Real-Time Shelter Signs Agreement Sample Contracts

Real-Time Shelter Signs Agreement 1804
Real-Time Shelter Signs Agreement • November 3rd, 2016

Q # Question Answer 1 Can you provide concept drawings of bus shelter LED/LCD systemdisplays ( Single-sided & double-sided )? A preliminary draft design will be posted on the contract advertisement sitehere: http://bids.delaware.gov/bids_detail.asp?i=4103&DOT=N 2 Does Federal Funding program mean the outdoor transit display should meet FTA (Federal Transit Administration) Made-In-USA compliance? Yes. In accordance with 23 U.S.C, 313 and 23 CFR 635.410, all iron and steel materials permanently incorporated into this project will be produced in the United States and that all manufacturing processes involving these materials will occur in the U.S, except that a minimal amount of foreign steel or iron materials may be used, provided the cost of the foreign materials does not exceed 0.1 percent of the total Contract cost or $2,500.00, whichever is greater. If such minimal amount of foreign steel is used, the Contractor shall maintain a record of the costs to ensure that the allowable