Examples of As-built drawings, in a sentence
As a requirement for acceptance of Substantial Completion, Construction Manager shall provide two (2) copies of the current As-Built Drawings and Specifications maintained at the job site and provide these copies to the Owner.
These documents shall be labeled “Interim Record Drawings and Specifications” and are required to assist the Owner in the operation of the facility until Final Completion is accomplished and the final As-Built Drawings and Specifications are provided to the Project Architect to prepare the final “Record Drawings” and “Record Specifications”.
As-Built Drawings: As-built drawings reflect field changes and construction modifications to the conformed Bid Documents.
The As-Built Drawings will be created in the same medium (paper, electronic) in which they were originally prepared.
As-Built Drawings, endorsed by the Contractor shall be submitted to the Engineer for agreement in accordance with Clause 5.6 of the GCC.