Examples of Building lateral in a sentence
Building lateral seismic and wind loads will be resisted by reinforced concrete shear walls or structural steel bracing located at stair and elevator cores and at exterior walls.
Inspections□ Occur throughout the installation of the water and sanitary.□ Notes:o Building lateral sewer inspections from the test tee to the building: observed by LW; project plumber requests the inspection(s) via the LW website – “Lateral Request Form”o Fire lines: LW only inspects installation and pressure test to the limit of public right of way or property line.
Emphasis is given to improve the foundational understanding of leadership competencies of Team Building, lateral thinking, Influencing Outcomes and Problem Solving.
Building lateral load resisting systems (diaphragms, shear walls, frames) need to be designed for blast loadings.
Building lateral sanitary sewers shall have minimum 3 feet of cover.
Building lateral pipe should be laid in compacted, minimum six-inch bed of ¼ to ½ inch crushed stone, covered six (6) inches above the top.
Building lateral sewers for building connections which are abandoned when a building is demolished, substantially destroyed by fire or the building is destroyed for any other reason, must be sealed with a factory fabricated watertight cap at the property line or at the edge of the sewer easement or at an approved location by the Administrative Head.
Building lateral cleanouts shall be installed at intervals not to exceed one hundred feet (100’) of straight runs.
A cleanout with Sewer relief valve and a backwater preventer shall be installed in the Building lateral between the Building and the public Sewer, and shall be installed on the Owner’s property and at a location in the Building lateral where the Sewage will flow to the public Sewer by gravity.
Building lateral pipelines connecting to the District's sewerage works shall meet the requirements listed below and the criteria listed in Appendix A-5, page 75, and Appendix A-6, page 77.