Blackhawk-Hazleton 345 kV Project definition

Blackhawk-Hazleton 345 kV Project means the approximately twelve (12) mile double-circuit 345/161 kV line to connect between MidAmerican’s existing Blackhawk Substation and the Points of Interconnection with ITC Midwest. The Blackhawk- Hazleton 345 kV project includes the steel poles, structures and foundations, as well as the 345 kV circuit including insulators, arms and conductors and the fiber optic shield wire located above the 345 kV circuit. The Blackhawk-Hazleton 345 kV Project shall not include the 161 kV circuit including insulators, arms and conductor as well as the shield wire located above the 161 kV circuit.

Examples of Blackhawk-Hazleton 345 kV Project in a sentence

  • III) Resolution finally Adopting and Approving the form of a Joint Ownership Agreement for Blackhawk-Hazleton 345 kV Project Between and Among MidAmerican Energy Company and the Municipal Electric Utility of the City of Cedar Falls, Iowa.

  • After the completion of construction,MidAmerican shall unitize the Blackhawk-Hazleton 345 kV Project expenditures in accordance with the FERC Uniform System of Accounts using its own procedures and property units and shall inform Cedar Falls as to the total of shared costs for each property unit.

  • Cedar Falls shall cooperate with MidAmerican in order to secure Approvals required to construct and operate the Blackhawk-Hazleton 345 kV Project.

  • Such cooperation may include, but will not be limited to, providing oral or written testimony regarding the Parties’ need for the Blackhawk-Hazleton 345 kV Project.

  • During the construction and operation of the Blackhawk-Hazleton 345 kV Project, it is understood that nothing herein shall require or prohibit the carrying of liability insurance by MidAmerican or Cedar Falls.

  • The joint ownership shall be calculated based on the ratio of each Party’s investment in the Blackhawk-Hazleton 345 kV Project to the total investment in the Blackhawk-Hazleton 345 kV Project.

  • In the event of an abandonment or determination of impracticability as set forth in this section, all unpaid expenditures incurred by MidAmerican in connection with the abandonment or retirement of the Blackhawk-Hazleton 345 kV Project (including but not limited to environmental clean-up liability) shall be paid by each Party in proportion with its ownership interest.

  • The cost and ownership of the Blackhawk-Hazleton 345 kV Project will be shared in accordance with the Parties’ respective share of ownership percentages as specified in Section 5.1, and each Party shall own and control a like percentage of the capacity of the Blackhawk-Hazleton 345 kV Project.

  • Cedar Falls shall make monthly payments to MidAmerican as costs are incurred for the planning, construction and interconnection of the Blackhawk-Hazleton 345 kV Project.

  • The costs of operation, maintenance, renewal and replacement of the Blackhawk-Hazleton 345 kV Project shall be allocated among the Parties in proportion to each Party’s joint ownership interest in the Blackhawk-Hazleton 345 kV Project as shown in Section 5.1 and in accordance with the Accounting Memorandum attached hereto as Exhibit A.

Related to Blackhawk-Hazleton 345 kV Project

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • The Works/Project means the works to be executed or done under this contract.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Cannabis processing facility means a person that:

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Phase I Environmental Site Assessment is an assessment of the environmental condition of the Property performed in accordance with the American Society of Testing and Materials (ASTM) Standard E1527-05 “Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process,” or any successor to such ASTM Standard which is active at the time of the assessment.

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Ground water means water below the land surface in a zone of saturation.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • LOCKHEED XXXXXX Procurement Representative means a person authorized by LOCKHEED XXXXXX'x cognizant procurement organization to administer and/or execute this Contract.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Cannabis testing facility means an entity registered by

  • Infrastructure project means any construction or acquisition of treatment works,

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Clean coal SNG facility means a facility that uses a