Xxxxxx Substation. The new communications equipment will be housed in the existing building and the new antenna mounted on the existing tower. The scope of work will include the following: Grounding: The grounding of the existing substation shall be inspected for adequacy, expanded to cover new installations, and the existing Control Building upgraded accordingly for a high frequency grounding system to safeguard electronic and telecommunication equipment from transient overvoltage as recommended by IEEE 1100 and Motorola grounding and Bonding Manual, R56.
AutoNDA by SimpleDocs
Xxxxxx Substation. The Xxxxxx Substation WP-1 and WP-2 tap configurations will be each be converted to breaker and a half configuration. The conversion will require the addition of three circuit breakers, modifications to the existing structures, station connections, line terminations, and protection system. The existing 230kV 2100 bay will be modified by the addition of a third breaker to create separate terminals for the MW-2 and WRY-2 segments of the existing MWP-2 transmission line. PT’s and CVT’s will be added in conjunction with the line relaying modifications. A new 2300 bay will be added north of the existing 2200 bay in an area previously designated by Transmission Owner for expansion. The new 2300 bay will include two new 230kV circuit breakers, SF6 type, 2000A continuous circuit, rated 900kV, 63 kA circuit breakers, associated disconnect switches, and line terminal equipment to accommodate the relocated WP-1 transmission line. The WP-1 transmission line will be re-designated WPN-1. New PT’s and CCVT’s will be added in conjunction with the new line and relaying systems will be installed for the WPN-1 line. The MW-1 line will terminate in the 2200 bay. The existing MWP-1 line primary protection is a blocking carrier scheme using electromechanical relays with ON-OFF carrier equipment. The existing MWP-1 line secondary protection utilizes electromechanical relays to provide backup distance protection. New CCVT’s will be added in the 2200 bay. The existing Direct Transfer Trip is accomplished via audio tone equipment over single side band power line carrier channels. The existing primary and secondary MWP-1 line protection will remain and be re-designated as MW-1 line protection. The new equipment will include: - 230kV Circuit Breakers - 230kV Disconnect Switches - Potential Transformers - Capacitive Voltage Transformers - Primary Protection Panels - Secondary Protection Panels - Communication Racks - Termination Panels - Wave Traps and Line Tuners WRY-2 Line The primary line relaying will include: - Pilot Scheme; directional comparison unblocking (DCU) and primary direct transfer trip (DTTP) over power line carrier - New numerical multifunction relay for phase and ground fault protection - New FSK PLC equipment for DCU - Reconfigure existing FSK PLC equipment for DTTP - New hybrids - Additional auxiliary devices, test switches, lockout relays, etc. The secondary line relaying will include: - Pilot Scheme; current differential with secondary DTT (DTTS) over digital mic...
Xxxxxx Substation. Engineering / Procurement Completed Dev. 2 Apr 2007A Dev. Mobilizes and Starts Dev. 5 Nov 2007A Dev. completes WP-2 installation Dev. 21 Nov 2007A Dev. deliver Trn Ovr Package for WP-2 Dev. 19 Nov 2007A TO Review of Trn Ovr Package TO 19 Nov 2007A 28 Nov 2007A Line outage WP-2 NYPA H Connections 28 Nov 2007A 30 Nov 2007A Ready for Xxxx (PLC communications only) TO 26 Jan 2008 Xxxx Substation Engineering & Procurement Completed Dev. 5 July 2007A Installation Start Dev. 1 May 2007A Dev. Installation Complete Dev. 23 Jan 2008 Fly Tap Outage Ph 1 29 Nov 2007A 30 Nov 2007A Dev deliver final Trn Ovr Package Dev. 22 Feb 2008 TO review of Trn Ovr Package (delivered in progress) TO 22 Feb 2008 7 Mar 2008 TO Concurrent activities (post-Dev. delivery of Trn Ovr Package) RTU configurations TO 15 Dec 2007A 12 Jan 2008A Metering Testing TO 16 Jan 2008 19 Feb 2008 Operations and P+C Final Walk Through TO 4 Feb 2008 22 Feb 2008 Xxxx Microwave Communications Engineering Completed Dev. 27 Aug 2007A Dev. completes MW installation Dev. 15 Jan 2008A Dev. deliver Trn Ovr Package for MW Dev. 13 Feb 2008 TO Review of Trn Ovr Package TO 14 Feb 2008 27 Feb 2008 Ready for Xxxx Tap–Xxxx XX Communications 22 Feb 2008 Xxxxxx Microwave Link (to Xxxx) Engineering Completed Dev. 14 Sep 2007A Contractor Mobilizes on Site Dev. 27 Dec 2007A Dev. Trn Ovr Package delivered to TO Dev. 12 Feb 2008 TO Review of Trn Ovr Package TO 13 Feb 2008 26 Feb 2008 Burn in Dev. 4 Jan 2008 9 Jan 2008A New circuit terminations (final plug-ins only) TO 19 Feb 2008A W MW ready 26 Feb 2008 Massena Microwave Link (to Moses) Engineering Spec. by TO TO 10 Jun 2007A 23 Jun 2007A Installation Dev. 3 Jan 2008 8 Jan 2008A Dev. Trn Ovr Package delivered to TO Dev. 8 Feb 2008 TO review of Trn Ovr Package TO 9 Feb 2008 22 Feb 2008 Conduct TO Approved Acceptance Testing Dev. 26 Feb 2008 Burn in Dev. 22 Jan 2008 27 Jan 2008A MS-MW ready 26 Feb 2008 Moses Microwave Link (to Massena) Engineering Spec. by TO TO 10 Jun 2007A 23 Jun 2007A Installation Dev. 4 Jan 2008 8 Jan 2008A Dev. Trn Ovr Package delivered to TO Dev. 11 Feb 2008 TO review of Trn Ovr Package TO 12 Feb 2008 25 Feb 2008 Conduct TO Approved Acceptance Testing Dev. 26 Feb 2008 Burn in Dev. 21 Jan 2008 27 Jan 2008A M MW ready 26 Feb 2008 Microwave Communications – Backbone: M/MS/W/Xxxx (Summary item) Acceptance testing M/MS/W/RY TO/Dev. 25 Jan 2008 26 Feb 2008 Termination communication circuits (final plug-ins) M/MS/W TO 19 Feb 2008A MW backbone ready (M/MS/W/RY) fo...
Xxxxxx Substation. The Xxxxxx Substation currently bisects the existing Greenbush-Xxxxxx Line 15 and Hudson-Pleasant Valley (Central Xxxxxx) Line 12 on the west side of the north-south right of way. With the removal of the entire north-south lines on the west side of the right of way (i.e., existing Lines 12 and 15), the Xxxxxx Substation will have to be tied to the new Xxxxxx-Falls Park Line 15 and the new Xxxxxx-Churchtown (Transmission Developer) Line 12. This will require modifications to protection and telecom at the Xxxxxx Substation.
Xxxxxx Substation. The new communications equipment will be housed in the existing building and the new antenna mounted on the existing tower. The scope of work will include the following:
Xxxxxx Substation. The Participating TO Shall:
Xxxxxx Substation. Install one (1) pair of GE N60 logic processing relays or equivalent successor, two (2) ethernet switches, and one (1) satellite clock for monitoring of affected lines.
AutoNDA by SimpleDocs
Xxxxxx Substation. All modifications shall be completed in the Xxxxxx Substation yard and control house. (It is assumed that all existing wiring trays and panels have sufficient capacity to accommodate the changes.)
Xxxxxx Substation. A tract of land 25 x 50 feet located in the X.X. Xxxxxxxxx Pre-emption Survey No, 185 in El Paso County, Texas, and being more particularly described as follows to wit: From a point at the intersection of the northeasterly line of U.S. Highway 80 and the South line of the X.X. Xxxxxxxxx Survey No. 185; thence, along said Highway, North 18° 19’ West, 309.0 feet; thence, North 71° 41’ East, 307.0 feet to the point of beginning; thence South 18° 19’ East, 25.0 feet; thence North 71° 41’ East, 50.0 feet to the southwesterly line of Johannson Road; thence along the southwesterly line of Johannson Road, North 18° 19 West, 25.0 feet; thence South 71° 41’ West, 50.0 feet to the place of beginning and containing 1250 square feet of land, also known as Tract 8, Subject to any and all conditions, and utility easements, highways, rights-of-way and other reservations and restrictions and limitations of record affecting said real estate. Conveyed to the El Paso Electric Company by Warranty Deed from Xxxxx Xxxxxxx and husband Xxxxx X. Xxxxxxx, dated February 4, 1972, recorded in Book 375, pages 0442 and 0443, Instrument No. 84981, Deed Records of El Paso County, Texas.
Xxxxxx Substation. 1. Install one (1) dead-end structure.