Testing of Dependable Clause Samples
Testing of Dependable. Capacity shall be in accordance with the following provisions:
(a) Summer Period test shall last for twelve (12) hours from the time such testing is initiated. If integrated generation, net of parasitic load, is less than ninety-five percent (95%) of the prior Estimated Dependable Capacity or Dependable Capacity, as appropriate, for any 15 (fifteen) minute period during the Dependable Capacity Test, such failure shall constitute a Forced Outage and terminate the test.
(b) Winter Period test shall last for six (6) hours from the time such testing is initiated. If integrated generation, net of parasitic load, is less than ninety-five percent (95%) of the prior Estimated Dependable Capacity or Dependable Capacity, as appropriate, for any fifteen (15) minute period during the Dependable Capacity Test, such failure shall constitute a Forced Outage and terminate the test.
(c) During any capacity test, the Seller shall operate all Facility equipment (i) as normal expected throughout the life of the contract, (ii) within the engineering specifications of the equipment, and (iii) in compliance with Good Utility Practice.
