CAIR NOx ozone season allowance tracking system definition

CAIR NOx ozone season allowance tracking system means the system by which the administrator records allocations, deductions, and transfers of CAIR NOx ozone season allowances under the CAIR NOx ozone season trading program. Such allowances shall be allocated, held, deducted, or transferred only as whole allowances.

Examples of CAIR NOx ozone season allowance tracking system in a sentence

  • CAIR NOx ozone season allowances shall be held in, deducted from, or transferred into or among CAIR NOx ozone season allowance tracking system accounts in accordance with sections 9, 10, and 12 of this rule.

  • Following the establishment of a CAIR NOx ozone season allowance tracking system account, all submissions to the administrator pertaining to the account, including, but not limited to, submissions concerning the deduction or transfer of CAIR NOx ozone season allowances in the account, shall be made only by the CAIR authorized account representative for the account.

  • The CAIR authorized account representative of a general account may submit to the administrator a request to close the account, which shall include a correctly submitted allowance transfer under paragraphs (A) and (B) of rule 3745-109-19 of the Administrative Code for any CAIR NOx ozone season allowances in the account to one or more other CAIR NOx ozone season allowance tracking system accounts.

  • The administrator may, at the administrator's sole discretion and on his or her own motion, correct any error in any CAIR NOx ozone season allowance tracking system account.

  • Characteristic values for hydrogen bonds are compared in Table 4.

  • The CAIR authorized account representative of a general account may submit to the U.S. EPA a request to close the account, which shall include a correctly submitted allowance transfer under section 10(a) through 10(d) of this rule for any CAIR NOx ozone season allowances in the account to one (1) or more other CAIR NOx ozone season allowance tracking system accounts.

  • The U.S. EPA may, at its sole discretion and on its own motion, correct any error in any CAIR NOx ozone season allowance tracking system account.

  • No CAIR permit will be issued, no emissions data reports will be accepted, and no CAIR NOx ozone season allowance tracking system account will be established for a CAIR NOx ozone season unit at a source, until the administrator has received a complete certificate of representation under paragraph (D) of this rule for a CAIR designated representative of the source and the CAIR NOx ozone season units at the source.

  • Ozone Season NOx Allocations for New Units in Tons Per Year Facility IDCounty 567—34.226(455B) CAIR NOx ozone season allowance tracking system.

  • Ozone Season NOx Allocations for New Units in Tons Per YearFacility IDCounty567—34.226(455B) CAIR NOx ozone season allowance tracking system.

Related to CAIR NOx ozone season allowance tracking system

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Vapor balance system means a combination of pipes or hoses which create a closed system between the vapor spaces of an unloading tank and a receiving tank such that vapors displaced from the receiving tank are transferred to the tank being unloaded.

  • Basic generation service transition costs means the amount by

  • Minor source baseline date means the earliest date after the trigger date on which a major stationary source or a major modification subject to 40 CFR 52.21 or to regulations approved pursuant to 40 CFR 51.166 submits a complete application under the relevant regulations. The trigger date is:

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Enrollee point-of-service cost-sharing means amounts paid to

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Basic generation service or "BGS" means electric generation

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Custom Local Area Signaling Service Features (CLASS Features) means certain Common Channel Signaling based features available to End Users, including: Automatic Call Back; Call Trace; Distinctive Ringing/Call Waiting; Selective Call Forward; and Selective Call Rejection.

  • Stationary beam radiation therapy means radiation therapy without displacement of one or more mechanical axes relative to the patient during irradiation.

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Ozone season means the period of time beginning May 1 of a year and ending on September 30 of the same year, inclusive.

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • Channel migration zone (CMZ) means the area where the active channel of a stream is prone to move and this results in a potential near-term loss of riparian function and associated habitat adjacent to the stream, except as modified by a permanent levee or dike. For this purpose, near-term means the time scale required to grow a mature forest. (See board manual section 2 for descriptions and illustrations of CMZs and delineation guidelines.)

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Basic generation service provider or "provider" means a

  • Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.

  • Single tomogram system means a CT x-ray system which obtains x-ray transmission data during a scan to produce a single tomogram.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Generator to Load Distribution Factor or “GLDF” shall mean a generator’s impact on a Flowgate while serving load in that generator’s Balancing Authority Area.