Acceptance Test Plan(s definition

Acceptance Test Plan(s means the written requirements used to ascertain that the Vendor’s Products and Services meet the standards which shall be set forth in Exhibit A-1.
Acceptance Test Plan(s means the plans for the conduct of Acceptance Tests prepared by the Parties in accordance with Schedule 10 (Acceptance), as appropriate;
Acceptance Test Plan(s means the written requirements used to ascertain that the Contractor’s Products and Services meet the standards which shall be set forth in Schedule A-1.

Examples of Acceptance Test Plan(s in a sentence

  • Any required Acceptance Test Plans and Procedures shall be negotiated by the Ordering Activity at task order level.

  • RESPONSIBILITIES OF THE CONTRACTORThe Contractor shall comply with all laws, ordinances, and regulations (Federal, State, City, or otherwise) covering work of this character.a. Acceptance TestingAny required Acceptance Test Plans and Procedures shall be negotiated by the Ordering Activity at task order level.

  • In this regard, as Lapavitsas (2012) explains, the in- troduction of the euro and the parities at which each of the member countries joined the Eurozone, as well as the di erential wage policies implemented by each of the members states, have been playing a major role in the determination of macroeconomic imbalances within the Eurozone which would eventually arise under the form of current account and budget de cits in the periphery and surpluses in the core.

  • Acceptance TestingAny required Acceptance Test Plans and Procedures shall be negotiated by the Ordering Activity at task order level.

  • All repaired items, or items identified as NEOF, shall successfully pass acceptance testing in accordance with appropriate LRU and SRU Acceptance Test Plans for the item prior to return.

  • Development, Qualification, and Acceptance Test Plans (drafts) provided at PDR provide early insight into the potential need for factory and launch site test operations, but the actual system design details drive the final answer.

  • With respect to testing and analysis of technical solutions, Tridea Works researches manufacturer-specific technical solutions and prepares Acceptance Test Plans, executes test plans through either on-site or remote testing, collects and analyzes test data, and identifies issues that have the potential to impact the government.

  • The Contractor, as required, shall deliver Lot Acceptance Test Plans for the items listed in para 3.1 IAW the requirements listed in Table 1 (CDRL A003).

  • Requests may include Acceptance Test Plans (ATP) and Test Reports.

  • The plan shall include the following:• Field Test Plan• Field Test Reports• Functional Acceptance Test Plans for all major components• Functional Acceptance Test reports and commentary• Process Narrative• Operational Readiness Test Plan• Operational Readiness Test Report(s)• Revised Control Narrative RAFTConsultant shall provide on-site support during startup and commissioning and shall summarize the issues that emerged and their resolution in a Commissioning Memorandum/Report.

Related to Acceptance Test Plan(s

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Test Plan means a plan: for the Testing of the Deliverables; and setting out other agreed criteria related to the achievement of Milestones, as described further in paragraph 4 of Call of Schedule 5 (Testing);

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Contract Specifications means the principal trading terms in CFD (for example Spread, Swaps, Lot Size, Initial Margin, Necessary Margin, Hedged Margin, the minimum level for placing Stop Loss, Take Profit and Limit Orders, financing charges, charges etc) for each type of CFD as determined by the Company from time to time.

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Design-build team means an entity that consists of: