Working Drawings. The Design-Builder shall furnish Working Drawings and maintain a set for the Department as may be required. Working drawings shall not incorporate any changes from the requirements of the Contract unless the changes are specifically denoted, together with justification, and are approved in writing by the Department. The Design-Builder shall identify Working Drawings and submittals by the complete state project and job designation numbers. Items or component materials shall be identified by the specific Contract Item number and Specification reference in the Contract. A PE shall certify Working Drawings for Falsework supporting a Bridge superstructure. The Design-Builder shall provide four (4) sets of any submittal. If a railroad, municipality, or other entity as specified in the Contract Documents is required to review the Working Drawings, the reviewed Working Drawings will be returned within forty five (45) days from the date of receipt by the Department. If the Working Drawings are not returned by the time specified, no additional compensation will be allowed, but Design-Builder may submit, in accordance with the applicable requirements of the Contract Documents, a request for a time extension. Upon completion of the work, the original tracings, if required, shall be supplied to the Department. Deviations from the Contract requirements initiated by the Design-Builder shall be requested in writing and clearly identified on the Working Drawings. Explicit supporting justification shall be furnished specifically describing the reason for the requested deviations as well as any impact such deviations shall have on the schedule of Work. Failure to address time or other impacts associated with the Design-Builder’s request will be cause for rejection of the Design-Builder’s request. Deviations from the Contract requirements shall not be made unless authorized by the Engineer. If authorized by the Engineer, such authorization shall not relieve the Design-Builder from the responsibility for complying with the requirements of the Contract for a fully functional finished work item as specified or designed. The Design-Builder shall submit as-built working drawings upon completion of the Work, if required, by the Contract. The Design-Builder may authorize the fabricator in writing to act for him in matters relating to Working Drawings. Such authorization shall have the force and effect of any other representative of the Design-Builder’s organization.

Appears in 2 contracts

Samples: Agreement, Agreement

AutoNDA by SimpleDocs

Working Drawings. The Design-Builder shall furnish Working Drawings and maintain a set for the Department as may be required. Working drawings shall not incorporate any changes from the requirements of the Contract unless the changes are specifically denoted, together with justification, and are approved in writing by the Department. The Design-Builder shall identify Working Drawings and submittals by the complete state project and job designation numbers. Items or component materials shall be identified by the specific Contract Item number and Specification reference in the Contract. A PE shall certify Working Drawings for Falsework supporting a Bridge superstructure. The Design-Builder shall provide four (4) sets of any submittal. If a railroad, municipality, or other entity as specified in the Contract Documents is required to review the Working Drawings, the reviewed Working Drawings will be returned within forty five (45) 45 days from the date of receipt by the Department. If the Working Drawings are not returned by the time specified, no additional compensation will be allowed, but Design-Builder may submit, in accordance with the applicable requirements of the Contract Documents, a request for a time extension. Upon completion of the work, the original tracings, if required, shall be supplied to the Department. Deviations from the Contract requirements initiated by the Design-Builder shall be requested in writing and clearly identified on the Working Drawings. Explicit supporting justification shall be furnished specifically describing the reason for the requested deviations as well as any impact such deviations shall have on the schedule of Work. Failure to address time or other impacts associated with the Design-Builder’s request will be cause for rejection of the Design-Builder’s request. Deviations from the Contract requirements shall not be made unless authorized by the Engineer. If authorized by the Engineer, such authorization shall not relieve the Design-Builder from the responsibility for complying with the requirements of the Contract for a fully functional finished work item as specified or designed. The Design-Builder shall submit as-built working drawings upon Upon completion of the Workrequested work, Working Drawings indicating the actual as-constructed field conditions, if required, by shall be supplied to the ContractDepartment. The Design-Builder may authorize the fabricator in writing to act for him in matters relating to Working Drawings. Such authorization shall have the force and effect of any other representative of the Design-Builder’s organization.

Appears in 1 contract

Samples: Agreement

Working Drawings. The Design-Builder shall furnish Working Drawings and maintain a set for the Department as may be required. Working drawings shall not incorporate any changes from the requirements of the Contract unless the changes are specifically denoted, together with justification, and are approved in writing by the Department. The Design-Builder shall identify Working Drawings and submittals by the complete state project and job designation numbers. Items or component materials shall be identified by the specific Contract Item number and Specification reference in the Contract. A PE shall certify Working Drawings for Falsework supporting a Bridge superstructure. The Design-Builder shall provide four (4) sets of any submittal. If a railroad, municipality, or other entity as specified in the Contract Documents is required to review the Working Drawings, the reviewed Working Drawings will be returned within forty five (45) days from the date of receipt by the Department. If the Working Drawings are not returned by the time specified, no additional compensation will be allowed, but Design-Builder may submit, in accordance with the applicable requirements of the Contract Documents, a request for a time extension. Upon completion of the work, the original tracings, if required, shall be supplied to the Department. Deviations from the Contract requirements initiated by the Design-Builder shall be requested in writing and clearly identified on the Working Drawings. Explicit supporting justification shall be furnished specifically describing the reason for the requested deviations as well as any impact such deviations shall have on the schedule of Work. Failure to address time or other impacts associated with the Design-Builder’s request will be cause for rejection of the Design-Builder’s request. Deviations from the Contract requirements shall not be made unless authorized by the Engineer. If authorized by the Engineer, such authorization shall not relieve the Design-Builder from the responsibility for complying with the requirements of the Contract for a fully functional finished work item as specified or designed. The UponThe Design-Builder shall submit as-built working drawings upon completion of the Workrequested work, Working Drawings indicating the actual as-constructed field conditionsWork, if required, by shall be supplied xxxx the ContractDepartmentContract. The Design-Builder may authorize the fabricator in writing to act for him in matters relating to Working Drawings. Such authorization shall have the force and effect of any other representative of the Design-Builder’s organization.

Appears in 1 contract

Samples: Agreement

Working Drawings. The Design-Builder shall furnish Working Drawings shall have overall dimensions not greater than 28 inches by 42 inches, nor less than 22 inches by 34 inches, except as otherwise permitted by the Engineer. Drawings shall be complete and maintain shall have a set title block in the lower right hand corner that will identify Contractor, the subcontractor, the Construction Supplement by title and number, the subject matter of the drawing, and the serial number and date of each revision. Contractor shall submit one electronic copy in CADD (when requested by the Engineer) and Portable Document Format (PDF) and six copies of each working drawing to the Engineer for review unless the General Provisions in a Construction Supplement require additional copies. Working Drawings for any part of the permanent work shall include, but not be limited to, stress sheets, anchor bolt layouts, shop details, erection plans, equipment lists and any other information specifically required elsewhere in the specifications. Working Drawings for cribs, cofferdams, falsework, temporary support systems, haul bridges, centering and form work and for other temporary work and methods of construction Contractor proposes to use, shall be submitted when required by the specifications or ordered by the Engineer. Working Drawings shall be subject to acceptance insofar as the details affect the character of the finished work and for compliance with design requirements applicable to the construction when specified or called for, but details of design will be left to Contractor who shall be responsible for the Department as may successful construction of the Work. Each Working Drawing submitted by Contractor shall bear the approval stamp of Contractor and shall be required. marked to indicate any deviation in the Working drawings shall not incorporate any changes Drawing from the requirements of the Contract unless the changes are specifically denotedIFC Drawings and General Provisions. By approving and submitting Working Drawings, together with justificationContractor represents that he has determined and verified all field measurements, field construction criteria, materials, catalog numbers, and are approved in writing by similar data, and that he has checked and coordinated each Working Drawing with the Departmentrequirements of the Work and of the IFC Drawings and General Provisions. The Design-Builder shall identify Working Drawings and submittals by the complete state project and job designation numbers. Items or component materials shall be identified by the specific Contract Item number and Specification reference in the Contract. A PE shall certify Working Drawings for Falsework supporting a Bridge superstructure. The Design-Builder shall provide four (4) sets of any submittal. If a railroad, municipality, or other entity as specified in the Contract Documents is required to Engineer will review the Working Drawings, Drawings with reasonable promptness (however not less than 14 days shall be scheduled for such processing. The Engineer will make every effort to process the reviewed review of the Working Drawings will be returned within forty five (45) in not more than 28 days from the date of receipt from Contractor to the date it is returned to Contractor) so as to cause no delay, but only for conformance with the design concept of the Work and with the IFC Drawings and General Provisions. Two copies will be stamped "no exception taken," "exceptions as noted," or "revise as noted and resubmit," by the DepartmentEngineer or the Designer and returned to Contractor. If • Where a Working Drawing is returned marked "no exception taken," Contractor shall proceed with the Work in conformance with the Construction Supplement. • Where a Working Drawings are not Drawing is returned by marked "exceptions as noted," Contractor shall make the time specified, no additional compensation will be allowed, but Design-Builder may submit, changes noted on the submittal and proceed with the Work in accordance with the applicable requirements of the Contract Documents, a request for a time extension. Upon completion of the work, the original tracings, if required, shall be supplied to the Department. Deviations from the Contract requirements initiated by the Design-Builder shall be requested in writing IFC Drawings and clearly identified on the Working Drawings. Explicit supporting justification shall be furnished specifically describing the reason for the requested deviations as well as any impact such deviations shall have on the schedule of Work. Failure to address time or other impacts associated with the Design-Builder’s request will be cause for rejection of the Design-Builder’s request. Deviations from the Contract requirements shall not be made unless authorized by the Engineer. If authorized by the Engineer, such authorization shall not relieve the Design-Builder from the responsibility for complying with the requirements of the Contract for a fully functional finished work item as specified or designed. The Design-Builder shall submit as-built working drawings upon completion of the Work, if required, by the Contract. The Design-Builder may authorize the fabricator in writing to act for him in matters relating to Working Drawings. Such authorization shall have the force and effect of any other representative of the Design-Builder’s organization.General

Appears in 1 contract

Samples: mst.org

AutoNDA by SimpleDocs

Working Drawings. The Design-Builder shall furnish Working Drawings and maintain a set for the Department as may be required. Working drawings shall not incorporate any changes from the requirements of the Contract unless the changes are specifically denoted, together with justification, and are approved in writing by the Department. The Design-Builder shall identify Working Drawings and submittals by the complete state project and job designation numbers. Items or component materials shall be identified by the specific Contract Item number and Specification reference in the Contract. A PE shall certify Working Drawings for Falsework supporting a Bridge superstructure. The Design-Builder shall provide four (4) sets of any submittal. If a railroad, municipality, or other entity as specified in the Contract Documents is required to review the Working Drawings, the reviewed Working Drawings will be returned within forty five (45) 45 days from the date of receipt by the Department. If the Working Drawings are not returned by the time specified, no additional compensation will be allowed, but Design-Builder may submit, in accordance with the applicable requirements of the Contract Documents, a request for a time extension. Upon completion of the work, the original tracings, if required, shall be supplied to the Department. Deviations from the Contract requirements initiated by the Design-Builder shall be requested in writing and clearly identified on the Working Drawings. Explicit supporting justification shall be furnished specifically describing the reason for the requested deviations as well as any impact such Commonwealth of Virginia Virginia Department of Transportation 79 of 128 deviations shall have on the schedule of Work. Failure to address time or other impacts associated with the Design-Builder’s request will be cause for rejection of the Design-Builder’s request. Deviations from the Contract requirements shall not be made unless authorized by the Engineer. If authorized by the Engineer, such authorization shall not relieve the Design-Builder from the responsibility for complying with the requirements of the Contract for a fully functional finished work item as specified or designed. The Design-Builder shall submit as-built working drawings upon Upon completion of the Workrequested work, Working Drawings indicating the actual as-constructed field conditions, if required, by shall be supplied to the ContractDepartment. The Design-Builder may authorize the fabricator in writing to act for him in matters relating to Working Drawings. Such authorization shall have the force and effect of any other representative of the Design-Builder’s organization.

Appears in 1 contract

Samples: Agreement