Well Protection Clause Samples

Well Protection. The Project Developer shall repair any damage to Remedial System ▇▇▇▇▇ caused by Project Development. Prior to the initial Project Development demolition or construction field work, the MEW Companies shall field locate all Remedial System ▇▇▇▇▇. Prior to the start of Project Development field work, the Project Developer shall install brightly painted steel pipes over each Remedial System monitoring and extraction well designated by the MEW Companies. The painted pipe shall extend above ground not less than four feet, so as to be highly visible, and shall be buried sufficiently below the ground surface to protect the wellhead. Alternative equivalent well protection measures may be used by the Project Developer provided the MEW Companies approve any alternative protective measure in writing prior to its use. Additionally, all Project Development work within two (2) feet of Remedial System ▇▇▇▇▇ shall be performed manually with hand tools. Fine grading work performed in areas more than two feet from the Remedial System ▇▇▇▇▇ but within close proximity shall be performed by light grading equipment.
Well Protection. The Project Developer shall repair any damage to Remedial System ▇▇▇▇▇ caused by Project Development. Prior to the initial Project Development demolition or construction fieldwork, the Navy shall field locate all Remedial System ▇▇▇▇▇. Prior to the start of Project Development fieldwork, the Project Developer shall install brightly painted steel pipes over each Remedial System monitoring and extraction well designated by the Navy. The painted pipe shall extend above ground not less than four feet, so as to be highly visible, and shall be buried sufficiently below the ground surface to protect the wellhead. Alternative equivalent well protection measures may be used by the Project Developer provided the Navy approves any alternative protective measure in writing prior to its use. Additionally, all Project Development work within two feet of Remedial System ▇▇▇▇▇ shall be performed manually with hand tools. Fine grading work performed in areas more than two feet from the Remedial System ▇▇▇▇▇ but within close proximity shall be performed by light grading equipment.
Well Protection. The Contractor shall protect open ▇▇▇▇▇ by installing a steel locking cover which shall be maintained in place at all times unless work within the well is actively in progress.
Well Protection. The Vendor shall protect open ▇▇▇▇▇ by installing a steel locking cover which shall be maintained in place at all times unless work within the well is actively in progress.
Well Protection. There is a domestic water supply well located approximately four feet (4’) off of the rear edge of the drainage easement on the House #2094 property. Additionally, there is a longitudinal run of pipe from the well in the rear yard to the water tank at the side of the house. Contractor is to pay particular attention to this well and piping, and to take all necessary precautions to ensure that there is no damage. Contractor is responsible for any damage to the well and to arrange immediate repairs in the event that the well is damaged.