Works Information. The scope of work / specification for the provision of Live Work Services on the MV network (11kV to 33kV) and associated projects in the Limpopo Operating Unit was compiled by Xxxxxx Ramohlale –Live Work Manager and signed off by Xxxxx Mukwevho – Acting Specialized Maintenance Support Manager and is not limited to the following: Description of the works The scope of work covered by this contract includes:  Installation and replacement of surge arrestors  Replacement of poles  Installation and replacement of cross arms  Replacement of insulators  Conversion of configurations  Installation of bird flappers/fault locators/alarms  Installations/replacement of stay insulators  Installation/maintenance of isolators  Closing spans  Repair jumpers and conductors  Stringing conductors  Line cross over  Replacement of full/non tension sleeve/splice  Conversion of structure  Installing nets for line crossings
AutoNDA by SimpleDocs
Works Information. On the 26th Kendal Power Station ash spreader caught fire on the head station at the spreader stream or 00ETK14. This fire has resulted to the loss of redundancy on the ash removal. This document outlines the conveyor belt spillage equipment scope work to be executed in order to restore the ash spreader machine and the associated conveyor belts.
Works Information. The work information is for the construction of all relevant New Weighbridge infrastructures for Xxxxx Power Station. The work information is for the following activities:  Manufacturing and installation of 3 x 24 m long 80-ton decks including calibration and concrete infill in the decks.  Removal of the 2 x temporary weighbridges and 1 deck that is in storage on site.  Installation of operating system including automation telemetry system for the main weighbridge area.
Works Information. The Tenant must ensure that the Landlord is notified of the commencement and practical completion of the Works and promptly responds to any request to provide information, documents, or other materials in relation to the Works required by the Landlord.
Works Information. General Without limiting clauses 8.13 and 9.14, the Contractor must: do all things necessary to assist the Commonwealth, the Host Nation and Other Contractors to occupy, use, operate and maintain the Works or a Stage; provide all Works Information required for the occupation, use, operation and maintenance of the Works or a Stage to the Contract Administrator in accordance with Annexure 2; and within 28 days (or such longer period agreed in writing by the Contract Administrator) after the issue of a Notice of Completion for the Works or a Stage, give the Contract Administrator final versions of all documents and other information in respect of which drafts were provided in accordance with clause 1 of Annexure 2 (in the same number and format specified in Annexure 2 as applying to the draft versions). Subcontractor review of Works Information The Contractor must: ensure that all relevant subcontractors (including all design subcontractors) have reviewed the Works Information prior to submission to the Contract Administrator; and at the time of submitting Works Information, submit a comprehensive list of all prior reviews carried out by subcontractors of that Works Information in accordance with paragraph (a). Contract Administrator may Review Works Information The Contract Administrator may: review any Works Information, or any resubmitted Works Information, prepared and submitted by the Contractor; and within 7 days of the submission by the Contractor of such Works Information or resubmitted Works Information, reject the Works Information if in the Contract Administrator's reasonable opinion the Works Information does not comply with the requirements of the Contract. If any Works Information is rejected, the Contractor must submit amended Works Information to the Contract Administrator, in which case clause 25.3(a) will reapply.
Works Information. Employer’s requirements for the service REMOVAL AND BREAKING DOWN OF FOUR ASBESTOS HOUSING UNITS (4 OFF HOUSES AND ALL OUTSIDE BUILDINGS) – JAGERSRUST PREAMBLE TO THE AGREEMENT This scope includes maintenance terminology, through the medium of the specification detail -, which gives the reader a plain and concise interpretation of the services quoted for.
Works Information. Scope of Work (Insert scope of work as per the design document) List of drawings Drawings issued by the Employer This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this project. Note: Some drawings may contain both Works Information and Site Information. Drawing number Revision Title PART C4
AutoNDA by SimpleDocs
Works Information. The project is mainly to supply and install the Fibre glass Distribution Boards and Cable trays at King Shaka International Airport
Works Information. 1. Description of the worksConstruction of an oil bund at BBV The work includes the following:
Works Information. This Works Information, hereinafter referred to as the works, is for refurbishment of the pre-treatment section of the Water Treatment Plant (WTP). This entails the major refurbishment of four pre- treatment plant lamella pulsator clarifiers (currently serviceable), the reinstatement of the four clarifier vacuum blower systems (currently non-functional) and the reinstatement of the polyelectrolyte dosing system (currently non-functional) at Majuba Power Station. In addition, the works include additional refurbishments of the coagulant dosing system, brine and alkaline brine dosing system, caustic soda dosing system, chlorine dosing system as well as replacement of control instrumentation, where stated and designing of a motorised sluice-gate system (currently manually operated) and direct-drive vacuum blowers (currently belt-driven) and an electrically operated crane (currently manual chain- block) to meet the Employer’s specifications. Subject to plant inspections and agreement by both parties, all components and equipment in need of replacement is supplied by the Contractor. The Contractor provides adequate and competent management, supervision and technical expertise to replace and/or install the new components to the standards required. The Contractor performs plant and system commissioning with assistance from the Employer’s personnel. The Contractor also disposes of all removed, scrapped plant components and removes waste from site to the allocated skips or areas within site. The purpose of the works is to reinstate Majuba Power Station’s pre-treatment plant to its original design condition in order to improve the plant performance, water quality and increase production capability.