Voice Grade Loop Sample Clauses

Voice Grade Loop. Physical DS0 CO side to equipment All: Per intrastate Tariff [BA-MD P.S.C.-MD-No. 218] as amended from time to time Virtual DS0 with RFT CO side MDF to equipment Virtual DS1 with EDSX (1DS1 + 24 DS0s with IDLC) Virtual DS1 with CFA (24DS0s with IDLC)
AutoNDA by SimpleDocs

Related to Voice Grade Loop

  • Voice Grade Either an analog signal of 300 to 3000 Hz or a digital signal of 56/64 kilobits per second. When referring to digital Voice Grade service (a 56-64 kbps channel), the terms "DS0" or "sub-DS1" may also be used.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • WHOIS query RTT Refers to the RTT of the sequence of packets from the start of the TCP connection to its end, including the reception of the WHOIS response. If the RTT is 5-­‐times or more the corresponding SLR, the RTT will be considered undefined.

  • RDDS query RTT Refers to the collective of “WHOIS query RTT” and “Web-­‐based-­‐ WHOIS query RTT”.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Unbundled Voice Loops (UVLs) 2.2.1 BellSouth shall make available the following UVLs:

  • Customer Satisfaction 4.1 Services to be provided under Call Off Agreements to the satisfaction of Contracting Bodies 90% Confirmation by the Authority of the Supplier’s performance against customer satisfaction surveys

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Quarterly Contractor Performance Reporting Customers shall complete a Contractor Performance Survey (Exhibit I) for each Contractor on a Quarterly basis. Customers will electronically submit the completed Contractor Performance Survey(s) to the Department Contract Manager no later than the due date indicated in Contract Exhibit D, Section 17, Additional Special Contract Conditions. The completed Contractor Performance Survey(s) will be used by the Department as a performance-reporting tool to measure the performance of Contractors. The Department reserves the right to modify the Contractor Performance Survey document and introduce additional performance-reporting tools as they are developed, including online tools (e.g. tools within MyFloridaMarketPlace or on the Department's website).

Time is Money Join Law Insider Premium to draft better contracts faster.