{"component": "definition", "props": {"groups": [{"snippet": "means an entity that operates an Affected System or, if the Affected System is under the operational control of an independent system operator or a regional transmission organization, such independent entity.", "size": 186, "snippet_links": [{"key": "affected-system", "type": "definition", "offset": [33, 48]}, {"key": "control-of", "type": "definition", "offset": [101, 111]}, {"key": "independent-system-operator", "type": "definition", "offset": [115, 142]}, {"key": "regional-transmission-organization", "type": "definition", "offset": [148, 182]}, {"key": "independent-entity", "type": "definition", "offset": [189, 207]}], "samples": [{"hash": "aV60lsah9qW", "uri": "/contracts/aV60lsah9qW#affected-system-operator", "label": "Interconnection Service Agreement", "score": 34.6504974365, "published": true}, {"hash": "8OpE7aT2cW1", "uri": "/contracts/8OpE7aT2cW1#affected-system-operator", "label": "Generation Interconnection Procedure", "score": 34.561378479, "published": true}, {"hash": "gY6ip64Awcg", "uri": "/contracts/gY6ip64Awcg#affected-system-operator", "label": "Generation Interconnection Procedure", "score": 34.3843154907, "published": true}], "hash": "a8d046f33c26d84b8a55ede3048aed5f", "id": 1}, {"snippet": "Affected System Operator shall mean the operator of any Affected System. Affected Transmission Owner \u2013The New York public utility or authority (or its designated agent) other than the Connecting Transmission Owner that: (i) owns facilities used for the transmission of Energy in interstate commerce and provides Transmission Service under the Tariff, and (ii) owns, leases or otherwise possesses an interest in a portion of the New York State Transmission System where System Deliverability Upgrades or System Upgrade Facilities are installed pursuant to Attachment Z and Attachment S to the ISO OATT. Applicable Laws and Regulations \u2013 All duly promulgated applicable federal, state and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or administrative orders, permits and other duly authorized actions of any Governmental Authority, including but not limited to Environmental Law. Applicable Reliability Standards \u2013 The criteria, requirements and guidelines of the North American Electric Reliability Council, the Northeast Power Coordinating Council, the New York State Reliability Council and related and successor organizations, or the Transmission District to which the Interconnection Customer\u2019s Small Generating Facility is directly interconnected, as those criteria, requirements and guidelines are amended and modified and in effect from time to time; provided that no Party shall waive its right to challenge the applicability of or validity of any criterion, requirement or guideline as applied to it in the context of Attachment Z to the ISO OATT and this Agreement. For the purposes of this Agreement, this definition of Applicable Reliability Standards shall supersede the definition of Applicable Reliability Standards set out in Attachment X to the ISO OATT.", "size": 156, "snippet_links": [{"key": "the-operator", "type": "clause", "offset": [36, 48]}, {"key": "affected-transmission-owner", "type": "definition", "offset": [73, 100]}, {"key": "public-utility", "type": "definition", "offset": [115, 129]}, {"key": "designated-agent", "type": "definition", "offset": [151, 167]}, {"key": "the-connecting-transmission-owner", "type": "definition", "offset": [180, 213]}, {"key": "the-transmission", "type": "clause", "offset": [249, 265]}, {"key": "energy-in", "type": "definition", "offset": [269, 278]}, {"key": "interstate-commerce", "type": "clause", "offset": [279, 298]}, {"key": "service-under-the-tariff", "type": "clause", "offset": [325, 349]}, {"key": "an-interest", "type": "clause", "offset": [396, 407]}, {"key": "a-portion", "type": "definition", "offset": [411, 420]}, {"key": "new-york-state-transmission-system", "type": "definition", "offset": [428, 462]}, {"key": "system-deliverability-upgrades", "type": "definition", "offset": [469, 499]}, {"key": "system-upgrade-facilities", "type": "clause", "offset": [503, 528]}, {"key": "pursuant-to", "type": "definition", "offset": [543, 554]}, {"key": "attachment-s-to-the-iso-oatt", "type": "clause", "offset": [572, 600]}, {"key": "applicable-laws-and-regulations", "type": "definition", "offset": [602, 633]}, {"key": "state-and-local-laws", "type": "clause", "offset": [677, 697]}, {"key": "authorized-actions", "type": "definition", "offset": [831, 849]}, {"key": "governmental-authority", "type": "definition", "offset": [857, 879]}, {"key": "not-limited", "type": "clause", "offset": [895, 906]}, {"key": "environmental-law", "type": "definition", "offset": [910, 927]}, {"key": "applicable-reliability-standards", "type": "definition", "offset": [929, 961]}, {"key": "the-criteria", "type": "clause", "offset": [964, 976]}, {"key": "requirements-and-guidelines", "type": "clause", "offset": [978, 1005]}, {"key": "north-american-electric-reliability-council", "type": "definition", "offset": [1013, 1056]}, {"key": "the-northeast-power-coordinating-council", "type": "clause", "offset": [1058, 1098]}, {"key": "new-york-state-reliability-council", "type": "definition", "offset": [1104, 1138]}, {"key": "successor-organizations", "type": "clause", "offset": [1155, 1178]}, {"key": "the-interconnection-customer", "type": "clause", "offset": [1218, 1246]}, {"key": "small-generating-facility", "type": "definition", "offset": [1249, 1274]}, {"key": "in-effect", "type": "clause", "offset": [1379, 1388]}, {"key": "from-time-to-time", "type": "clause", "offset": [1389, 1406]}, {"key": "provided-that", "type": "definition", "offset": [1408, 1421]}, {"key": "no-party", "type": "clause", "offset": [1422, 1430]}, {"key": "right-to-challenge", "type": "clause", "offset": [1447, 1465]}, {"key": "applicability-of", "type": "clause", "offset": [1470, 1486]}, {"key": "as-applied", "type": "definition", "offset": [1542, 1552]}, {"key": "the-context", "type": "clause", "offset": [1562, 1573]}, {"key": "for-the-purposes-of-this-agreement", "type": "clause", "offset": [1626, 1660]}, {"key": "the-definition-of", "type": "clause", "offset": [1730, 1747]}, {"key": "set-out", "type": "definition", "offset": [1781, 1788]}], "samples": [{"hash": "3IMGTTD12gH", "uri": "/contracts/3IMGTTD12gH#affected-system-operator", "label": "Standard Small Generator Interconnection Agreement", "score": 36.0391616821, "published": true}, {"hash": "bFcH5W2eh4d", "uri": "/contracts/bFcH5W2eh4d#affected-system-operator", "label": "Standard Small Generator Interconnection Agreement", "score": 36.0282478333, "published": true}, {"hash": "gR1Gmb9s6NP", "uri": "/contracts/gR1Gmb9s6NP#affected-system-operator", "label": "Interconnection Agreement", "score": 35.9992027283, "published": true}], "hash": "a73815e68c7294c32387737662dc7a60", "id": 2}, {"snippet": "means an entity that operates an Affected System or, if the", "size": 26, "snippet_links": [{"key": "affected-system", "type": "definition", "offset": [33, 48]}], "samples": [{"hash": "8gjALVp97d5", "uri": "/contracts/8gjALVp97d5#affected-system-operator", "label": "Interconnection Service Agreement", "score": 27.2929496765, "published": true}, {"hash": "2wGzAyILE0v", "uri": "https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf", "label": "Amendment to Service Agreement", "score": 23.541633606, "published": false}, {"hash": "7cIoJzinN6d", "uri": "https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf", "label": "www.pjm.com", "score": 18.796415329, "published": false}], "hash": "38b4ff11882844560d9ad153e3e285d8", "id": 3}, {"snippet": "or \u201cASO\u201d shall mean the person or entity operating an Affected System.", "size": 20, "snippet_links": [{"key": "person-or-entity", "type": "definition", "offset": [24, 40]}, {"key": "affected-system", "type": "definition", "offset": [54, 69]}], "samples": [{"hash": "5dHHgerQP64", "uri": "https://www.nationalgridus.com/media/pdfs/billing-payments/tariffs/mae/2025/mdpu_1599_dg_interconnection_tariff.pdf", "label": "www.nationalgridus.com", "score": 18.3050060272, "published": false}, {"hash": "Ogup0CyFzw", "uri": "https://www.nationalgridus.com/media/pdfs/billing-payments/tariffs/mae/2025/mdpu_1579_dg_interconnection_tariff.pdf", "label": "www.nationalgridus.com", "score": 18.1936969757, "published": false}, {"hash": "1cU1aJK6TQ4", "uri": "https://www.mass.gov/doc/iirg-march-2025-filing-9/download", "label": "www.mass.gov", "score": 18.1842524217, "published": false}], "hash": "10b49cd6a536e54caef0488dd926fad3", "id": 4}, {"snippet": "Affected System Operator shall mean the operator of any Affected System. Affected Transmission Owner \u2013The New York public utility or authority (or its designated agent) other than the Connecting Transmission Owner that: (i) owns facilities used for the transmission of Energy in interstate commerce and provides Transmission Service under the Tariff, and (ii) owns, leases or otherwise possesses an interest in a portion of the New York State Transmission System where System Deliverability Upgrades or System Upgrade Facilities are installed pursuant to Attachment Z and Attachment S to the ISO OATT. Applicable Laws and Regulations \u2013 All duly promulgated applicable federal, state and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or administrative orders, permits and other duly authorized actions of any Governmental Authority, including but not limited to Environmental Law. Applicable Reliability Standards \u2013 The criteria, requirements and guidelines of the North American Electric Reliability Council, the Northeast Power Coordinating Council, the New York State Reliability Council and related and successor organizations, or the Transmission District to which the Interconnection Customer\u2019s Small Generating Facility is directly interconnected, as those criteria, requirements and guidelines are amended and modified and in effect from time to time; provided that no Party shall waive its right to challenge the applicability of or validity of any criterion, requirement or guideline as applied to it in the context of Attachment Z to the ISO OATT and this Agreement. For the purposes of this Agreement, this definition of Applicable Reliability Standards shall supersede the definition of Applicable Reliability Standards set out in Attachment X to the ISO OATT. Balancing Authority \u2013 An entity that integrates resource plans ahead of time, maintains demand and resource balance within a Balancing Authority Area, and supports interconnection frequency in real time. Balancing Authority Area \u2013 The collection of generation, transmission, and loads within the metered boundaries of the Balancing Authority. The Balancing Authority maintains load- resource balance within this area. Base Case \u2013 The base case power flow, short circuit, and stability data bases used for the Interconnection Studies by NYISO, Connecting Transmission Owner or Interconnection Customer; described in Section 32.2.3 of the Large Facility Interconnection Procedures, and updated consistent with the rules set forth in Section 25.5.5.1 of Attachment S to the OATT at the start of each Interconnection Study under the Small Generator Interconnection Procedures.", "size": 13, "snippet_links": [{"key": "the-operator", "type": "clause", "offset": [36, 48]}, {"key": "affected-transmission-owner", "type": "definition", "offset": [73, 100]}, {"key": "public-utility", "type": "definition", "offset": [115, 129]}, {"key": "designated-agent", "type": "definition", "offset": [151, 167]}, {"key": "the-connecting-transmission-owner", "type": "definition", "offset": [180, 213]}, {"key": "the-transmission", "type": "clause", "offset": [249, 265]}, {"key": "energy-in", "type": "definition", "offset": [269, 278]}, {"key": "interstate-commerce", "type": "clause", "offset": [279, 298]}, {"key": "service-under-the-tariff", "type": "clause", "offset": [325, 349]}, {"key": "an-interest", "type": "clause", "offset": [396, 407]}, {"key": "a-portion", "type": "definition", "offset": [411, 420]}, {"key": "new-york-state-transmission-system", "type": "definition", "offset": [428, 462]}, {"key": "system-deliverability-upgrades", "type": "definition", "offset": [469, 499]}, {"key": "system-upgrade-facilities", "type": "clause", "offset": [503, 528]}, {"key": "pursuant-to", "type": "definition", "offset": [543, 554]}, {"key": "attachment-s-to-the-iso-oatt", "type": "clause", "offset": [572, 600]}, {"key": "applicable-laws-and-regulations", "type": "definition", "offset": [602, 633]}, {"key": "state-and-local-laws", "type": "clause", "offset": [677, 697]}, {"key": "authorized-actions", "type": "definition", "offset": [831, 849]}, {"key": "governmental-authority", "type": "definition", "offset": [857, 879]}, {"key": "not-limited", "type": "clause", "offset": [895, 906]}, {"key": "environmental-law", "type": "definition", "offset": [910, 927]}, {"key": "applicable-reliability-standards", "type": "definition", "offset": [929, 961]}, {"key": "the-criteria", "type": "clause", "offset": [964, 976]}, {"key": "requirements-and-guidelines", "type": "clause", "offset": [978, 1005]}, {"key": "north-american-electric-reliability-council", "type": "definition", "offset": [1013, 1056]}, {"key": "the-northeast-power-coordinating-council", "type": "clause", "offset": [1058, 1098]}, {"key": "new-york-state-reliability-council", "type": "definition", "offset": [1104, 1138]}, {"key": "successor-organizations", "type": "clause", "offset": [1155, 1178]}, {"key": "the-interconnection-customer", "type": "clause", "offset": [1218, 1246]}, {"key": "small-generating-facility", "type": "definition", "offset": [1249, 1274]}, {"key": "in-effect", "type": "clause", "offset": [1379, 1388]}, {"key": "from-time-to-time", "type": "clause", "offset": [1389, 1406]}, {"key": "provided-that", "type": "definition", "offset": [1408, 1421]}, {"key": "no-party", "type": "clause", "offset": [1422, 1430]}, {"key": "right-to-challenge", "type": "clause", "offset": [1447, 1465]}, {"key": "applicability-of", "type": "clause", "offset": [1470, 1486]}, {"key": "as-applied", "type": "definition", "offset": [1542, 1552]}, {"key": "the-context", "type": "clause", "offset": [1562, 1573]}, {"key": "for-the-purposes-of-this-agreement", "type": "clause", "offset": [1626, 1660]}, {"key": "the-definition-of", "type": "clause", "offset": [1730, 1747]}, {"key": "set-out", "type": "definition", "offset": [1781, 1788]}, {"key": "balancing-authority-area", "type": "definition", "offset": [1947, 1971]}, {"key": "boundaries-of-the", "type": "clause", "offset": [2126, 2143]}, {"key": "base-case", "type": "clause", "offset": [2240, 2249]}, {"key": "power-flow", "type": "clause", "offset": [2266, 2276]}, {"key": "short-circuit", "type": "clause", "offset": [2278, 2291]}, {"key": "data-bases", "type": "clause", "offset": [2307, 2317]}, {"key": "the-interconnection-studies", "type": "clause", "offset": [2327, 2354]}, {"key": "large-facility-interconnection-procedures", "type": "definition", "offset": [2459, 2500]}, {"key": "the-rules", "type": "clause", "offset": [2530, 2539]}, {"key": "interconnection-study", "type": "definition", "offset": [2619, 2640]}, {"key": "generator-interconnection-procedures", "type": "definition", "offset": [2657, 2693]}], "samples": [{"hash": "jaICyckBkp5", "uri": "/contracts/jaICyckBkp5#affected-system-operator", "label": "Service Agreement", "score": 35.5790328979, "published": true}, {"hash": "eyqR8D17KPh", "uri": "/contracts/eyqR8D17KPh#affected-system-operator", "label": "Service Agreement", "score": 35.5699653625, "published": true}], "hash": "32ca58042832fd1235021c228b50e9cf", "id": 5}, {"snippet": "means the entity that operates an Affected Systemhave the meaning set forth in the introductory paragraph. Affected Transmission Owner shall mean the New York public utility or authority (or its designated agent) other than the Connecting Transmission Owner that (i) owns facilities used for the transmission of Energy in interstate commerce and provides Transmission Service under the Tariff, and (ii) owns, leases or otherwise possesses an interest in a portion of the New York State Transmission System where System Deliverability Upgrades, System Upgrade Facilities, or Network Upgrade Facilities are or will be installed pursuant to Attachment P, Attachment X, Attachment Z, or Attachment S to the ISO OATT.", "size": 9, "snippet_links": [{"key": "the-entity", "type": "clause", "offset": [6, 16]}, {"key": "introductory-paragraph", "type": "definition", "offset": [83, 105]}, {"key": "affected-transmission-owner", "type": "definition", "offset": [107, 134]}, {"key": "public-utility", "type": "definition", "offset": [159, 173]}, {"key": "designated-agent", "type": "definition", "offset": [195, 211]}, {"key": "the-connecting-transmission-owner", "type": "definition", "offset": [224, 257]}, {"key": "the-transmission", "type": "clause", "offset": [292, 308]}, {"key": "energy-in", "type": "definition", "offset": [312, 321]}, {"key": "interstate-commerce", "type": "clause", "offset": [322, 341]}, {"key": "service-under-the-tariff", "type": "clause", "offset": [368, 392]}, {"key": "an-interest", "type": "clause", "offset": [439, 450]}, {"key": "a-portion", "type": "definition", "offset": [454, 463]}, {"key": "new-york-state-transmission-system", "type": "definition", "offset": [471, 505]}, {"key": "system-deliverability-upgrades", "type": "definition", "offset": [512, 542]}, {"key": "system-upgrade-facilities", "type": "clause", "offset": [544, 569]}, {"key": "network-upgrade-facilities", "type": "clause", "offset": [574, 600]}, {"key": "pursuant-to", "type": "definition", "offset": [626, 637]}, {"key": "attachment-p", "type": "clause", "offset": [638, 650]}, {"key": "attachment-s-to-the-iso-oatt", "type": "clause", "offset": [683, 711]}], "samples": [{"hash": "9Swk4xXpldY", "uri": "/contracts/9Swk4xXpldY#affected-system-operator", "label": "Standard Large Generator Interconnection Service Agreement", "score": 35.2493400574, "published": true}, {"hash": "8dDZfGPCnPa", "uri": "/contracts/8dDZfGPCnPa#affected-system-operator", "label": "Engineering, Procurement, and Construction Agreement", "score": 34.6849060059, "published": true}, {"hash": "6hC3JtKWngC", "uri": "/contracts/6hC3JtKWngC#affected-system-operator", "label": "Engineering, Procurement, and Construction Agreement", "score": 34.3460693359, "published": true}], "hash": "24a94a00f00806f41ef137ba21237c14", "id": 6}, {"snippet": "The entity that operates an Affected System.", "size": 9, "snippet_links": [{"key": "the-entity", "type": "clause", "offset": [0, 10]}, {"key": "affected-system", "type": "definition", "offset": [28, 43]}], "samples": [{"hash": "bQDS2qaf7xG", "uri": "/contracts/bQDS2qaf7xG#affected-system-operator", "label": "Open Access Transmission Tariff (Oatt) Definitions", "score": 33.7005233765, "published": true}, {"hash": "d0uuYFQNCdL", "uri": "/contracts/d0uuYFQNCdL#affected-system-operator", "label": "Transmission Wheeling Agreements", "score": 32.6603240967, "published": true}, {"hash": "c10jBkzqjFM", "uri": "/contracts/c10jBkzqjFM#affected-system-operator", "label": "Transmission Wheeling Agreements", "score": 25.7645454407, "published": true}], "hash": "522d64ce11ab7a5a9df1fb69129acade", "id": 7}, {"snippet": "has the meaning given to such term in the applicable Owner\u2019s OATT.", "size": 3, "snippet_links": [{"key": "the-applicable", "type": "clause", "offset": [38, 52]}], "samples": [{"hash": "leYw2kY28dq", "uri": "/contracts/leYw2kY28dq#affected-system-operator", "label": "Joint Purchase and Sale Agreement (Idacorp Inc)", "score": 21.591375351, "published": true}, {"hash": "jLGMMqtkxCy", "uri": "/contracts/jLGMMqtkxCy#affected-system-operator", "label": "Joint Ownership and Operating Agreement (Idacorp Inc)", "score": 21.591375351, "published": true}, {"hash": "6RYPpZMeWvE", "uri": "/contracts/6RYPpZMeWvE#affected-system-operator", "label": "Joint Ownership and Operating Agreement (Idacorp Inc)", "score": 21.591375351, "published": true}], "hash": "f6a7fe6197b6f1930ba3efa41e4c44d5", "id": 8}, {"snippet": "Affected System Operator shall mean the operator of any Affected System. Applicable Laws and Regulations \u2013 All duly promulgated applicable federal, state and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or administrative orders, permits and other duly authorized actions of any Governmental Authority, including but not limited to Environmental Law.", "size": 2, "snippet_links": [{"key": "the-operator", "type": "clause", "offset": [36, 48]}, {"key": "applicable-laws-and-regulations", "type": "definition", "offset": [73, 104]}, {"key": "state-and-local-laws", "type": "clause", "offset": [148, 168]}, {"key": "authorized-actions", "type": "definition", "offset": [302, 320]}, {"key": "governmental-authority", "type": "definition", "offset": [328, 350]}, {"key": "not-limited", "type": "clause", "offset": [366, 377]}, {"key": "environmental-law", "type": "definition", "offset": [381, 398]}], "samples": [{"hash": "eyVN0EnlNy2", "uri": "/contracts/eyVN0EnlNy2#affected-system-operator", "label": "Standard Small Generator Interconnection Agreement", "score": 29.5186882019, "published": true}, {"hash": "gyzHzy9Awn", "uri": "/contracts/gyzHzy9Awn#affected-system-operator", "label": "Standard Small Generator Interconnection Agreement (Sgia)", "score": 21.0, "published": true}], "hash": "3dda3c819a419878f6eaaee41505422d", "id": 9}, {"snippet": "means any DSO or TSO significantly affected by congestion or voltage issues on the grid of another systems operator, or significantly affected by balancing and local services bids from SPU or SPG connected to another systems, or whose grid may provide solutions to these issues, or whose data on the grid or the grid users are necessary to forecast, detect or solve such issues,", "size": 2, "snippet_links": [{"key": "affected-by", "type": "definition", "offset": [35, 46]}, {"key": "local-services", "type": "clause", "offset": [160, 174]}], "samples": [{"hash": "1hKGVJsoej3", "uri": "https://www.acer.europa.eu/sites/default/files/documents/Official_documents/Public_consultations/PC_2024_E_07/1_NCDR_DSO_ENTITY_ENTSO-E.pdf", "label": "www.acer.europa.eu", "score": 18.9120998383, "published": false}, {"hash": "6Grd447RbTV", "uri": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Network%20codes%20documents/NC%20DR/NCDR_DSO%20ENTITY_ENTSO-E.pdf", "label": "eepublicdownloads.blob.core.windows.net", "score": 12.173169136, "published": false}], "hash": "7cfbb1ff0a535c3a3ca39a28a8d067b6", "id": 10}], "next_curs": "CmUSX2oVc35sYXdpbnNpZGVyY29udHJhY3RzckELEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIhYWZmZWN0ZWQtc3lzdGVtLW9wZXJhdG9yIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"snippet": "means an entity that operates an Affected System or, if the Affected System is under the operational control of an independent system operator or a regional transmission organization, such independent entity.", "size": 425, "title": "Affected System Operator", "id": "affected-system-operator", "examples": ["The agreement shall specify the terms governing payments to be made by the Developer to the <strong>Affected System Operator</strong> as well as the re-payment by the <strong>Affected System Operator</strong>.", "<strong>Affected System Operator</strong> shall mean the entity that operates an Affected System.", "Transmission Provider shall not be responsible for financing or repaying any amounts advanced to any <strong>Affected System Operator</strong> for Affected System Upgrades.", "For the re-payment of amounts advanced to <strong>Affected System Operator</strong> for System Upgrade Facilities or System Deliverability Upgrades, the Developer and <strong>Affected System Operator</strong> shall enter into an agreement that provides for such re-payment, but only if responsibility for the cost of such System Upgrade Facilities or System Deliverability Upgrades is not to be allocated in accordance with Attachment S to the ISO OATT.", "When AECI is the host Transmission Provider AECI will include within the interconnection agreements a requirement that the Interconnection Customer must execute a Facility(ies) Construction Agreement with the <strong>Affected System Operator</strong> as per the applicable agreement timeline requirement in the <strong>Affected System Operator</strong>&#x27;s Tariff.", "It shall be the sole responsibility of, Interconnection Customer to enter into an agreement with any <strong>Affected System Operator</strong> that provides for the financing of any necessary Affected System Upgrades and repayment.", "The <strong>Affected System Operator</strong> will determine if an Affected System Study is required for one or more host Generation Interconnection or Merchant HVDC Transmission Connection Requests.", "MISO and AECI will collect from the Interconnection Customer the costs required by the <strong>Affected System Operator</strong> associated with the performance of any Affected System Impact Study or Affected System network upgrade facility(ies) study and forward collected amounts to the <strong>Affected System Operator</strong>.", "Construction of any Network Upgrades on the Affected System will be subject to the terms of the <strong>Affected System Operator</strong>\u2019s Tariff and the Facility(ies) Construction Agreement, and the agreement among owners of transmission facilities subject to the control of the <strong>Affected System Operator</strong>.", "The agreement shall specify the terms governing payments to be made by the Interconnection Customer to <strong>Affected System operator</strong> as well as the repayment by <strong>Affected System Operator</strong>."], "related": [["multi-system-operator", "multi-system operator", "multi-system operator"], ["system-operator", "System Operator", "System Operator"], ["affected-system", "Affected System", "Affected System"], ["independent-system-operator", "Independent System Operator", "Independent System Operator"], ["distribution-system-operator", "distribution system operator", "distribution system operator"]], "related_snippets": [], "updated": "2025-07-26T06:10:51+00:00"}, "json": true, "cursor": ""}}