TECHNICAL SUMMARY Sample Clauses

TECHNICAL SUMMARY. Oz EduSpace products combine to provide a rapidly configurable workstation environment with powerful development tools for instructional designers, for training instructors, and for training participants. The Oz technology suite is a tightly integrated collection of proprietary technologies for developing and delivering effective training experiences using multimedia and virtual environments. The goals of the EduSpace technical architecture are: • To create a product that combines modern learning theory with modern computational techniques, a tool with sufficient power and simplicity to substantively improve the training of the American workforce, • To provide solution paths for known technical difficulties associated with bringing complex and effective training experiences to learners using high technology media, • To integrate the various levels of computation (hardware, software, modeling, interface) into a sound, tractable product architecture, • To allow for the utilization of innovative techniques with known performance gains while minimizing risk. To achieve complex functionality while keeping EduSpace simple to use, Oz has designed a technical architecture which combines high performance hardware and advanced software with an intuitive interface. The result is a system based on a single computational activity at the silicon level which performs an extremely diverse set of functions at the interface level while being easy to use. The technical plan has been designed to utilize recent advances in hardware and software techniques for computer-based training. The key innovations in the EduSpace product are: • Intuitive interface tools, • Qualitative process models, • Entity-based software, • Virtual and multimedia operating system, • Boundary mathematics, • VE-Chip and MS-Chip, and • OASIIS and the Interface Chair. The technical problems associated with computer-based training and with display of complex information are addressed by the EduSpace integrated architecture which incorporates the above innovations. The entity-based software architecture is the product of many years of research development at the University of Washington and at Stanford University. The EduSpace software and hardware interface (the Development Tools, OASIIS and the Interface Chair) are innovations being developed solely by Oz, and are original as well as unique. The accelerator chips have been prototyped for a completely separate NASA application, and will be substantively mo...
AutoNDA by SimpleDocs
TECHNICAL SUMMARY. The Offeror shall provide a succinct summary of what is proposed for each element, describing the approach or the design configuration and/or the proposed solution. In general, the description should be a short paragraph that provides only the factual description of what is proposed without adjectives or discussions of benefit.

Related to TECHNICAL SUMMARY

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • JOB SUMMARY In accordance with the Vision, Purpose, and Values, and strategic direction of the Vancouver Island Health Authority, patient safety is a priority and a responsibility shared by everyone at VIHA; as such, the requirement to continuously improve quality and safety is inherent in all aspects of this position. Within a multi-site operation, the Admitting & Health Records Clerk performs admitting, switchboard, transcription, records processing, cashier and reception duties as well as a variety of clerical duties.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • General Summary The Contractor shall be required to maintain all equipment in the Facility including, but not limited to the ventilating system, fire suppression, fire extinguishers, guard radio system, Traffic and Revenue Equipment, intercom system, Closed Circuit Television (CCTV), computers, guard tour verification hand held sensors and guard tour verification hand held stations, heat rise indicators, passenger elevators, roll down gates and all mechanical machinery, including replacement valve seats, valve bodies, door operating mechanism, car door hanger rollers, door saddle, pumps, and other required hydraulic elevator equipment, including cables, pulleys, tracks and other equipment for the cable elevator, ticket issuing machines, cash registers, fee indicators, toll equipment, and traffic counting apparatus. The Contractor shall maintain the 3M/Federal APD Auto Read-Fully Automated Traffic and Revenue System with Bar Code currently installed in the Facility. Contractor shall continue to maintain existing equipment and systems even if they are scheduled to be replaced. Failure to provide maintenance to any equipment or systems will result in the assessment of liquidated damages of $100.00/per day. All existing equipment and systems should be verified by each Bidder. At the commencement of this Contract, the Contractor shall re-key all appropriate locks in the Facility and provide NYCDOT with 2 sets of copies adequately identified for each lock that has been changed. Furthermore, the Contractor shall be required to maintain, at its own expense, all other equipment in the Facility, excluding equipment or systems designated for rehabilitation until such systems and equipment’s have been rehabilitated. Such maintenance shall include periodic testing, cleaning, lubrication, and preventive maintenance. Contractor shall maintain a record in the Facility of all such work. In addition, a written inventory of all furniture and all portable equipment owned by NYCDOT shall be taken on the effective date of this Contract, and signed by both parties. A similar inventory shall be taken at the expiration or termination of the Contract and signed by both parties. The Contractor is responsible for all structure, equipment and/or systems which may exist in spaces occupied or utilized in the performance of this Contract, including storage areas. The Contractor shall be responsible for the maintenance, care and custody of the Facility and all fixed and portable equipment and furniture and shall return same to NYCDOT in satisfactory condition when the contract expires or terminates. The Contractor agrees to maintain in good and safe condition required, electronic equipment, heating, and air conditioning equipment in the booths and in the manager office. The Contractor shall be responsible for the routine maintenance and cleaning of the Facility and shall inspect the Facility for dangerous conditions or defects, including but not limited to accumulations of grease or oil, broken glass, protruding objects, leaking gas tanks, broken or burned out lighting fixtures, litter, trip spots and hazards to tires. The Contractor shall immediately perform all necessary routine maintenance to remedy any such condition, defect, hazardous or public safety issue. Failure to provide immediate action to make condition safe can result in the assessment of $100.00/per day liquidated damages. When the Contractor does not provide satisfactory maintenance or service, the Contractor must pay to the City the value of such maintenance or service, when the value of such maintenance or service can be accurately determined. In the event that the value of said maintenance or service cannot be accurately determined, the Contractor shall be subject to the assessment of liquidated damages as noted below. The Contractor shall submit certified payrolls, sign in/out sheets, and proof of wage rate and/or supplemental benefits rate for any Work related to construction, reconstruction or maintenance of the Facility, including but not limited to, painting, concrete, brick, and plumbing. Subcontractor must submit Prevailing Wages Statement with Subcontractor Profile Form. Such documentation shall be submitted with the respective monthly invoices for the period of time the Work is carried out. Prevailing wages shall apply for this type of Work. The Contractor must obtain prior written approval from NYCDOT for any of its subcontractors to perform the Work. For further information, please refer to the Comptroller’s website, Labor Law, prevailing wage schedules, xxx.xxxxxxxxxxx.xxx.xxx.

  • Detailed Description of Services / Statement of Work Describe fully the services that Contractor will provide, or add and attach Exhibit B to this Agreement.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Technical changes The parties agree to make any technical changes that are mutually agreed prior to the collective agreement going out for ratification. The parties on signing this document acknowledge, subject to any subsequent agreed editorial and technical changes, that this reflects the agreements reached in the settlement of the Primary Teachers’ Collective Agreement 2019-2022. Signed in Wellington on 13 June 2019: Xxxx Xxxxxx Advocate for NZEI Te Riu Roa Xxx Xxxxxxxx Advocate for the Secretary for Education Witnessed: Xxxxxxx Xxxxx for NZSTA Attachment A: Elements from Previous Settlements

Time is Money Join Law Insider Premium to draft better contracts faster.