Water Vapor. The gas shall not have a water vapor content in excess of seven (7) pounds of water vapor per one million (1,000,000) cubic feet of gas.
AutoNDA by SimpleDocs
Water Vapor. Producers’ Gas and MV Mitigation Gas shall not contain more than 7 pounds of water per 1,000,000 Cubic Feet of Gas. Any Producers’ Gas or MV Mitigation Gas containing water vapor content in excess of 7 pounds of water per 1,000,000 Cubic Feet of Gas is subject to Section 2(b) of this Exhibit A.
Water Vapor. The Gas will not have a water vapor content in excess of seven (7) pounds per Mcf of Gas.
Water Vapor. Producers’ Gas shall not contain more than 7 pounds of water per 1,000,000 Cubic Feet of Gas. Any Producers’ Gas containing water vapor content in excess of 7 pounds of water per 1,000,000 Cubic Feet of Gas is subject to Section 2(b) of this Exhibit C.
Water Vapor. The Gas must not contain more than [**] pounds of water vapor per MMcf. ** Text Omitted and Filed Separately Confidential Treatment Requested Under 17 C.F.R. §§ 80(b)(4) and 240.24b-2

Related to Water Vapor

  • WATERBEDS The Tenant: (check one) ☐ - Shall have the right to use a waterbed on the Premises. ☐ - Shall not have the right to use a waterbed on the Premises.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges. Customer understands and agrees that included in the Administration Charge is the cost of the Energy Balancing Amount (defined below). Customer understands that in order for RITERATE ENERGY to be able to supply Energy to its existing and prospective customers, RITERATE ENERGY enters into supply arrangements to meet the forecasted consumption of its various groups of customers. These forecasts are based on historical data, load shapes and/or estimates. To the extent that actual pooled consumption of RITERATE ENERGY’s Energy customers varies from supply arrangements and/or Customer’s Utility delivery requirements, RITERATE ENERGY incurs a cost in balancing and settling its supply arrangements with such pooled consumption. To ensure a fixed all-inclusive Rate, RITERATE ENERGY has included in the Administration charge, the Energy Balancing Amount, to balance and settle the variance between pooled consumption and supply arrangements (the “Energy Balancing Amount”). In respect of Electricity, Customer understands that there are certain estimated pass through costs, made up of charges to RITERATE ENERGY by the PJM Interconnection (“PJM”) and/or Customer’s Utility, including but not limited to ancillary service charges, the cost of unaccounted for electricity, capacity charges and any replacement or recharacterization of these charges. In this regard, the “PJM Adjustment”, is included in the Fixed Price Rate. Customer acknowledges and agrees that by entering into this Agreement, Customer will not be eligible to receive any net metering credits and other incentives to which Customer would otherwise be entitled. Further, included in the Rate are the amounts charged or billed to RITERATE ENERGY or Customer by Customer’s Utility, the PUC or any other regulatory or government entity, including any taxes, delivery, regulated transmission, regulated distribution, pipeline, compressor fuel, uplift, congestion, locational marginal pricing, invoice market participant, service, billing, or similar or related changes and any, deposits, interest or late payment fees or other amounts in connection with the supply and delivery of Energy to the Premises (collectively, “Regulatory Charges”). Customer agrees to pay the monthly Administration charge for Energy supply (the “Administration” charge).

  • Wetlands When disposing of excess, soil, or other construction materials on public or private property, Contractor shall not fill in or otherwise convert wetlands.

  • Wastewater Developer shall install all required sewer lines and appurtenances. Prior to the issuance of any building permits for the Development, all sanitary sewer improvements shall be substantially completed as determined by the Town and all associated wastewater capacity fees shall be paid.