Aircraft Performance Monitoring definition

Aircraft Performance Monitoring. ’ or ‘‘APM’’ shall mean the A320 series Aircraft Performance Model provided by Airbus to JetBlue on TBD, bearing the reference number TBD, where such TBD information shall be provided by JetBlue when available and prior to the [***].

Examples of Aircraft Performance Monitoring in a sentence

  • The High Speed Performance programs are the In Flight Performance computation program (IFP) which permits computation of Aircraft performance for each flight phase and the Aircraft Performance Monitoring program (APM) which permits analysis of Aircraft cruise performance from data recorded during stabilized flight periods.

  • This creates a small thrust force which then reduces the total drag of the device, further contributing to the reduction of fuel consumption.50In order to keep track of aircraft performance, air carriers should implement Aircraft Performance Monitoring (APM) programmes.

  • Based on the lack of action by the FAA to issue the FSIB, on February 23, 2000, the NTSB classified these recommendations “Closed—Unacceptable Action.” 1.18.3 Airplane Equipment Options 1.18.3.1 Aircraft Performance Monitoring System Since November 2005, new production ATR 42 and ATR 72 airplanes have been equipped with an aircraft performance monitoring (APM) system84 designed to assist flight crews with monitoring airplane performance during operations in icing conditions.

  • The continued airworthiness Program should cover Aircraft Performance Monitoring to assess any degradation in the aircraft performance.

  • Additionally, the aircraft is equipped with an Aircraft Performance Monitoring Function (APM).The APM function is monitoring the aircraft drag to alert the crew when performance degradation is identified in icing conditions or when icing conditions have been encountered during flight.The APM system monitors aircraft in-flight performance in order to enhance flight crew awareness of the risk of severe icing conditions.

  • As the aircraft passed FL137, the Aircraft Performance Monitoring system (APM) displayed the following alert: DEGRADED PERF.

  • Flight data can be used to identify critical maintenance tasks by reporting situations when a structural limit exceedance is suspected, or for preventative measures that ensure the aircraft's continuous airworthiness, supporting maintenance troubleshooting (i.e., Engine Health Monitoring or Aircraft Performance Monitoring).

  • The ball shall be contacted within five seconds after the official’s signal to serve.

  • The system is called the Aircraft Performance Monitoring function (APM), and gained certification in 2005.

  • To find the corresponding input for the Aircraft Performance Monitoring program (APM), the central 20 seconds period of each 100 seconds stability period is used to determine the average value for each parameter.

Related to Aircraft Performance Monitoring

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Key Performance Indicators or “KPIs” means the performance measurements and targets set out in Part 3 of Schedule 1 (Services) of this Framework Agreement;

  • Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.

  • Control Performance Standard or “CPS” shall mean the reliability standard that sets the limits of a Balancing Authority’s Area Control Error over a specified time period.

  • Key Performance Indicator means a measure that captures the performance of a critical variable to expand and improve community-based corrections programs to promote offender success, ensure accountability, enhance public safety, and reduce recidivism.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Performance Metrics means criteria established by the Administrator relating to any of the following, as it may apply to an individual, one or more business units, divisions, or Affiliates, or on a company-wide basis, and in absolute terms, relative to a base period, or relative to the performance of one or more comparable companies, peer groups, or an index covering multiple companies:

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Basket Performance means a decimal number calculated by applying the following formula: X ⎛ Underlyingi,FINAL ⎞⎜⎟BP = ∑⎜ Wi × Underlying ⎟i=1 ⎝i,INITIAL ⎠ where: BP = Basket Performance X = 2 Wi = Weighting of the relevant Underlying Underlying i,FINAL Underlying i,INITIAL= Reference Price of the relevant Underlying with respect to the Valuation Date = Initial Price of the relevant Underlying

  • Beam monitoring system means a system designed and installed in the radiation head to detect and measure the radiation present in the useful beam.

  • Energy savings performance contract means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.

  • Performance Milestone means an act or event specified in section 5.1 and described in section 9 of the EPLA.

  • Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.

  • Targeted case management means services that assist a beneficiary to access needed 2 medical, educational, social, prevocational, vocational, rehabilitative, or other community services. The 3 service activities may include, but are not limited to, communication, coordination and referral;

  • Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).

  • Additional Performance Security means the Bank Guarantee to be submitted by Successful Bidder in accordance with Clause 8.7 of this RFP Document

  • Performance evaluation means evaluation of work and program participation as well as other areas of behavior.

  • State Level Monitoring Cell means the body constituted by the State Government for the control and elimination of ragging in institutions within the jurisdiction of the State, established under a State Law or on the advice of the Central Government, as the case may be.

  • Primary dose monitoring system means a system which will monitor the useful beam during irradiation and which will terminate irradiation when a preselected number of dose monitor units have been delivered.

  • Performance Measure means one or more of the following selected by the Committee to measure Company, Affiliate, and/or business unit performance for a Performance Period, whether in absolute or relative terms (including, without limitation, terms relative to a peer group or index): basic, diluted, or adjusted earnings per share; sales or revenue; earnings before interest, taxes, and other adjustments (in total or on a per share basis); basic or adjusted net income; returns on equity, assets, capital, revenue or similar measure; economic value added; working capital; total shareholder return; and product development, product market share, research, licensing, litigation, human resources, information services, mergers, acquisitions, sales of assets of Affiliates or business units. Each such measure shall be, to the extent applicable, determined in accordance with generally accepted accounting principles as consistently applied by the Company (or such other standard applied by the Committee) and, if so determined by the Committee, and in the case of a Performance Compensation Award, to the extent permitted under Code Section 162(m), adjusted to omit the effects of extraordinary items, gain or loss on the disposal of a business segment, unusual or infrequently occurring events and transactions and cumulative effects of changes in accounting principles. Performance Measures may vary from Performance Period to Performance Period and from Participant to Participant, and may be established on a stand-alone basis, in tandem or in the alternative.

  • Qualifying Performance Criteria means any one or more of the following performance criteria, either individually, alternatively or in any combination, applied to either the Company as a whole or to a business unit, Parent, Subsidiary or business segment, either individually, alternatively or in any combination, and measured either annually or cumulatively over a period of years, on an absolute basis or relative to a pre-established target, to previous years’ results or to a designated comparison group, and on a pre-tax or after-tax basis, in each case as specified by the Committee in the Award: (i) cash flow (including operating cash flow or free cash flow); (ii) earnings (including gross margin, earnings before interest and taxes, earnings before taxes, and net earnings); (iii) earnings per share; (iv) growth in earnings or earnings per share; (v) stock price; (vi) return on equity or average stockholders’ equity; (vii) total stockholder return; (viii) return on capital; (ix) return on assets or net assets; (x) return on investment; (xi) revenue; (xii) income or net income; (xiii) operating income or net operating income; (xiv) operating profit or net operating profit; (xv) operating margin; (xvi) return on operating revenue; (xvii) market share; (xviii) contract awards or backlog; (xix) overhead or other expense reduction; (xx) growth in stockholder value relative to the moving average of the S&P 500 Index or a peer group index; (xxi) credit rating; (xxii) strategic plan development and implementation (including individual performance objectives that relate to achievement of the Company’s or any business unit’s strategic plan); (xxiii) improvement in workforce diversity; (xxiv) expenses; (xxv) economic value added; (xxvi) product quality; (xxvii) number of customers; (xxviii) objective customer indicators; (xxix) customer satisfaction; (xxx) new product invention or innovation; (xxxi) profit after taxes; (xxxii) pre-tax profit; (xxxiii) working capital; (xxxiv) sales; (xxxv) advancement of the Company’s product pipeline; (xxxvi) consummation of strategic transactions; (xxxvii) reduction in cash utilization; and (xxxviii) addition of technologies and products. The Committee may appropriately adjust any evaluation of performance under a Qualifying Performance Criteria to exclude any of the following events that occurs during a performance period: (A) asset write-downs; (B) litigation or claim judgments or settlements; (C) the effect of changes in tax law, accounting principles or other such laws or provisions affecting reported results; (D) accruals for reorganization and restructuring programs; and (E) any gains or losses classified as extraordinary or as discontinued operations in the Company’s financial statements.

  • Secondary dose monitoring system means a system which will terminate irradiation in the event of failure of the primary dose monitoring system.

  • Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.