Work Not Included Sample Clauses

Work Not Included. This proposal does not include the following work, and is conditioned on the proper performance of such work by the General Contractor or other Subcontractors. A legal hoistway properly framed and enclosed, and including a pit of proper depth provided with ladder, sump pump, lights, access doors and waterproofing as required. De-watering of pit(s). Legal machine room, adequate for the elevator equipment, including floors, trap doors, gratings, foundations, lighting, ventilation and heat to maintain the room at an ambient temperature of 50 degrees Fahrenheit minimum or 90 degrees Fahrenheit maximum, non- condensing. Adequate supports and foundations to carry the loads of all equipment, including support for guide rails brackets. Adequate bracing of entrance frames to prevent distortion during wall construction. Should additional weight need to be added to the counterweight to balance the cabs, there would be an additional charge added to the contract amount. It is agreed that in the event asbestos material is knowingly or unknowingly removed or disturbed in any manner at the jobsite, you will monitor our work place and prior to and during our xxxxxxx of the job, you will certify that asbestos in the environment does not exceed .01 fibers per cc as tested by NIOSH 7400. In the event our employees or those of our subcontractors are exposed to an asbestos hazard, PCP’s or other hazardous substances, you agree to indemnify, defend, and hold us harmless from all damages, claims, suits, expenses, and payments resulting from such exposure. Removal and disposal of asbestos containing material is the responsibility of the owner. All sill supports, including steel angles where required, and sill recesses (if sill angles not supplies by Elevator Contractor) and the grouting of doorsills. Provided by O.S.H.S. compliant removable temporary enclosures or other protection (barricades and kickboards) from open hoist-ways during the time the elevator is being installed (protection must allow clearance for installation of entrance frames). Proper trenching and backfilling for any underground piping and/or conduit. Cutting and patching of walls, floors, etc. and removal of such obstructions as may be necessary for proper installation of the elevator. Setting anchors and sleeves. Pockets or block outs for signal fixtures. Structural steel door frames with extensions to beam above if required on hoistway sides and xxxxx for freight elevators, including finish painting of these ...
AutoNDA by SimpleDocs
Work Not Included. The following items associated with work in this section do not form part of the Specification: • Obtaining those licenses, permits and approvals identified in Article 3.2 of Section “C” – SCOPE OF WORK.
Work Not Included. The following items associated with work in this section do not form part of the Specification: • Harvesting recoverable timber; • Clearing and grubbing non-recoverable timber and brush; • Controlling weeds on salvaged areas; • Controlling weeds, seeding, fertilizing and tree planting on reclaimed areas; and • Soil and vegetation monitoring of reclaimed areas.
Work Not Included. The following items associated with Work in this section do not form part of the Specification: • Obtaining those licenses, permits and approvals identified in Article 3.2 of Section “C” – SCOPE OF WORK; • Recovery of lenses of oil sands encountered in the Overburden mining face, unless included in an approved Change Order; • Recovery of aggregates encountered in the Overburden mining face, unless included in an approved Change Order; • Sampling overburden; • Designing dxxxx and obtaining permits for dxxxx; • Construction of dyke filter and blanket drains and associated collection and outlet ditches, as illustrated in the Drawings, including without limitation, loading, hauling and placement of the filter and blanket drain construction materials; • Construction of a seepage cut-off trench (“key trench”) beneath the core of a dyke, as illustrated in Attachment E – Dyke 10 Fill Construction Specifications included in Section “E” – ATTACHMENTS; and • Installation of instrumentation in the dxxxx.
Work Not Included. The following items associated with work in this section do not form part of the Specification: • Obtaining those licenses, permits and approvals identified in Article 3.2 of Section “C” – SCOPE OF WORK; • Obtaining permits for dxxxx used to contain tailings; • Design, procurement, construction, installation, operation and maintenance of the basal sand aquifer dewatering system; • Design, procurement, construction, installation, operation and maintenance of specific dewatering systems identified as supplied by Owner in Drawing number 11-PLN-MI-0012, entitled 2005 Muskeg Drainage Plan, included in the Drawings; and • Dewatering oil sands removal sites, other than to minimize surface water flow to such sites.
Work Not Included. Collection and analysis of environmental, hydrological, hydrogeological and meteorological monitoring data unless required by the Contractor for its design or other purposes, or for monitoring and reporting water qualities and quantities in accordance with Specification 400 – Contractor’s Dewatering.
Work Not Included. The following items associated with work in this section do not form part of the Specification: • Reporting of variances of actual costs from those planned.
AutoNDA by SimpleDocs
Work Not Included. Contractor will not be managing or directing Buyer personnel, policies, practices or procedures, nor will the work performed under this contract constitute direct or indirect support for decision making for CPCCo. The work does not include any hands-on field work, the performing of engineering evaluations, or proposal evaluations.
Work Not Included. Items of work specifically excluded or covered under other sections are:
Work Not Included. The following items are specifically excluded from the scope of this specification and will be provided by others: • Sea transportation, site unloading, site assembly and installation. • Internal lining of the Pressure Autoclave. • Supply and installation of pipework, agitators, valves to be connected. • Remote indicators, horns and process interlocks. • Supply and installation of all power, control and instrumentation cabling. • Lubricants other than initial oils/greases applied during shop assembly. • Statutory (classified plant) registration of the Pressure Autoclave.