Agreement in lieu of stormwater management plan definition

Agreement in lieu of stormwater management plan means a contract between the town and the owner or permittee that specifies methods that shall be implemented to comply with the requirements of a VSMP for the construction of a single-family residence; such contract may be executed by the Administrator in lieu of a stormwater management plan.

Related to Agreement in lieu of stormwater management plan

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Stormwater management system means any equipment, plants,

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Project Management Agreement means the agreement dated the 20th February 1985 made between the Trustee and the Manager providing for the Manager to manage and co‑ordinate the development and construction of the Resort and includes, if that agreement is terminated, any other agreement in like and similar terms made with the prior consent of the Minister;

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Forest management plan means a written plan prepared and signed by a qualified forester that prescribes measures to optimize production, utilization, regeneration, and harvest of timber. The forest management plan shall include a schedule and timetables for the various silvicultural practices used on forestlands, which shall be a maximum of 20 years in length. A forest management plan shall include all of the following:

  • Storm Water Pollution Prevention Plan means a document which describes the on- site program activities to utilize BMPs to eliminate or reduce pollutant discharges to the storm water conveyance system to the maximum extent practicable.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Construction Management Agreement means the Construction Management Agreement, dated as of the date of the Common Agreement, between Construction Manager and the Project Company.