission Owner. Interconnection Parties shall mean all of them.

  • Pipelines means those pipelines within the Storage Facility that connect the Tanks to one another and to the receiving and delivery flanges of the Storage Facility.

  • Capacity Interconnection Rights means the rights to input generation as a Generation Capacity Resource into the Transmission System at the Point of Interconnection where the generating facilities connect to the Transmission System.

  • Distributed generation facility means a facility owned and operated by a member of the Cooperative for the production of electrical energy that:

  • PJM Interconnection, L.L.C. or "PJM" means the privately-

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer: