Amdocs Integration Testing definition

Amdocs Integration Testing means the testing of the integration between the main systems (e.g. Ensemble, Amdocs Charging, OLC).
Amdocs Integration Testing means the testing of the integration between the main systems (e.g. Ensemble, Amdocs Charging,

Examples of Amdocs Integration Testing in a sentence

  • Amdocs will design, develop and execute the Unit Testing, Sub System Testing, Amdocs Integration Testing, and System Testing, of the Customized Product, all components thereof and any other software to be provided hereunder in connection with each Release.

  • Losses and consequential losses caused by computer viruses or resulting from data recognition defect of computer systems are also excluded.

Related to Amdocs Integration Testing

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Cannabis testing facility means an entity registered by

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Monitoring Indicator means a measure of HSP performance that may be monitored against provincial results or provincial targets, but for which no Performance Target is set;

  • Secondary dose monitoring system means a system which will terminate irradiation in the event of failure of the primary dose monitoring system.

  • Contractor Project Manager means the employee identified in a Statement of Work as the Contractor project manager.

  • Primary dose monitoring system means a system which will monitor the useful beam during irradiation and which will terminate irradiation when a preselected number of dose monitor units have been delivered.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • NOC means National Olympic Committee.

  • Fraud Monitoring System means an off-line administration system that monitors suspected occurrences of ABT- related fraud.