A Block Project Site definition

A Block Project Site means the real property particularly described in Exhibit B to the Bond Advance Agreement dated December [ ], 2016 by and among the A Block Trustee and the purchasers of the A Block Project Bonds.

Related to A Block Project Site

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Redevelopment project means a specific construction project

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • New Project means (a) each facility or operating location which is either a new facility, location or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, location or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Project Property means the real property on or for which preconstruction service or construction work is or will be provided.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Mixed-use project means a project comprising both a qualified

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Easement Area means the area of the servient lot marked on the survey-strata plan as being subject to the relevant easement; and

  • Project area plan means a written plan that, after the plan's effective date, guides and controls the development within a project area.