Adjusted Replacement Cost of Energy definition

Adjusted Replacement Cost of Energy means the ----------------------------------- Replacement Cost of Energy that will be due from Supplier after True-up in accordance with the provisions of Section 7.5. Example determinations of the Adjusted Replacement Cost of Energy are shown on Exhibit E.

Related to Adjusted Replacement Cost of Energy

  • Full Replacement Cost as used herein shall mean the actual replacement cost of the Leased Property requiring replacement from time to time including an increased cost of construction endorsement, if available, and the cost of debris removal. In the event either party believes that full replacement cost (the then-replacement cost less such exclusions) has increased or decreased at any time during the Lease Term, it shall have the right to have such full replacement cost re-determined.

  • Replacement Costs means the expenditures for obtaining and installing equipment, accessories or appurtenances which are necessary during the useful life of the treatment works to maintain the capacity and performance for which such works were designed and constructed.

  • Project Cost means the costs incurred in connection with the

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Approved Operating Expenses operating expenses incurred by Borrower which (i) are included in the Approved Operating Budget for the current calendar month, (ii) are for real estate taxes, insurance premiums, electric, gas, oil, water, sewer or other utility service to the Property or (iii) have been approved by Lender, such approval not to be unreasonably withheld, conditioned or delayed.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.

  • Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.

  • Contract Cost means the Contract Sum plus Price Variation. This cost shall be included in the letter of acceptance.

  • Independent expenditure means an expenditure by a person:

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Total Project Cost means all the funds to complete the effort proposed by the Applicant, including DOE funds (including direct funding of any FFRDC) plus all other funds that will be committed by the Applicant as Cost Sharing.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Operating Expense means salaries, wages, cost of maintenance and operation, materials, supplies, insurance, and all other items normally included under recognized accounting practices, but does not include allowances for depreciation in the value of physical property.

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Cost of the Project means and embraces the cost of construction; the cost of all

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Building Operating Expenses means the portion of “Operating Expenses,” as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Eligible Project Costs means such portion of the Project costs disbursed and loaned from the OPWC to the Recipient for the sole and express purpose of acquiring, constructing, reconstructing, expanding, improving, engineering and equipping the Project, other direct expenses, and related financing costs thereto.

  • Insurance Cost Increase shall not, however, include any premium increases resulting from the nature of the occupancy of any other lessee of the Building. If the parties insert a dollar amount in Paragraph 1.9, such amount shall be considered the "BASE PREMIUM." If a dollar amount has not been inserted in Paragraph 1.9 and if the Building has been previously occupied during the twelve (12) month period immediately preceding the Commencement Date, the "Base Premium" shall be the annual premium applicable to such twelve (12) month period. If the Building was not fully occupied during such twelve (12) month period, the "Base Premium" shall be the lowest annual premium reasonably obtainable for the Required Insurance as of the Commencement Date, assuming the most nominal use possible of the Building. In no event, however, shall Lessee be responsible for any portion of the premium cost attributable to liability insurance coverage in excess of $1,000,000 procured under Paragraph 8.2(b).

  • Total Development Cost means the total of all costs incurred in the completion of a Development, all of which shall be subject to the review and approval by the Credit Underwriter and the Corporation pursuant to this rule chapter, and as further described in Rule 67-48.0075, F.A.C.