System Protection Requirements. a) Long Lane - LaFarge Line 6 The Interconnection Customer will provide 115kV line protection to remove the generation for faults on Connecting Transmission Owner’s Long Lane - LaFarge Line 6 using a directional comparison unblocking (“DCUB”) for the primary scheme and step distance as the backup scheme. Redundant direct transfer trip ("DTT") will be used between the Albany 1 Collector Substation and the line terminal at Long Lane and LaFarge Substations to ensure removal of the generation. The 'A' package shall use power line carrier which will require installation of an RFL GARD 8000 PLC carrier set, a capacitor voltage transformer (“CVT”), line trap, and tuner at the Albany 1 Collector Substation. The 'B' package will use a leased digital circuit which will require installation of an RFL GARD 8000 teleprotection set at the Xxxxxx 0 Xxxxxxxxx Xxxxxxxxxx.
Appears in 3 contracts
Samples: Service Agreement, Service Agreement, Service Agreement
System Protection Requirements. a) Long Lane - LaFarge Line 6 The Interconnection Customer will provide 115kV line protection to remove the generation for faults on Connecting Transmission Owner’s Long Lane - LaFarge Line 6 using a directional comparison unblocking (“DCUB”) for the primary scheme and step distance as the backup scheme. Redundant direct transfer trip ("DTT") will be used between the Albany 1 2 Collector Substation and the line terminal at Long Lane and LaFarge Substations to ensure removal of the generation. The 'A' package shall use power line carrier which will require installation of an RFL GARD 8000 PLC carrier set, a capacitor voltage transformer (“CVT”), line trap, and tuner at the Albany 1 2 Collector Substation. The 'B' package will use a leased digital circuit which will require installation of an RFL GARD 8000 teleprotection set at the Xxxxxx 0 Xxxxxxxxx Xxxxxxxxxx.
Appears in 1 contract
Samples: Service Agreement