LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
Study Centre means a centre established and maintained or recognized by the University for the purpose of advising, counselling or for rendering any other assistance required by the students in the context of distance education;
Cost center means a cost category delineated by cost reporting forms prescribed by the office.
land development area means an erf or the land which is delineated in an application submitted in terms of this By-law or any other legislation governing the change in land use and “land area” has a similar meaning;
Business Centre means each of the places so specified in the relevant Pricing Supplement.
Indigenous Peoples Planning Framework or “IPPF” means the indigenous peoples planning framework for the Investment Program, including any update thereto, agreed between the Borrower and ADB and incorporated by reference in the FFA;
Research and development means (1) theoretical analysis, exploration, or experimentation; or (2) the extension of investigative findings and theories of a scientific or technical nature into practical application for experimental and demonstration purposes, including the experimental production and testing of models, devices, equipment, materials, and processes. Research and development does not include the internal or external administration of radiation or radioactive material to human beings.
Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.
Economic development incentive means a financial incentive,
Budget unit means the unit for which the ANB of a district is calculated separately pursuant to 20-9-311.
Health planning region means a contiguous geographical area of the Commonwealth with a
Land development means the erection of buildings or structures on land, or the change of use of land, including township establishment, the subdivision or consolidation of land or any deviation from the land use or uses permitted in terms of an applicable land use scheme;
Social development company means a company whose primary purpose in Sudan is to provide humanitarian goods or services, including medicine or medical equipment, agricultural supplies or infrastructure, educational opportunities, journalism-related activities, information or information materials, spiritual-related activities, services of a purely clerical or reporting nature, food, clothing, or general consumer goods that are unrelated to oil-related activities, mineral extraction activities, or power production activities.
minibus means any motor vehicle having a seating capacity of not less than seven nor more than
Next Michigan development corporation means that term as defined in section 3 of the next Michigan development act, 2010 PA 275, MCL 125.2953.
Planned development means a real property development other than a community apartment project, a condominium project, or a stock cooperative, having either or both of the following features:
LHSIA means the Local Health System Integration Act, 2006, and the regulations made under it, as it and they may be amended from time to time;
municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;
Drug therapy management means the review of a drug therapy regimen of a patient by one or more pharmacists for the purpose of evaluating and rendering advice to one or more practitioners regarding adjustment of the regimen.
Transit-oriented development means infrastructure improvements that are located within 1/2 mile of a transit station or transit-oriented facility that promotes transit ridership or passenger rail use as determined by the board and approved by the municipality in which it is located.
Cropland means land used for the production of adapted crops for harvest, alone or in a rotation with grasses and legumes, and includes row crops, small grain crops, hay crops, nursery crops, orchard crops, and other similar specialty crops.
Nodal Ministry means the Ministry or Department identified pursuant to this order in respect of a particular item of goods or services or works.