Examples of Certificate of Testing in a sentence
Every 1,000 tonnes of bitumen on every consignment must be accompanied by a Certificate of Testing from the supplier.
All the Products shall be stored in Provider’s facilities for [***] after Provider’s issuance of a Certificate of Compliance with 1) a Certificate of Analysis (if full lot release testing is performed by Provider) or 2) a Certificate of Testing (if Client requests only selected lot release testing to be performed by Provider), as applicable, and a monthly storage fee for Products shall be charged after the [***] period.
The dynamic monitoring operator shall have a minimum of two years experience, at least one of which shall have been in data acquisition from high strain dynamic pile testing and successful performance on at least two projects in similar geotechnical conditions, or who has a Certificate of Testing: Basic Level or better on the Foundation QA Examination for Providers of Pile Dynamic Analyzer (PDA) Testing Services.
No lighting, heating, power or other electrical fittings or appliances are to be installed or used without prior consent of the Duty Manager and any electrical equipment brought into the Centre must carry a current Certificate of Testing.
Information to be included on a DOP/PAO Certificate of Testing should contain the following, at a minimum.
A copy of the Certificate of Testing for Stage I & Stage II (Certificate of Installation for Stage II only) Vapour Recovery System as applicable.
Information to be included on a DOP/PAO Certificate Label (that is attached to tested and passed equipment) shall be consistent with information recorded on the Certificate of Testing and should contain the following, at a minimum.
СПЛ _ Recognition Certificate of Testing Laboratory (form 7.1.4.3).СПО _ Recognition Certificate for the Firm Performing Freight Container Inspection (form 7.1.4.5) ССП _ Certificate of Firm Conformity (form 7.1.27).СТО _ Type Approval Certificate (form 6.8.3).
Bidders shall furnish with their bid a Certificate of Testing from Manufacturer for accuracy of registration for each meter.
Electrical contractors will be engaged in accordance with the requirements of the Contractor Management Procedure (PRO-00808).A licenced electrical contractor engaged to perform electrical work at an Seqwater workplace must provide their licence details on the work order for the work being undertaken.On completion of the work, contractors shall provide a Certificate of Testing and Compliance or a Certificate of Testing and Safety.