Common use of Technical and Interconnection Requirements Clause in Contracts

Technical and Interconnection Requirements. 2.1 The eligible consumer agrees that his solar generation plant and net feed-in system will conform to the standards and requirements specified in the following Regulations and codes as amended from time to time. (i) CEA’s (Technical Standards for connectivity of the Distributed Generating Resources) Regulations, 2013 (ii) Central Electricity Authority (Installation and Operation of Meters) Regulation 2006 (iii) Tamil Nadu Electricity Distribution Code (iv) Tamil Nadu Electricity Supply Code 2.2 Eligible consumer agrees that he has installed or will install, prior to connection of Photovoltaic system to TANGEDCO’s distribution system, an isolation device (both automatic and inbuilt within inverter and external manual relays) and agrees for the TANGEDCO to have access to and operation of this, if required and for repair & maintenance of the distribution system. 2.3 Eligible consumer agrees that in case of a power outage on TANGEDCO’s system, photovoltaic system will shut down, automatically and his plant will not inject power into Licensee’s distribution system.

Appears in 1 contract

Sources: Solar Net Feed in Connection Agreement

Technical and Interconnection Requirements. 2.1 The eligible consumer agrees that his solar generation plant and net feed-in metering system will conform to the standards and requirements specified in the following Regulations and codes as amended from time to time. (i) CEA’s (Technical Standards for connectivity of the Distributed Generating Resources) Regulations, 2013 (ii) Central Electricity Authority (Installation and Operation of Meters) Regulation 2006 (iii) Tamil Nadu Electricity Distribution Code (iv) Tamil Nadu Electricity Distribution Supply Code 2.2 Eligible consumer agrees that he has installed or will install, prior to connection of Photovoltaic system to TANGEDCO’s distribution system, an isolation device (both automatic and inbuilt within inverter and external manual relays) and agrees for the TANGEDCO to have access to and operation of this, if required and for repair & ξ maintenance of the distribution system. 2.3 Eligible consumer agrees that in case of a power outage on TANGEDCO’s system, photovoltaic system will shut down, automatically and his plant will not inject power into Licensee’s distribution system.

Appears in 1 contract

Sources: Net Metering Connection Agreement