{"component": "definition", "props": {"groups": [{"snippet": "or \u201cBIM\u201d means a digital representation of physical and functional characteristics of a facility; a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle, which is defined as existing from earliest conception to demolition.", "samples": [{"hash": "grJm8QoVaXs", "uri": "/contracts/grJm8QoVaXs#building-information-model", "label": "Architect/Engineer Agreement", "score": 26.1704311371, "published": true}, {"hash": "6kruyj8NxIE", "uri": "/contracts/6kruyj8NxIE#building-information-model", "label": "Architect/Engineer Agreement", "score": 21.5516777039, "published": true}, {"hash": "7yB0SpKDm3S", "uri": "/contracts/7yB0SpKDm3S#building-information-model", "label": "Construction Management Agreement", "score": 21.4476394653, "published": true}], "size": 8, "snippet_links": [{"key": "characteristics-of", "type": "definition", "offset": [67, 85]}, {"key": "a-facility", "type": "definition", "offset": [86, 96]}, {"key": "for-information", "type": "clause", "offset": [126, 141]}, {"key": "basis-for-decisions", "type": "clause", "offset": [178, 197]}], "hash": "e30237153e1225aaabc0cd50f52a448c", "id": 1}, {"snippet": "means the result of BIM and shall be a shared knowledge resource use to support the Project throughout the design, procurement, construction, testing and commissioning and operational and maintenance phases of the life cycle of the Project.", "samples": [{"hash": "lbLdOup7mE6", "uri": "/contracts/lbLdOup7mE6#building-information-model", "label": "Professional Services Agreement", "score": 20.6502399445, "published": true}, {"hash": "aHVlucoWRiz", "uri": "https://www.ashghal.gov.qa/en/Tenders/TenderBriefDocuments/08%20B%20-%2020%20B.pdf", "label": "Professional Services Agreement", "score": 11.5845308304, "published": false}, {"hash": "jNFX1eKMDW9", "uri": "https://www.ashghal.gov.qa/ar/Tenders/TenderBriefDocuments/GTC-117-14-15%20%20Part%201%20-%20Scope%20of%20Services%20(R4).pdf", "label": "www.ashghal.gov.qa", "score": 6.7460641861, "published": false}], "size": 6, "snippet_links": [{"key": "resource-use", "type": "clause", "offset": [56, 68]}, {"key": "the-project", "type": "clause", "offset": [80, 91]}, {"key": "the-design", "type": "clause", "offset": [103, 113]}, {"key": "testing-and-commissioning", "type": "clause", "offset": [142, 167]}, {"key": "and-maintenance", "type": "clause", "offset": [184, 199]}, {"key": "life-cycle", "type": "clause", "offset": [214, 224]}], "hash": "df34904ac8990ab19a96ca20776702bb", "id": 2}, {"snippet": "(\u201cBIM\u201d) means the computable, digital, multi-dimensional representation of the physical and functional characteristics of the Project\u2019s facilities and their related life-cycle information in Autodesk Revit format and Autodesk Civil 3D, to be used as a repository of design and construction information for use by the Project Team during the design, bidding and construction phases of the Projects, and for TFC\u2019s use throughout the life-cycle of the Project. Members of the Project Team are required to coordinate all efforts with respect to the BIM in accordance with the guidelines set forth in the BIM Execution Plan developed for the Project.", "samples": [{"hash": "iaAfeioRHh4", "uri": "/contracts/iaAfeioRHh4#building-information-model", "label": "Project Controls Professional Agreement", "score": 32.294380188, "published": true}, {"hash": "aduO1c739lj", "uri": "/contracts/aduO1c739lj#building-information-model", "label": "Project Management Professional Agreement", "score": 26.6509246826, "published": true}], "size": 5, "snippet_links": [{"key": "characteristics-of-the", "type": "clause", "offset": [103, 125]}, {"key": "construction-information", "type": "clause", "offset": [277, 301]}, {"key": "the-project-team", "type": "clause", "offset": [313, 329]}, {"key": "during-the-design", "type": "clause", "offset": [330, 347]}, {"key": "construction-phases", "type": "definition", "offset": [361, 380]}, {"key": "the-projects", "type": "clause", "offset": [384, 396]}, {"key": "members-of-the", "type": "clause", "offset": [458, 472]}, {"key": "with-respect-to", "type": "clause", "offset": [525, 540]}, {"key": "in-accordance-with", "type": "definition", "offset": [549, 567]}, {"key": "the-guidelines", "type": "clause", "offset": [568, 582]}, {"key": "bim-execution-plan", "type": "definition", "offset": [600, 618]}], "hash": "177b2b71161185cfeaf8cf3a110cad52", "id": 3}, {"snippet": "\u201cBIM\u201d, or \u201cModel\u201d is a parametric, computable representation of the project design developed by the Architect\u2010Engineer, its consultants, and any Contractor or Subcontractors with BIM responsibilities, and includes construction details developed by the Contractor and its respective consultants and subcontractors that are integrated into the model. As used in this Agreement, references to Building Information Model, BIM, or the Model, include the primary design model or models and all linked, related, affiliated or subsidiary models developed for design, analysis, estimating, detailing, fabrication, construction, operation or maintenance of the project, or any portion or element of the project, whether the model is prepared by the Architect\u2010Engineer or prepared by Contractor\u2019s subcontractors or consultants. Comprehensive Interior Design (CID): CID includes the Structural Interior Design (SID) and the Furniture, Fixtures and Equipment (FF&E) Design. The Structural Interior Design includes building related design elements and components generally part of the building itself, such as walls, ceilings, floor coverings and built in casework. The interior designer\u2019s knowledge and involvement in the project from the programming stage forward affords maximum success in accomplishing the user\u2019s goals and requirements. The interior designer must be involved with the programming and space planning to help achieve the client\u2019s goals for space utilization, and with determining the desired interior finish materials and their respective aesthetic, durability and maintenance qualities or performance characteristics. In addition, the interior designer must provide a furniture footprint based on the project program. The SID shall be performed by a qualified interior designer. The Furniture, Fixtures & Equipment Design is the development of the items and associated fitting and space relationships for the loose interior building materials, equipment, finishes, special effects, and furnishings that result in an integrated and functional design theme. It includes the selection, layout, specification and documentation of pre\u2010 and post\u2010wired work stations, seating, visual display items, office equipment such as copiers and printers, accessories, window treatments, artwork, computers and networking equipment, audiovisual equipment, security cameras and network storage, staff and student desks and file cabinets, storage containers, loose furniture, graphics, wall coverings and hangings, writing boards, entry directories, room signage, break\u2010room and eating space appliances, waste receptacles and other similar items, including contract documentation to facilitate pricing, procurement and installation. FF&E design also includes working with user groups to determine which pieces of FF&E may be reused from the existing spaces so that in the end, the list of FF&E includes all FF&E that will go into the project regardless of the source of the FF&E. FF&E does not include telephone handsets, or instructional or office related loose supplies. The FF&E package is based on the furniture footprint developed in the SID portion of the interior design. Items such as markerboards, bulletin boards and some window treatments may be specified in either the SID or the FF&E.", "samples": [{"hash": "asvB3rOpfWz", "uri": "/contracts/asvB3rOpfWz#building-information-model", "label": "Architectural Services Agreement", "score": 24.2484607697, "published": true}, {"hash": "4A32xcDFZFy", "uri": "/contracts/4A32xcDFZFy#building-information-model", "label": "Architectural Services Agreement", "score": 24.1978092194, "published": true}, {"hash": "87uDI0c0f8O", "uri": "/contracts/87uDI0c0f8O#building-information-model", "label": "Architectural Services Agreement", "score": 24.1088294983, "published": true}], "size": 4, "snippet_links": [{"key": "project-design", "type": "clause", "offset": [68, 82]}, {"key": "construction-details", "type": "clause", "offset": [214, 234]}, {"key": "by-the-contractor", "type": "clause", "offset": [245, 262]}, {"key": "consultants-and-subcontractors", "type": "clause", "offset": [282, 312]}, {"key": "the-model", "type": "clause", "offset": [338, 347]}, {"key": "used-in-this-agreement", "type": "clause", "offset": [352, 374]}, {"key": "references-to", "type": "definition", "offset": [376, 389]}, {"key": "the-primary", "type": "clause", "offset": [445, 456]}, {"key": "design-model", "type": "clause", "offset": [457, 469]}, {"key": "maintenance-of-the-project", "type": "clause", "offset": [632, 658]}, {"key": "prepared-by", "type": "clause", "offset": [723, 734]}, {"key": "by-contractor", "type": "clause", "offset": [770, 783]}, {"key": "fixtures-and-equipment", "type": "definition", "offset": [923, 945]}, {"key": "design-elements", "type": "definition", "offset": [1018, 1033]}, {"key": "the-building", "type": "definition", "offset": [1067, 1079]}, {"key": "floor-coverings", "type": "clause", "offset": [1113, 1128]}, {"key": "interior-designer", "type": "definition", "offset": [1156, 1173]}, {"key": "the-user", "type": "clause", "offset": [1293, 1301]}, {"key": "space-planning", "type": "clause", "offset": [1392, 1406]}, {"key": "the-client", "type": "definition", "offset": [1423, 1433]}, {"key": "space-utilization", "type": "definition", "offset": [1446, 1463]}, {"key": "interior-finish", "type": "clause", "offset": [1498, 1513]}, {"key": "and-maintenance", "type": "clause", "offset": [1567, 1582]}, {"key": "performance-characteristics", "type": "definition", "offset": [1596, 1623]}, {"key": "in-addition", "type": "clause", "offset": [1625, 1636]}, {"key": "provide-a", "type": "definition", "offset": [1665, 1674]}, {"key": "based-on", "type": "definition", "offset": [1695, 1703]}, {"key": "project-program", "type": "clause", "offset": [1708, 1723]}, {"key": "performed-by", "type": "clause", "offset": [1742, 1754]}, {"key": "a-qualified", "type": "clause", "offset": [1755, 1766]}, {"key": "fixtures-equipment", "type": "clause", "offset": [1801, 1821]}, {"key": "the-items", "type": "definition", "offset": [1851, 1860]}, {"key": "building-materials", "type": "definition", "offset": [1931, 1949]}, {"key": "special-effects", "type": "clause", "offset": [1972, 1987]}, {"key": "functional-design", "type": "definition", "offset": [2038, 2055]}, {"key": "and-documentation", "type": "clause", "offset": [2112, 2129]}, {"key": "work-stations", "type": "clause", "offset": [2153, 2166]}, {"key": "display-items", "type": "clause", "offset": [2184, 2197]}, {"key": "office-equipment", "type": "clause", "offset": [2199, 2215]}, {"key": "window-treatments", "type": "clause", "offset": [2259, 2276]}, {"key": "audiovisual-equipment", "type": "clause", "offset": [2323, 2344]}, {"key": "security-cameras", "type": "definition", "offset": [2346, 2362]}, {"key": "file-cabinets", "type": "clause", "offset": [2412, 2425]}, {"key": "storage-containers", "type": "definition", "offset": [2427, 2445]}, {"key": "wall-coverings", "type": "clause", "offset": [2474, 2488]}, {"key": "waste-receptacles", "type": "clause", "offset": [2592, 2609]}, {"key": "similar-items", "type": "definition", "offset": [2620, 2633]}, {"key": "contract-documentation", "type": "definition", "offset": [2645, 2667]}, {"key": "working-with", "type": "definition", "offset": [2747, 2759]}, {"key": "user-groups", "type": "clause", "offset": [2760, 2771]}, {"key": "to-determine", "type": "clause", "offset": [2772, 2784]}, {"key": "list-of-ffe", "type": "clause", "offset": [2869, 2881]}, {"key": "source-of", "type": "definition", "offset": [2948, 2957]}, {"key": "bulletin-boards", "type": "definition", "offset": [3195, 3210]}], "hash": "e9aeb411d40acf9bd3481dbf23cc6dfa", "id": 4}, {"snippet": "(\"BIM\") or \"Model\" is a parametric, computable representation of the Project design developed by the Prime Consultant, its subconsultants, and any Design- Build Subcontractors, and will include construction details developed by the Parties and their respective subconsultants and subcontractors. As used in this Agreement, references to Building Information Model, BIM, or the Model, include the primary design model or models and all linked, related, affiliated or subsidiary models developed for design, estimating, detailing, fabrication, or construction of the Project, or any portion or element of the Project. The portions of the BIM prepared by the Prime Consultant, its subconsultants and the Design-Build Subcontractors, and those portions prepared by General Contractor or Design-Assist Subcontractors under the responsible control of a licensed design professional, are Implementation Documents.", "samples": [{"hash": "cHIjL5IFLh9", "uri": "/contracts/cHIjL5IFLh9#building-information-model", "label": "Integrated Project Delivery Agreement", "score": 29.1902046204, "published": true}, {"hash": "9iUtkNVovXp", "uri": "/contracts/9iUtkNVovXp#building-information-model", "label": "Integrated Project Delivery Agreement", "score": 27.6627521515, "published": true}, {"hash": "5UNwwPqVE8r", "uri": "/contracts/5UNwwPqVE8r#building-information-model", "label": "Integrated Project Delivery Agreement", "score": 25.5379867554, "published": true}], "size": 3, "snippet_links": [{"key": "project-design", "type": "clause", "offset": [69, 83]}, {"key": "prime-consultant", "type": "clause", "offset": [101, 117]}, {"key": "construction-details", "type": "clause", "offset": [194, 214]}, {"key": "by-the-parties", "type": "clause", "offset": [225, 239]}, {"key": "used-in-this-agreement", "type": "clause", "offset": [299, 321]}, {"key": "references-to", "type": "definition", "offset": [323, 336]}, {"key": "the-model", "type": "clause", "offset": [373, 382]}, {"key": "the-primary", "type": "clause", "offset": [392, 403]}, {"key": "design-model", "type": "clause", "offset": [404, 416]}, {"key": "construction-of-the-project", "type": "definition", "offset": [545, 572]}, {"key": "prepared-by", "type": "clause", "offset": [640, 651]}, {"key": "the-design", "type": "clause", "offset": [697, 707]}, {"key": "general-contractor", "type": "definition", "offset": [761, 779]}, {"key": "control-of", "type": "definition", "offset": [834, 844]}, {"key": "licensed-design-professional", "type": "definition", "offset": [847, 875]}, {"key": "implementation-documents", "type": "definition", "offset": [881, 905]}], "hash": "dac52e2ef9e6218e8412ce3e82940a82", "id": 5}, {"snippet": "means a digital representation of the physical and functional characteristics of the Project.", "samples": [{"hash": "bZyVdbavzy3", "uri": "/contracts/bZyVdbavzy3#building-information-model", "label": "Integrated Agreement for Lean Project Delivery", "score": 31.7424468994, "published": true}, {"hash": "7SyOTSEzSDw", "uri": "/contracts/7SyOTSEzSDw#building-information-model", "label": "Integrated Form of Agreement", "score": 31.6565723419, "published": true}], "size": 2, "snippet_links": [{"key": "the-project", "type": "clause", "offset": [81, 92]}], "hash": "81eac3d4d194cd6c1d0c39a88d2e66d5", "id": 6}, {"snippet": "(\u201cBIM\u201d). CMR shall coordinate efforts with the PMP, TFC Project Manager, and the A/E to successfully implement the BIM Execution Plan for the Project. CMR will provide personnel, including a BIM Coordinator, and appropriate services to ensure the proper flow of information is provided to enable appropriate input into and output from the BIM, including, but not limited to, importing information into the BIM, providing updated information on changes to the Project plans and specifications during construction, assisting on conflict resolution, coordinating the sharing of information, facilitating file exchange, and other deliverables as assigned to it in the BIM Execution Plan. TFC may assign additional deliverables to CMR as it concerns the functionality of the BIM such that the complete BIM may be provided to TFC upon completion for TFC's use throughout the life-cycle of the Project.", "samples": [{"hash": "ekGTzn8dpJx", "uri": "/contracts/ekGTzn8dpJx#building-information-model", "label": "Construction Manager at Risk Agreement", "score": 30.4723072052, "published": true}], "size": 1, "snippet_links": [{"key": "tfc-project-manager", "type": "clause", "offset": [52, 71]}, {"key": "bim-execution-plan", "type": "definition", "offset": [115, 133]}, {"key": "will-provide", "type": "clause", "offset": [155, 167]}, {"key": "to-ensure", "type": "clause", "offset": [233, 242]}, {"key": "flow-of-information", "type": "clause", "offset": [254, 273]}, {"key": "not-limited", "type": "clause", "offset": [359, 370]}, {"key": "information-on", "type": "clause", "offset": [429, 443]}, {"key": "project-plans-and-specifications", "type": "definition", "offset": [459, 491]}, {"key": "during-construction", "type": "clause", "offset": [492, 511]}, {"key": "conflict-resolution", "type": "clause", "offset": [526, 545]}, {"key": "sharing-of-information", "type": "clause", "offset": [564, 586]}, {"key": "other-deliverables", "type": "definition", "offset": [620, 638]}, {"key": "additional-deliverables", "type": "definition", "offset": [699, 722]}, {"key": "upon-completion", "type": "clause", "offset": [824, 839]}], "hash": "501e29d432b20f0c052159b39e239392", "id": 7}, {"snippet": "(\"BIM\" or \"Model\") is a parametric, computable representation of the Project design developed by the Design Build Team, and it includes construction details. As used in this Contract, references to Building Information Model or BIM include the primary design model or models and all linked, related, affiliated, or subsidiary models developed for design, detailing, fabrication, or construction of the Project. The portions of the BIM prepared by Design Professionals or a Design Build Subcontractors are Construction Documents. The portions of the BIM prepared by the Design Builder or its Subcontractors (other than Design Build Subcontractors) to illustrate means and methods for constructing, fabricating, or installing portions of the Construction Work are Submittals, which are not Contract Documents or Construction Documents.", "samples": [{"hash": "h5jWtSE2CdT", "uri": "/contracts/h5jWtSE2CdT#building-information-model", "label": "Design Build Agreement", "score": 30.7660999298, "published": true}], "size": 1, "snippet_links": [{"key": "project-design", "type": "clause", "offset": [69, 83]}, {"key": "design-build-team", "type": "clause", "offset": [101, 118]}, {"key": "construction-details", "type": "clause", "offset": [136, 156]}, {"key": "in-this-contract", "type": "clause", "offset": [166, 182]}, {"key": "references-to", "type": "definition", "offset": [184, 197]}, {"key": "the-primary", "type": "clause", "offset": [240, 251]}, {"key": "design-model", "type": "clause", "offset": [252, 264]}, {"key": "construction-of-the-project", "type": "definition", "offset": [382, 409]}, {"key": "prepared-by", "type": "clause", "offset": [435, 446]}, {"key": "design-professionals", "type": "definition", "offset": [447, 467]}, {"key": "construction-documents", "type": "definition", "offset": [505, 527]}, {"key": "means-and-methods", "type": "definition", "offset": [661, 678]}, {"key": "the-construction-work", "type": "definition", "offset": [736, 757]}, {"key": "contract-documents", "type": "definition", "offset": [788, 806]}], "hash": "61f3e002a1921006ef18e57987a2d80b", "id": 8}, {"snippet": "means the three dimensional electronic building information model in respect of all or any part(s) of the Project.\"", "samples": [{"hash": "bZ6gOyOazyz", "uri": "/contracts/bZ6gOyOazyz#building-information-model", "label": "Nec3 Professional Services Contract", "score": 33.0260776786, "published": true}], "size": 1, "snippet_links": [{"key": "in-respect-of", "type": "clause", "offset": [66, 79]}, {"key": "the-project", "type": "clause", "offset": [102, 113]}], "hash": "b067cd340161ec479530eed83bc125d8", "id": 9}, {"snippet": "or \u201cBIM\u201d means a computable, parametric", "samples": [{"hash": "lEIJz5tk0nj", "uri": "https://apps.saws.org/Business_Center/Contractsol/RFQ/4192/PS-00144%20Addendum%201_FINAL%20POSTED.pdf", "label": "apps.saws.org", "score": 9.540725708, "published": false}], "size": 1, "snippet_links": [], "hash": "9a4b2805eeaddc14788ea71ddda45474", "id": 10}], "next_curs": "CmcSYWoVc35sYXdpbnNpZGVyY29udHJhY3RzckMLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIjYnVpbGRpbmctaW5mb3JtYXRpb24tbW9kZWwjMDAwMDAwMGEMogECZW4YACAA", "definition": {"snippet": "or \u201cBIM\u201d means a digital representation of physical and functional characteristics of a facility; a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle, which is defined as existing from earliest conception to demolition.", "title": "Building Information Model", "size": 37, "id": "building-information-model", "examples": ["Creation of a <strong>Building Information Model</strong> is excluded from the definition of Electronic Submittals; if the Owner requests the Designer to create such a Model, the parties shall execute a separate agreement and Designer shall receive Extra Services for its creation.", "At completion of the project\u2019s design phase, the Design <strong>Building Information Model</strong>\u2019s shall be transferred at no additional cost to the Owner and Contractor for its use in preparation of a coordinated Construction <strong>Building Information Model</strong>.", "In addition to the definitions in Clause 1 of the \u2587\u2587\u2587\u2587, the following definitions are applied: \u2018Annual Fee\u2019 means the fee to be paid by You in consideration of the right to develop and supply Applications and/or BIM content for the Trimble Partner Services provided; \u2018BIM Content\u2019 means digital 3D representations of building products and components that can be placed into <strong>Building Information Model</strong> (BIM).", "We will use our <strong>Building Information Model</strong> to export concept visuals for the design massing.", "Creation of a <strong>Building Information Model</strong> is excluded from the definition of Electronic Submittals; if the Town requests the Designer to create such a Model, the parties shall execute a separate agreement and Designer shall receive Extra Services for its creation.", "Where such services may impact the development of the <strong>Building Information Model</strong>, the Architect will collaborate with the CM to insure the BIM reflects the input of the CM.", "The Design Team shall continue development of their <strong>Building Information Model</strong>.", "The required process is defined in the DAS 0420 <strong>Building Information Model</strong> (BIM) Guidelines, available for download from the online DAS/CS Library (\u2587\u2587\u2587\u2587\u2587://\u2587\u2587\u2587\u2587\u2587\u2587.\u2587\u2587.\u2587\u2587\u2587/DASCSLibrary) &gt; 0000 Series Project Manuals and Guidelines.", "The County encourages <strong>Building Information Model</strong> (BIM) based design and documentation to the maximum extent possible, especially for all major projects including all new construction.", "The <strong>Building Information Model</strong> and subsidiary models necessary for design and construction of the Project are the property of the District, and the Architect agrees to provide the District, as a deliverable before Final Completion, the BIM and all related files in its possession."], "related": [["benchmarking-information", "Benchmarking Information", "Benchmarking Information"], ["staffing-information", "Staffing Information", "Staffing Information"], ["pricing-information", "Pricing Information", "Pricing Information"], ["identifying-information", "Identifying information", "Identifying information"], ["appendix-information", "Appendix Information", "Appendix Information"]], "related_snippets": [], "updated": "2025-07-10T05:58:13+00:00"}, "json": true, "cursor": ""}}