Bridging Document definition

Bridging Document means the document used to align Contractor’s and Company’s “Safe Work” documents, standards, policies, procedures, and practices, which shall be agreed upon between the Parties after execution of the Agreement, but prior to the commencement of any Work at a Site. The form of “Bridging Document” is attached hereto as Attachment A-1.
Bridging Document means a document that allows Chevron to compare Contractor HSE Management Systems with the Chevron OEMS. The Bridging Document addresses gaps and/or conflicts between systems and documents agreement on how those gaps and/or conflicts will be resolved before Work commences.

Examples of Bridging Document in a sentence

  • CONTRACTOR shall submit to ADMINISTRATOR a copy of its Plan of Operation as submitted to the CDSS ▇▇▇▇▇▇ Care Rates Bureau and/or CCLD subsequent to the execution of this Contract.

  • Sustainable Communities Strategy Goals YES NO Reduce Greenhouse Gas Emissions YES NO Other Port Improvements EA 1 Other Border Crossing Improvements EA 1 Additional Information The Project Team is proposing to increase the budget of the existing 0999C to fund the required Bridging Document and associated studies and agreements that are integral to the completion of the Corridor Program.

  • Upon written authorization from the District to proceed with the Bridging Documents Phase, based upon accepted deliverables from the preceding phase, the Bridging Architect shall perform Bridging Document Phase Services for District as follows: Bridging Architect shall assemble the approved Schematic Design Documents including drawings, Performance Standards, outline specifications and Basis of Design into a comprehensive package.

  • Experience with Design Build projects as either the Engineer of Record or as the Criteria or Bridging Document Engineer for either a DSA or non-DSA project Applicants may list projects that may not match the exact criteria listed, however, projects listed are to be representative of the Applicant’s ability to perform Architecture/Engineering services.

  • The Management Agreements shall have been terminated with respect to those Communities that are not subject to an Interim Bridging Document.

  • It is the responsibility of the Talisman and CONTRACTOR'S ABBREV to ensure that this HSE Bridging Document is subject to detailed review and revision upon significant changes in the work program.

  • Notwithstanding anything to the contrary contained in the Existing Agreement (including, without limitation, the Survival Period and the provisions of Section 15.3 thereof), the Parties acknowledge and agree that, within thirty (30) days after each Interim Bridging Document for a Bridged Community is terminated, the Parties shall determine the net operating income (or loss) for such Bridged Community for the period of the term of the applicable Interim Bridging Document.

  • The Parties will agree upon the form of each such Interim Bridging Document on or prior to the expiration of the Due Diligence Period, with appropriate modifications thereafter to accommodate requirements of the specific jurisdictions in which the Communities are located.

  • If required by Applicable Law, the Parties shall submit a copy of any such Interim Bridging Document and timely provide such other required notifications or filings to the appropriate Governmental Authority(ies) to permit Closing to occur as scheduled, and to the extent any notifications or filings to the appropriate Governmental Authority(ies) are required after Closing, the Parties shall timely provide the same..

  • It is understood that Deloitte and the State will use Appendix M and N from the RFP and Proposal Response, as clarified in this Bridging Document, as the baseline requirements for the project (“Requirements Documents”).