{"component": "clause", "props": {"groups": [{"snippet": "Prepare legal descriptions for Temporary Construc- tion Easements (TCE) for all parcels where the construction limits extend beyond the exist- ing/proposed right-of-way, and submit tract maps to the City that are suitable for mailing to property owners. The tract maps should include all features shown on the plans, including but not limited to structures, trees, fences, signs, monuments, etc, and should indicate if such items will be impacted within the required easement. Incorporate TCE limits on the plans.", "size": 5, "samples": [{"hash": "h6M8GJYBsU4", "uri": "/contracts/h6M8GJYBsU4#temporary-construction-easements", "label": "Professional Services", "score": 31.424911499, "published": true}, {"hash": "bMSjIjv3w1o", "uri": "/contracts/bMSjIjv3w1o#temporary-construction-easements", "label": "Professional Services", "score": 31.424911499, "published": true}, {"hash": "3PKrWWNGGHE", "uri": "/contracts/3PKrWWNGGHE#temporary-construction-easements", "label": "Professional Services", "score": 31.424911499, "published": true}], "snippet_links": [{"key": "legal-descriptions", "type": "clause", "offset": [8, 26]}, {"key": "construction-limits", "type": "definition", "offset": [98, 117]}, {"key": "to-the-city", "type": "definition", "offset": [192, 203]}, {"key": "property-owners", "type": "definition", "offset": [237, 252]}, {"key": "the-plans", "type": "clause", "offset": [306, 315]}, {"key": "not-limited", "type": "clause", "offset": [331, 342]}, {"key": "limits-on", "type": "clause", "offset": [493, 502]}], "hash": "37d112f4f66bfc0bf1abc6bef3526a83", "id": 3}, {"snippet": "The Phase I Owner and its Permittee(s) shall have nonexclusive, temporary construction easements in, to, over and across the Phase 2 Parcels for the purpose of constructing and installing the Easement Area Improvements within the Easement Areas. Such easements will terminate upon completion of the Easement Area Improvements.", "size": 2, "samples": [{"hash": "Db0J6li1Py", "uri": "/contracts/Db0J6li1Py#temporary-construction-easements", "label": "Standard Industrial/Commercial Single Tenant Lease (Nextest Systems Corp)", "score": 19.0, "published": true}, {"hash": "92GSvavTVD2", "uri": "/contracts/92GSvavTVD2#temporary-construction-easements", "label": "Standard Industrial/Commercial Single Tenant Lease (Nextest Systems Corp)", "score": 19.0, "published": true}], "snippet_links": [{"key": "phase-i", "type": "definition", "offset": [4, 11]}, {"key": "phase-2", "type": "definition", "offset": [125, 132]}, {"key": "for-the-purpose-of", "type": "definition", "offset": [141, 159]}, {"key": "easement-area-improvements", "type": "definition", "offset": [192, 218]}, {"key": "easement-areas", "type": "definition", "offset": [230, 244]}, {"key": "upon-completion-of-the", "type": "clause", "offset": [276, 298]}], "hash": "23dafa4aeab7831fa0fffdbd44ad002b", "id": 5}, {"snippet": "Prepare legal descriptions for Temporary Con- struction Easements (TCE) for all parcels where the construction limits extend beyond the ex- isting/proposed right-of-way, and submit tract maps to the City that are suitable for mailing to property owners. The tract maps should include all features shown on the plans, including but not limited to structures, trees, fences, signs, monuments, etc, and should indicate if such items will be impacted within the required easement. Incorporate TCE limits on the plans.", "size": 25, "samples": [{"hash": "3Imw4kZ1sHY", "uri": "/contracts/3Imw4kZ1sHY#temporary-construction-easements", "label": "Professional Services", "score": 31.858215332, "published": true}, {"hash": "5cYOKBHuywh", "uri": "/contracts/5cYOKBHuywh#temporary-construction-easements", "label": "Professional Services", "score": 31.4112243652, "published": true}, {"hash": "cuumxP221es", "uri": "/contracts/cuumxP221es#temporary-construction-easements", "label": "Professional Services", "score": 31.0420646667, "published": true}], "snippet_links": [{"key": "legal-descriptions", "type": "clause", "offset": [8, 26]}, {"key": "construction-limits", "type": "definition", "offset": [98, 117]}, {"key": "to-the-city", "type": "definition", "offset": [192, 203]}, {"key": "property-owners", "type": "definition", "offset": [237, 252]}, {"key": "the-plans", "type": "clause", "offset": [306, 315]}, {"key": "not-limited", "type": "clause", "offset": [331, 342]}, {"key": "limits-on", "type": "clause", "offset": [493, 502]}], "hash": "8dd7f03c4eb576b93dbb1013792144ac", "id": 1}, {"snippet": "Temporary construction easements for the purpose of the necessary grading and construction through and across the Property, said easements being located within the construction impact area as more particularly shown and depicted on the Plat. These temporary construction easements shall automatically terminate and become null and void at such time as improvements being constructed pursuant to Loudoun Water project number ___________, titled _________________________________________ have passed final inspection and been accepted by the Authority.", "size": 3, "samples": [{"hash": "9iRQLXAFJOO", "uri": "/contracts/9iRQLXAFJOO#temporary-construction-easements", "label": "Deed of Easement", "score": 33.6843261719, "published": true}, {"hash": "9VdeFSkTVr7", "uri": "/contracts/9VdeFSkTVr7#temporary-construction-easements", "label": "Deed of Easement", "score": 32.8425712585, "published": true}], "snippet_links": [{"key": "purpose-of-the", "type": "clause", "offset": [41, 55]}, {"key": "the-property", "type": "clause", "offset": [110, 122]}, {"key": "the-construction", "type": "clause", "offset": [160, 176]}, {"key": "impact-area", "type": "definition", "offset": [177, 188]}, {"key": "null-and-void", "type": "definition", "offset": [322, 335]}, {"key": "pursuant-to", "type": "definition", "offset": [383, 394]}, {"key": "project-number", "type": "clause", "offset": [409, 423]}, {"key": "final-inspection", "type": "clause", "offset": [498, 514]}, {"key": "by-the-authority", "type": "clause", "offset": [533, 549]}], "hash": "9490c579bbd55d0df110a7dcfdefa886", "id": 4}, {"snippet": "Temporary easements for the purpose of the necessary grading and construction through and across the Property, said easements being located within the construction impact area as more particularly shown and depicted on the Plat. These temporary easements shall automatically become null and void at such time as grading and construction for Loudoun Water project number , titled The said property and easements are more particularly bounded and described on plat number dated , 20 , revised through , prepared by , and titled, \u201c ,\u201d attached hereto and made a part hereof. The foregoing easement(s), including any and all facilities and rights-of-way, are collectively referred to herein as the \u201cEasements\u201d. The Easement(s) are subject to the following conditions:\n1. All (Reclaimed) Water Main Facilities and/or Sanitary Sewer Facilities which are installed in the Easement(s) shall be and remain the property of the Authority, its successors and assigns.\n2. The Authority and its agents shall have full and free use of the said Easement(s) for the purposes named, and shall have all rights and privileges reasonably necessary to the exercise of the Easement(s), including the right of access to and from the rights-of-way and the right to use abutting land adjoining the Easement(s) when necessary; provided, however, that this right to use abutting land shall be exercised only during periods of actual construction or maintenance, and then only to the minimum extent necessary for such construction and maintenance, and further, this right shall not be construed to allow the Authority to erect any building or structure of a permanent nature on such abutting land.\n3. The Authority shall have the right to trim, cut and remove trees, shrubbery, fences, structures or other obstructions or facilities in or near the Easement(s) being conveyed, deemed by it to interfere with the proper and efficient construction, operation and maintenance of said (Reclaimed) Water Main Facilities and/or Sanitary Sewer Facilities; provided, however, that the Authority, at its own expense, shall restore as nearly as possible to their original condition all lands or premises included within or abutting the said Easement(s) which are disturbed in any manner by the construction, operation and maintenance of said (Reclaimed) Water Main Facilities and/or Sanitary Sewer Facilities. Such restoration shall include the backfilling of trenches, the replacement of fences (so long as such fences comply with Paragraph 4 herein), the reseeding or resodding of lawns or pasture areas, the replacement of shrubbery and the replacement of structures and other facilities located outside of the Easement(s), but shall not include the replacement of trees or the replacement of structures and other facilities located within the Easement(s).\n4. The Owner(s) reserves the right to make any use of the Easement(s) which is not inconsistent with the rights herein conveyed to the Authority, and which does not interfere with the use of said Easement(s) by the Authority for the purposes named. By way of example only, and subject to the preceding sentence, such uses may include:\n(i) constructing and maintaining roadways and parking lots over said Easement(s),\n(ii) constructing trails, sidewalks and shared use paths within the Easement(s);\n(iii) planting shrubs within the Easement(s);\n(iv) installing within the Easement(s), utilities that are generally perpendicular to the Easement(s) and provide for the required vertical separation between the Water Main Facilities and/or Sanitary Sewer Facilities and the proposed utility line;\n(v) constructing fencing along the Easement, so long as such fencing is at least three (3) feet from the Water Main Facilities and/or Sanitary Sewer Facilities;\n(vi) constructing fencing generally perpendicular to the Easement(s) so long as such fencing is equipped with a gate at the intersection of such fence and the Easement(s), to which the Authority shall have a key; and\n(vii) installing signs, so long as such signs do not require any foundation. Notwithstanding Owner(s)\u2019s rights outlined in the foregoing paragraph, Owner(s) shall not, without Authority\u2019s prior written approval:\n(i) erect any building or other structure, including, but not limited to, dumpsters, loading docks, foundations or footings, and any fencing that does not comply with the terms of the preceding paragraph;\n(ii) plant trees on or within the Easement(s);\n(iii) install any structure or equipment that is ancillary to a utility, such as transformers, vaults, manholes, or cabinets; regardless of whether the utility is permitted to cross or be within the Easement(s);\n(iv) construct any type of ramp or overhead walkway or other above ground structure;\n(v) install parallel utility lines; or\n(vi) perform any other action that is inconsistent with the rights herein conveyed to the Authority. In the event that Owner(s) performs any action prohibited by this paragraph 4, the Authority shall have the right to remove such structure or otherwise remedy such action taken within the Easement(s), and seek reimbursement for such removal from Owner(s). [The following paragraph shall only be included if applicable. Please delete if this paragraph is not applicable] THIS DEED FURTHER WITNESSETH, that in consideration of the premises and the sum of One Dollar ($1.00), cash in hand paid, receipt of which is hereby acknowledged, the Authority hereby quitclaims, vacates and releases, WITHOUT WARRANTY, unto the Owner, its successors and assigns, all of its right, title and interest in and to those portions of the water main easements and of the sanitary sewer easements previously created by instrument recorded among the Land Records in Deed Book at Page and/or as Instrument Number Vacated\" and] [\"Hereby Vacated\"] [\" \"]. [The remainder of this page is intentionally blank] [\"To Be WITNESS the following signatures and seals: [COMPANY NAME] (SEAL) Name: Title: STATE OF CITY/COUNTY OF , to-wit: I, , a Notary Public in and for the City/County of , State of , whose commission as such will expire on the day of , 20 , do hereby certify that this day personally appeared before me in my City/County and State aforesaid, , whose name(s) is or are signed to the foregoing and hereunto annexed deed bearing date of the day of , 20____, and acknowledged the same before me. GIVEN under my hand this day of , 20 . (SEAL) Notary Public Registration Number: LOUDOUN COUNTY SANITATION AUTHORITY", "size": 2, "samples": [{"hash": "g2gggpZLpK1", "uri": "/contracts/g2gggpZLpK1#temporary-construction-easements", "label": "Deed of Easement", "score": 24.3757705688, "published": true}], "snippet_links": [{"key": "temporary-easements", "type": "clause", "offset": [0, 19]}, {"key": "purpose-of-the", "type": "clause", "offset": [28, 42]}, {"key": "the-property", "type": "clause", "offset": [97, 109]}, {"key": "the-construction", "type": "clause", "offset": [147, 163]}, {"key": "impact-area", "type": "definition", "offset": [164, 175]}, {"key": "null-and-void", "type": "definition", "offset": [282, 295]}, {"key": "project-number", "type": "clause", "offset": [355, 369]}, {"key": "said-property", "type": "definition", "offset": [383, 396]}, {"key": "prepared-by", "type": "definition", "offset": [501, 512]}, {"key": "the-foregoing", "type": "definition", "offset": [572, 585]}, {"key": "all-facilities", "type": "clause", "offset": [617, 631]}, {"key": "and-rights", "type": "clause", "offset": [632, 642]}, {"key": "subject-to-the-following-conditions", "type": "clause", "offset": [727, 762]}, {"key": "sanitary-sewer-facilities", "type": "clause", "offset": [812, 837]}, {"key": "of-the-authority", "type": "clause", "offset": [910, 926]}, {"key": "successors-and-assigns", "type": "clause", "offset": [932, 954]}, {"key": "authority-and", "type": "clause", "offset": [963, 976]}, {"key": "free-use", "type": "definition", "offset": [1008, 1016]}, {"key": "for-the-purposes", "type": "clause", "offset": [1041, 1057]}, {"key": "rights-and-privileges", "type": "definition", "offset": [1084, 1105]}, {"key": "reasonably-necessary", "type": "clause", "offset": [1106, 1126]}, {"key": "exercise-of-the", "type": "clause", "offset": [1134, 1149]}, {"key": "access-to", "type": "definition", "offset": [1186, 1195]}, {"key": "the-rights", "type": "clause", "offset": [1205, 1215]}, {"key": "right-to-use", "type": "definition", "offset": [1231, 1243]}, {"key": "land-adjoining", "type": "definition", "offset": [1253, 1267]}, {"key": "periods-of", "type": "clause", "offset": [1387, 1397]}, {"key": "necessary-for", "type": "definition", "offset": [1470, 1483]}, {"key": "construction-and-maintenance", "type": "clause", "offset": [1489, 1517]}, {"key": "to-allow-the", "type": "clause", "offset": [1566, 1578]}, {"key": "to-erect", "type": "definition", "offset": [1589, 1597]}, {"key": "a-permanent", "type": "clause", "offset": [1627, 1638]}, {"key": "maintenance-of", "type": "clause", "offset": [1931, 1945]}, {"key": "original-condition", "type": "definition", "offset": [2123, 2141]}, {"key": "replacement-of", "type": "clause", "offset": [2434, 2448]}, {"key": "paragraph-4", "type": "clause", "offset": [2492, 2503]}, {"key": "and-other-facilities", "type": "clause", "offset": [2630, 2650]}, {"key": "the-owner", "type": "clause", "offset": [2823, 2832]}, {"key": "right-to-make", "type": "clause", "offset": [2849, 2862]}, {"key": "to-the-authority", "type": "clause", "offset": [2948, 2964]}, {"key": "by-the-authority", "type": "clause", "offset": [3028, 3044]}, {"key": "parking-lots", "type": "clause", "offset": [3201, 3213]}, {"key": "shared-use", "type": "clause", "offset": [3277, 3287]}, {"key": "provide-for", "type": "definition", "offset": [3470, 3481]}, {"key": "vertical-separation", "type": "definition", "offset": [3495, 3514]}, {"key": "the-proposed", "type": "clause", "offset": [3586, 3598]}, {"key": "prior-written-approval", "type": "definition", "offset": [4179, 4201]}, {"key": "other-structure", "type": "definition", "offset": [4229, 4244]}, {"key": "not-limited", "type": "clause", "offset": [4261, 4272]}, {"key": "loading-docks", "type": "definition", "offset": [4288, 4301]}, {"key": "terms-of-the", "type": "clause", "offset": [4374, 4386]}, {"key": "type-of", "type": "definition", "offset": [4686, 4693]}, {"key": "above-ground", "type": "definition", "offset": [4728, 4740]}, {"key": "utility-lines", "type": "clause", "offset": [4773, 4786]}, {"key": "other-action", "type": "definition", "offset": [4808, 4820]}, {"key": "in-the-event", "type": "clause", "offset": [4892, 4904]}, {"key": "any-action", "type": "definition", "offset": [4928, 4938]}, {"key": "right-to-remove", "type": "clause", "offset": [5000, 5015]}, {"key": "action-taken", "type": "clause", "offset": [5056, 5068]}, {"key": "if-applicable", "type": "clause", "offset": [5196, 5209]}, {"key": "not-applicable", "type": "definition", "offset": [5246, 5260]}, {"key": "this-deed", "type": "clause", "offset": [5262, 5271]}, {"key": "the-premises", "type": "clause", "offset": [5317, 5329]}, {"key": "sum-of", "type": "clause", "offset": [5338, 5344]}, {"key": "cash-in-hand", "type": "definition", "offset": [5365, 5377]}, {"key": "receipt-of", "type": "clause", "offset": [5384, 5394]}, {"key": "title-and-interest", "type": "clause", "offset": [5560, 5578]}, {"key": "water-main-easements", "type": "clause", "offset": [5611, 5631]}, {"key": "sanitary-sewer-easements", "type": "clause", "offset": [5643, 5667]}, {"key": "created-by", "type": "definition", "offset": [5679, 5689]}, {"key": "land-records", "type": "clause", "offset": [5720, 5732]}, {"key": "intentionally-blank", "type": "clause", "offset": [5853, 5872]}, {"key": "witness-the-following-signatures-and-seals", "type": "clause", "offset": [5882, 5924]}, {"key": "company-name", "type": "definition", "offset": [5927, 5939]}, {"key": "state-of", "type": "clause", "offset": [5961, 5969]}, {"key": "county-of", "type": "clause", "offset": [5975, 5984]}, {"key": "notary-public", "type": "definition", "offset": [6002, 6015]}, {"key": "for-the-city", "type": "definition", "offset": [6023, 6035]}, {"key": "day-of", "type": "clause", "offset": [6103, 6109]}, {"key": "certify-that", "type": "clause", "offset": [6127, 6139]}, {"key": "county-and-state", "type": "clause", "offset": [6190, 6206]}, {"key": "date-of", "type": "clause", "offset": [6302, 6309]}, {"key": "given-under-my", "type": "definition", "offset": [6368, 6382]}, {"key": "registration-number", "type": "definition", "offset": [6428, 6447]}], "hash": "c114514c574d2c97c6844d5a87c0267b", "id": 7}, {"snippet": "Landlord hereby grants to Tenant and its successors and assigns the Temporary Construction Easements encumbering the Temporary Construction Easement Areas granting Tenant the right of entry over the Temporary Construction Easement Areas for purposes of construction of either the Tower Expansion or the Additional Parking Structure. The Temporary Construction Easements shall terminate upon the completion of construction of either the Tower Expansion or the Additional Parking Structure. The Temporary Construction Easements shall be exercised by Tenant, its successors and assigns, and any entity providing utility services to Tenant and the Projects in a manner that will minimize interference with the Landlord\u2019s property adjacent to the Temporary Construction Easement Areas or any business conducted thereon, including, without limitation, minimal interruption of traffic on the surrounding roadways entering into or exiting Landlord\u2019s said property.", "size": 1, "samples": [{"hash": "5oyDd3utu5f", "uri": "/contracts/5oyDd3utu5f#temporary-construction-easements", "label": "Ground Lease Agreement (Marina District Development Company, LLC)", "score": 22.245721817, "published": true}], "snippet_links": [{"key": "to-tenant", "type": "definition", "offset": [23, 32]}, {"key": "successors-and-assigns", "type": "clause", "offset": [41, 63]}, {"key": "easement-areas", "type": "definition", "offset": [140, 154]}, {"key": "right-of-entry", "type": "definition", "offset": [175, 189]}, {"key": "for-purposes-of", "type": "clause", "offset": [237, 252]}, {"key": "construction-of", "type": "clause", "offset": [253, 268]}, {"key": "parking-structure", "type": "definition", "offset": [314, 331]}, {"key": "completion-of-construction", "type": "clause", "offset": [395, 421]}, {"key": "by-tenant", "type": "definition", "offset": [545, 554]}, {"key": "utility-services", "type": "clause", "offset": [609, 625]}, {"key": "the-projects", "type": "clause", "offset": [640, 652]}, {"key": "minimize-interference", "type": "clause", "offset": [675, 696]}, {"key": "the-landlord", "type": "clause", "offset": [702, 714]}, {"key": "adjacent-to", "type": "definition", "offset": [726, 737]}, {"key": "business-conducted", "type": "clause", "offset": [787, 805]}, {"key": "without-limitation", "type": "clause", "offset": [826, 844]}, {"key": "entering-into", "type": "clause", "offset": [906, 919]}, {"key": "said-property", "type": "definition", "offset": [942, 955]}], "hash": "e5db57c56f3a42b59da0c47f7facd845", "id": 9}, {"snippet": "Subject to the terms and conditions set forth in this Agreement, the City and the CIC, as applicable, hereby agree to grant and convey to the Company and its successors and assigns, temporary, non-exclusive easements over the City\u2019s Project Surrounding Area for purposes of giving the Company an area in which to conduct construction activities necessary for the construction of the roadwork, the sanitary sewer and storm drainage facilities, the Utilities and the landscaping (the \u201cTemporary Construction Easements\u201d). The location of the Temporary Construction Easements shall be mutually agreed by the City and Company (and the CIC with respect to real property owned by the CIC) as necessary from time to time The Temporary Construction Easements shall terminate upon the Company\u2019s completion of all construction activities. The City and the CIC each reserve the right to use the area of the Temporary Construction Easements for purposes which will not interfere with the Company\u2019s enjoyment of the rights granted hereunder.", "size": 2, "samples": [{"hash": "dfGST4V6uAV", "uri": "/contracts/dfGST4V6uAV#temporary-construction-easements", "label": "Development Agreement", "score": 24.3415470123, "published": true}, {"hash": "jlYxr0hLWvY", "uri": "/contracts/jlYxr0hLWvY#temporary-construction-easements", "label": "Development Agreement", "score": 24.0595474243, "published": true}], "snippet_links": [{"key": "the-terms-and-conditions", "type": "definition", "offset": [11, 35]}, {"key": "in-this-agreement", "type": "definition", "offset": [46, 63]}, {"key": "the-city-and-the", "type": "clause", "offset": [65, 81]}, {"key": "agree-to", "type": "clause", "offset": [109, 117]}, {"key": "to-the-company", "type": "clause", "offset": [135, 149]}, {"key": "successors-and-assigns", "type": "clause", "offset": [158, 180]}, {"key": "surrounding-area", "type": "definition", "offset": [241, 257]}, {"key": "for-purposes-of", "type": "clause", "offset": [258, 273]}, {"key": "construction-activities", "type": "clause", "offset": [321, 344]}, {"key": "necessary-for", "type": "definition", "offset": [345, 358]}, {"key": "construction-of-the", "type": "clause", "offset": [363, 382]}, {"key": "sanitary-sewer", "type": "definition", "offset": [397, 411]}, {"key": "storm-drainage-facilities", "type": "definition", "offset": [416, 441]}, {"key": "location-of", "type": "definition", "offset": [523, 534]}, {"key": "by-the-city", "type": "clause", "offset": [597, 608]}, {"key": "and-company", "type": "clause", "offset": [609, 620]}, {"key": "with-respect-to", "type": "clause", "offset": [634, 649]}, {"key": "owned-by", "type": "definition", "offset": [664, 672]}, {"key": "from-time-to-time", "type": "clause", "offset": [695, 712]}, {"key": "upon-the-company", "type": "definition", "offset": [766, 782]}, {"key": "completion-of", "type": "definition", "offset": [785, 798]}, {"key": "all-construction", "type": "definition", "offset": [799, 815]}, {"key": "right-to-use", "type": "definition", "offset": [866, 878]}, {"key": "the-area", "type": "clause", "offset": [879, 887]}, {"key": "the-rights-granted", "type": "clause", "offset": [998, 1016]}], "hash": "a9b168cb2216b6ac9062ca4eb25184b3", "id": 6}, {"snippet": "Subject to any express conditions, limitations, or reservations contained herein, Declarants hereby establish and grant to Developer and to all Owners and their respective Permittees within the Overall Property, and the Operator, a temporary, non-exclusive, construction easement (the \u201cConstruction Easement\u201d) for the purpose of constructing the Critical Access Drives, Common Maintenance Area, the Utility Lines and any related alterations and improvements, as necessary for the orderly development and operation of the Overall Property, as and to the extent necessary to serve each Lot, over and across those portions of the Overall Property as reasonably necessary or advisable to perform such work; provided, however, that a constructing Owner may not, in using these temporary construction easements, interfere with or unreasonably interrupt the use of or operations on the Overall Property. No construction materials shall be stored outside of a temporary construction easement area, and no grading or tree removal shall occur within a temporary construction easement area without the specific approval of the Owner of the Lot upon which the work is occurring. All temporary construction easements will terminate adjacent to any portion of an easement upon which the applicable facilities are complete. Except as permitted hereunder, Owners and their Permittees shall not use, and shall not permit their employees, agents or contractors to use, other Owners\u2019 Lots for construction parking or staging, and shall not permit such employees, agents or contractors to use any of the driveways of the Overall Property, for construction related traffic.", "size": 1, "samples": [{"hash": "kJOWQyBAJyv", "uri": "/contracts/kJOWQyBAJyv#temporary-construction-easements", "label": "Declaration of Restrictive Covenants and Easement Agreement", "score": 32.4564781189, "published": true}], "snippet_links": [{"key": "subject-to", "type": "clause", "offset": [0, 10]}, {"key": "express-conditions", "type": "clause", "offset": [15, 33]}, {"key": "to-developer", "type": "clause", "offset": [120, 132]}, {"key": "the-operator", "type": "clause", "offset": [216, 228]}, {"key": "for-the-purpose-of", "type": "definition", "offset": [310, 328]}, {"key": "common-maintenance-area", "type": "definition", "offset": [370, 393]}, {"key": "utility-lines", "type": "clause", "offset": [399, 412]}, {"key": "alterations-and-improvements", "type": "definition", "offset": [429, 457]}, {"key": "necessary-for", "type": "definition", "offset": [462, 475]}, {"key": "operation-of-the", "type": "clause", "offset": [504, 520]}, {"key": "to-the-extent", "type": "clause", "offset": [546, 559]}, {"key": "to-serve", "type": "definition", "offset": [570, 578]}, {"key": "reasonably-necessary", "type": "clause", "offset": [647, 667]}, {"key": "constructing-owner", "type": "definition", "offset": [729, 747]}, {"key": "construction-materials", "type": "clause", "offset": [900, 922]}, {"key": "temporary-construction-easement-area", "type": "definition", "offset": [952, 988]}, {"key": "tree-removal", "type": "definition", "offset": [1008, 1020]}, {"key": "approval-of-the-owner", "type": "clause", "offset": [1100, 1121]}, {"key": "the-lot", "type": "clause", "offset": [1125, 1132]}, {"key": "the-work", "type": "definition", "offset": [1144, 1152]}, {"key": "adjacent-to", "type": "definition", "offset": [1219, 1230]}, {"key": "applicable-facilities", "type": "definition", "offset": [1273, 1294]}, {"key": "their-employees", "type": "definition", "offset": [1404, 1419]}, {"key": "other-owners", "type": "clause", "offset": [1451, 1463]}, {"key": "construction-parking", "type": "clause", "offset": [1474, 1494]}, {"key": "construction-related", "type": "clause", "offset": [1623, 1643]}], "hash": "3dcd64126c3efab65ef7378de2195cb4", "id": 10}, {"snippet": "The temporary construction easements granted herein shall expire upon completion of the Facilities contemplated herein.", "size": 1, "samples": [{"hash": "3VTlHdM5ZaC", "uri": "/contracts/3VTlHdM5ZaC#temporary-construction-easements", "label": "Reclaimed Water Supply, Easement and Discharge Agreement", "score": 28.4538516998, "published": true}], "snippet_links": [{"key": "completion-of-the-facilities", "type": "clause", "offset": [70, 98]}, {"key": "contemplated-herein", "type": "clause", "offset": [99, 118]}], "hash": "c80c667c9f07066bc7eece57ccb69bea", "id": 8}, {"snippet": "CSXT may grant without warranty to Agency, if required, a temporary non-exclusive easement for access to the extent necessary for the project on terms and conditions and at a price acceptable to the parties.", "size": 10, "samples": [{"hash": "799MgeNsDUO", "uri": "/contracts/799MgeNsDUO#temporary-construction-easements", "label": "Construction Agreement", "score": 35.1357650757, "published": true}, {"hash": "1OsfnUBxgbE", "uri": "/contracts/1OsfnUBxgbE#temporary-construction-easements", "label": "Preliminary Engineering/Construction Agreement", "score": 34.9195137024, "published": true}, {"hash": "lojZrhWPfa5", "uri": "/contracts/lojZrhWPfa5#temporary-construction-easements", "label": "Construction Agreement", "score": 34.5444946289, "published": true}], "snippet_links": [{"key": "if-required", "type": "definition", "offset": [43, 54]}, {"key": "to-the-extent", "type": "clause", "offset": [102, 115]}, {"key": "necessary-for", "type": "definition", "offset": [116, 129]}, {"key": "the-project", "type": "clause", "offset": [130, 141]}, {"key": "terms-and-conditions", "type": "clause", "offset": [145, 165]}, {"key": "the-parties", "type": "definition", "offset": [195, 206]}], "hash": "ccce0ceaa7d2fded2c9ad72ccb97a862", "id": 2}], "next_curs": "CmkSY2oVc35sYXdpbnNpZGVyY29udHJhY3RzckULEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2Iil0ZW1wb3JhcnktY29uc3RydWN0aW9uLWVhc2VtZW50cyMwMDAwMDAwYQyiAQJlbhgAIAA=", "clause": {"children": [], "size": 62, "parents": [["phase-ii-plan-development", "PHASE II - PLAN DEVELOPMENT"], ["field-check-plans", "Field Check Plans"], ["easements-and-licenses", "Easements and Licenses"], ["the-parties-hereto-mutually-agree", "THE PARTIES HERETO MUTUALLY AGREE"], ["easements", "Easements"]], "title": "Temporary Construction Easements", "id": "temporary-construction-easements", "related": [["additional-constructions", "ADDITIONAL CONSTRUCTIONS", "ADDITIONAL CONSTRUCTIONS"], ["new-construction", "New Construction", "New Construction"], ["design-and-construction-of-the-project-highway", "Design and Construction of the Project Highway", "Design and Construction of the Project Highway"], ["general-construction", "General Construction", "General Construction"], ["builders-risk-for-new-construction-projects", "BUILDER\u2019S RISK FOR NEW CONSTRUCTION PROJECTS", "BUILDER\u2019S RISK FOR NEW CONSTRUCTION PROJECTS"]], "related_snippets": [], "updated": "2025-07-24T04:27:51+00:00", "also_ask": ["What duration and scope limitations should be negotiated to minimize landowner disruption?", "Which indemnity and restoration obligations are essential to include for owner protection?", "How do local laws impact the enforceability and permissible uses of temporary construction easements?", "What are the most common disputes or litigation risks arising from these easements?", "How do temporary construction easement terms compare to permanent easements in terms of legal remedies?"], "drafting_tip": "Specify the easement area and duration to prevent boundary disputes; define permitted activities to limit misuse; require restoration obligations to ensure property is returned to original condition.", "explanation": "A Temporary Construction Easement clause grants a party the right to use a specific portion of another's property for a limited period to facilitate construction activities. This easement typically allows access for workers, equipment, and materials necessary for the completion of a project, such as installing utilities or making improvements adjacent to the property. Its core function is to provide legal permission for temporary use of land, ensuring construction can proceed efficiently while protecting the property owner's rights once the project is complete."}, "json": true, "cursor": ""}}