Alternative evaporative system purge and pressure test means a method and equipment, as approved by the administrator or the department, which performs evaporative system purge testing and evaporative system pressure testing by pressurizing and testing the evaporative system by means of introducing gases to the system at the fuel filler inlet, and detecting pressure integrity and exhaust gas concentrations, and by testing the integrity of the fuel filler cap.
Alternative evaporative system purge and pressure test means a method and equipment, as approved by the administrator or the department, which performs evaporative system purge testing and evaporative system pressure testing
Alternative evaporative system purge and pressure test means a method and

Related to Alternative evaporative system purge and pressure test

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Evaporative emissions means the hydrocarbon vapours lost from the fuel system of a motor vehicle other than those from exhaust emissions;

  • Categorical pretreatment standard or "categorical standard" means any regulation containing pollutant discharge limits promulgated by the environmental protection agency in accordance with sections 307(b) and (c) of the Act (33 U.S.C. section 1317) that apply to a specific category of users and that appear in 40 CFR chapter I, subchapter N, parts 405 through 471.

  • Cannabis testing facility means an entity registered by

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Dyed diesel fuel means diesel fuel that meets the dyeing and marking requirements of 26 U.S.C.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Meet Point A point, designated by the Parties, at which one Party’s responsibility for service begins and the other Party’s responsibility ends.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Loading Zone means a parking stall which is set aside for use by commercial vehicles if there is a sign referable to that stall marked ‘Loading Zone’;

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • LOCKHEED XXXXXX Procurement Representative means a person authorized by LOCKHEED XXXXXX'x cognizant procurement organization to administer and/or execute this Contract.

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Suction outlet means the opening or fitting through which the water under negative pressure is drawn from the pool or spa.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:

  • CO2 means carbon dioxide.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Reid vapor pressure means the vapor pressure of crude oil or other volatile petroleum products at 100 degrees Fahrenheit as determined by the latest edition of ASTM D6377 (RVPE): Standard Test Method for Determination of Vapor Pressure of Crude Oil.

  • Injection Point means the Electric Interconnection Point.