Bundled Resource Units definition

Bundled Resource Units means Resource Units indicated on Exhibit 16.1-1 for which the Baseline Volumes and the County’s actual volumes of consumption are each aggregated for the purposes of determining in which Resource Unit Fee band the individual Resource Units in such bundle are to be charged.
Bundled Resource Units shall have the meaning set forth in Schedule 16.1.

Examples of Bundled Resource Units in a sentence

  • If the County’s actual monthly volume for Bundled Resource Units falls between 90% and 110%, inclusive, of the sum of the Baseline Volumes for such Bundled Resource Units, then the actual monthly volume of each Resource Units in such bundle shall be multiplied by the applicable Resource Units Fee for the 90% to 110% range as set forth in Exhibit 16.1-1, even if the actual monthly volume for a particular Resource Unit falls outside of such range.

  • For comparison we used SVM to classify the same training data set into multiple classes by using the one vs the rest strategy.

  • Except for Bundled Resource Units (which are calculated as described below), the monthly volume of Resource Units actually consumed shall be multiplied by the applicable Resource Unit Fees as set forth in Exhibit 16.1-1 and, if applicable, corresponding to the volume band in which the County’s actual volume of consumption falls during such month.

  • If the County’s actual monthly volume for Bundled Resource Units falls outside the 90% to 110% range described above, then the actual monthly volume of each Resource Unit in such bundle shall be multiplied by the applicable Resource Unit Fee as set forth in Exhibit 16.1-1 corresponding to the volume band in which the County’s actual volume of consumption of such individual Resource Unit falls during such month.

  • If the Client does not accept the amendments referred to in the clause, the Client may act in accordance with the procedure provided for in Clause 10.1 of these Provisions.

Related to Bundled Resource Units

  • Landed Resources means when the Contractor or its Sub-contractor causes foreign nationals to be brought to the United Kingdom, to provide the Services.

  • Batch Load Demand Resource means a Demand Resource that has a cyclical production process such that at most times during the process it is consuming energy, but at consistent regular intervals, ordinarily for periods of less than ten minutes, it reduces its consumption of energy for its production processes to minimal or zero megawatts.

  • Bundle means to collect contributions from more than one source which are then delivered by one person to the Mayor or to his political fundraising committee.

  • Integrated resource plan or "IRP" means the filing made every two years by a utility in accordance with WAC 480-100-238 Integrated resource planning.

  • Nominated Demand Resource Value means the amount of load reduction that a Demand Resource commits to provide either through direct load control, firm service level or guaranteed load drop programs. For existing Demand Resources, the maximum Nominated Demand Resource Value is limited, in accordance with the PJM Manuals, to the value appropriate for the method by which the load reduction would be accomplished, at the time the Base Residual Auction or Incremental Auction is being conducted.

  • Limited Resource Price Decrement means, for the 2017/2018 Delivery Year, a difference between the clearing price for Limited Demand Resources and the clearing price for Extended Summer Demand Resources and Annual Resources, representing the cost to procure additional Extended Summer Demand Resources or Annual Resources out of merit order when the Limited Resource Constraint is binding.

  • Demand Resource means a resource with the capability to provide a reduction in demand.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Service Unit means a standardized measure of consumption, use, generation, or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards for a particular category of capital improvements.

  • Unbundled Loop shall have the meaning set forth in Section 9.2.1.

  • Book-Based System means a system for the central handling of securities or equivalent book-based entries under which all securities of a class or series deposited within the system are treated as fungible and may be transferred or pledged by bookkeeping entry without physical delivery;

  • Basic gas supply service means gas supply service that is

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • Palletized unit load means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.

  • FTPS Unit means Units which are purchased through the Fund/SERV(R) trading system or on a manual basis through FTP Services LLC or for which FTP Services LLC is acting as FTPS Unit Servicing Agent.

  • Bundled Product means Product sold together with any other product(s) or service(s) at a single unit price, whether packaged together or separately, and which other product(s) or service(s) have material independent value from Product itself.

  • Base Capacity Demand Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources and the clearing price for Base Capacity Resources and Capacity Performance Resources, representing the cost to procure additional Base Capacity Resources or Capacity Performance Resources out of merit order when the Base Capacity Demand Resource Constraint is binding.

  • Loop Concentrator/Multiplexer or "LCM" is the Network Element that does one or more of the following: aggregates lower bit rate or bandwidth signals to higher bit rate or bandwidth signals (multiplexing); disaggregates higher bit rate or bandwidth signals to lower bit rate or bandwidth signals (demultiplexing); aggregates a specified number of signals or channels to fewer channels (concentrating); performs signal conversion, including encoding of signals (e.g., analog to digital and digital to analog signal conversion); or in some instances performs electrical to optical (E/O) conversion. LCM includes DLC, and D4 channel banks and may be located in Remote Terminals or Central Offices.

  • Service Switching Point (SSP means the telephone Central Office Switch equipped with a Signaling System 7 (SS7) interface.

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Base Capacity Demand Resource Constraint for the PJM Region or an LDA, shall mean, for the 2018/2019 and 2019/2020 Delivery Years, the maximum Unforced Capacity amount, determined by PJM, of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources that is consistent with the maintenance of reliability. As more fully set forth in the PJM Manuals, PJM calculates the Base Capacity Demand Resource Constraint for the PJM Region or an LDA, by first determining a reference annual loss of load expectation (“LOLE”) assuming no Base Capacity Resources, including no Base Capacity Demand Resources or Base Capacity Energy Efficiency Resources. The calculation for the PJM Region uses a daily distribution of loads under a range of weather scenarios (based on the most recent load forecast and iteratively shifting the load distributions to result in the Installed Reserve Margin established for the Delivery Year in question) and a weekly capacity distribution (based on the cumulative capacity availability distributions developed for the Installed Reserve Margin study for the Delivery Year in question). The calculation for each relevant LDA uses a daily distribution of loads under a range of weather scenarios (based on the most recent load forecast for the Delivery Year in question) and a weekly capacity distribution (based on the cumulative capacity availability distributions developed for the Installed Reserve Margin study for the Delivery Year in question). For the relevant LDA calculation, the weekly capacity distributions are adjusted to reflect the Capacity Emergency Transfer Limit for the Delivery Year in question. For both the PJM Region and LDA analyses, PJM then models the commitment of varying amounts of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources (displacing otherwise committed generation) as interruptible from June 1 through September 30 and unavailable the rest of the Delivery Year in question and calculates the LOLE at each DR and EE level. The Base Capacity Demand Resource Constraint is the combined amount of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources, stated as a percentage of the unrestricted annual peak load, that produces no more than a five percent increase in the LOLE, compared to the reference value. The Base Capacity Demand Resource Constraint shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Registered in the System for Award Management (SAM) database means that—

  • Service Switching Point (SSP) is a telephone central office switch equipped with a Signaling System 7 (SS7) interface.

  • Source-image receptor distance means the distance from the source to the center of the input surface of the image receptor.

  • Capacity Transmission Injection Rights means the rights to schedule energy and capacity deliveries at a Point of Interconnection of a Merchant Transmission Facility with the Transmission System. Capacity Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility and/or Controllable A.C. Merchant Transmission Facilities that connects the Transmission System to another control area. Deliveries scheduled using Capacity Transmission Injection Rights have rights similar to those under Firm Point-to-Point Transmission Service or, if coupled with a generating unit external to the PJM Region that satisfies all applicable criteria specified in the PJM Manuals, similar to Capacity Interconnection Rights.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);