{"component": "clause", "props": {"groups": [{"snippet": "Immediately before marking the pavement surface, clean the surface of dirt, oil, grease, and foreign material, including curing compound on new concrete. Clean the surface 2 inches beyond the perimeter of the marking to be placed.", "samples": [{"hash": "ixWPI3v8NQ7", "uri": "/contracts/ixWPI3v8NQ7#surface-preparation", "label": "Construction Contract", "score": 25.708272934, "published": true}, {"hash": "5zqscvmlE0B", "uri": "/contracts/5zqscvmlE0B#surface-preparation", "label": "Construction Contract", "score": 23.8336753845, "published": true}, {"hash": "hnBvA6nPLNF", "uri": "/contracts/hnBvA6nPLNF#surface-preparation", "label": "Maintenance Roadway Repair Contract", "score": 21.4613285065, "published": true}], "size": 6, "snippet_links": [{"key": "foreign-material", "type": "clause", "offset": [93, 109]}], "hash": "e99d7865417e3d2f9095f097497be5a4", "id": 3}, {"snippet": "Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.", "samples": [{"hash": "hmJQtGCOOvc", "uri": "/contracts/hmJQtGCOOvc#surface-preparation", "label": "Roadway Contract", "score": 29.3390369415, "published": true}, {"hash": "2AFfaEvOPvm", "uri": "/contracts/2AFfaEvOPvm#surface-preparation", "label": "Roadway Contract", "score": 25.9474391937, "published": true}, {"hash": "bo6L0qvT7C5", "uri": "/contracts/bo6L0qvT7C5#surface-preparation", "label": "Roadway Contract", "score": 25.6381168365, "published": true}], "size": 11, "snippet_links": [{"key": "application-of-the", "type": "clause", "offset": [108, 126]}, {"key": "asphalt-surface-treatment", "type": "clause", "offset": [127, 152]}], "hash": "b1a9dac6a72ac2cc4f052d7286028300", "id": 1}, {"snippet": "1. The Contractor shall examine the areas and conditions under which work will be performed. The Contractor shall ensure that each surface is cleaned and prepared as required for proper adhesion.\n2. The Contractor shall correct conditions detrimental to timely and proper completion of the work, to include but not limited to the repair of minor holes, cracks, chips, rips, dings, etc. Should any surface be found unsuitable to produce a proper paint or sealant finish, the Contractor shall notify the County\u2019s Service Coordinator in writing and no painting products shall be applied until the unsuitable surfaces have been approved as satisfactory.\n3. For proper adhesion, the Contractor shall ensure that all surfaces to be coated are cleaned and free from rust, dirt, mildew, mold, algae, grease, oil, peeling and/or loose paint, powdery chalky residues and any other material or condition that may inhibit bonding and adhesion. Deterioration shall be removed with a combination of solvent or detergent washing, hand or power tool cleaning, to bring back to an acceptable surface. Glossy areas of sound previous coating need not be removed but should be mechanically abraded or chemically treated to create a surface profile that increases coating adhesion.\n4. The Contractor shall pressure clean exterior surfaces according to the pressure cleaning specification below where needed. Should old coatings begin to peel off, the Contractor shall use additional removal techniques to achieve a solid substrate including higher pressure washing, scraping, and wire brushing or ultimately, wet or dry sand blasting may be needed.\n5. On some buildings where elastomeric coatings were previously used, tests shall be made with a scraper to assure proper adhesion. If proper surface preparation underneath the elastomeric coating was not properly done, the elastomeric shall be peeled off with at least 3000 psi and with hand methods as necessary.\n6. The Contractor shall verify that all substrate conditions are ready to receive work prior to application of any painting products (primer, finish coats, etc.)\n7. The Contractor shall remove or mask electrical plates, nomenclature plates, hardware, trim or fittings prior to preparing surfaces or finishing. The Contractor shall ensure that all items removed are replaced to their original condition or better, prior to completion of the job.\n8. Rust Removal\n\u2587. \u2587\u2587\u2587\u2587 particles in stucco: For areas of rust run down from small embedded iron particles in stucco, the Contractor shall chip out the spots as best possible to remove the source of the rusting. Any remaining rust stains shall be sealed to prevent it from bleeding through.\nb. Exposed rusted rebar: For those areas with exposed \u2587\u2587\u2587\u2587\u2587 \u2587\u2587\u2587\u2587\u2587, the Contractor shall determine if sufficient structural damage has occurred to warrant concrete restoration. If that is the case, this work will be outside the scope of services of this contract, and the paint work shall be stopped until the County can provide for the proper restoration of the spalled, cracked stucco that occurred due to the exposed rusted rebar. In areas of light rust bleeding through from slightly exposed rebar, the rebar shall be wire brushed thoroughly and spot primed.\nc. Exposed metal surfaces: All exposed metal having \u2587\u2587\u2587\u2587\u2587 areas shall be hand tooled and/or mechanically abraded back to a bright metal finish in accordance with applicable SSPC standards. These areas shall then be treated with Ospho or equivalent rust inhibitor, primed and painted according to material schedule.\n9. Caulking Removal and Sealant\na. The Contractor shall ensure that all construction joints, expansion joints, inside angles or changes of direction, junctions of dissimilar materials (such as wood to stucco, metal to stucco, etc.), through wall penetrations (such as pipes, conduit, anchor bolts, etc.), window, all 90 degree angles on the top-side of all window \u2587\u2587\u2587\u2587\u2587, junction of the metal cap where one piece overlaps another, door, and slab joints are carefully inspected for caulking deterioration, loss of adhesion, cracking, etc. The Contractor shall ensure that failing caulk is removed thoroughly and the area cleaned with an appropriate solvent. Use of mineral spirits or turpentine is prohibited. Once caulk is removed and the void cleaned to a sound substrate, the Contractor shall install an acrylic-latex silicone or polyurethane caulk/sealant.\nb. The Contractor shall ensure that all areas being caulked are prepared as directed on the sealant product data sheets.\nc. The Contractor shall make every effort possible to reduce the \u201copen time\u201d of prepared joints to receive new caulk/sealant to prevent water intrusion.", "samples": [{"hash": "hGJW3jNpHwR", "uri": "/contracts/hGJW3jNpHwR#surface-preparation", "label": "Contract for Exterior Painting Services", "score": 26.1047229767, "published": true}, {"hash": "blQGP8zX5Yw", "uri": "/contracts/blQGP8zX5Yw#surface-preparation", "label": "Exterior Painting Services Contract", "score": 26.1047229767, "published": true}, {"hash": "4uYRyHutndx", "uri": "/contracts/4uYRyHutndx#surface-preparation", "label": "Contract for Exterior Painting Services", "score": 26.1047229767, "published": true}], "size": 6, "snippet_links": [{"key": "the-contractor-shall", "type": "clause", "offset": [3, 23]}, {"key": "conditions-under-which", "type": "clause", "offset": [46, 68]}, {"key": "as-required", "type": "clause", "offset": [163, 174]}, {"key": "completion-of-the-work", "type": "definition", "offset": [272, 294]}, {"key": "not-limited", "type": "clause", "offset": [311, 322]}, {"key": "repair-of", "type": "clause", "offset": [330, 339]}, {"key": "the-county", "type": "clause", "offset": [498, 508]}, {"key": "service-coordinator", "type": "definition", "offset": [511, 530]}, {"key": "in-writing", "type": "clause", "offset": [531, 541]}, {"key": "other-material", "type": "clause", "offset": [865, 879]}, {"key": "power-tool-cleaning", "type": "definition", "offset": [1023, 1042]}, {"key": "exterior-surfaces", "type": "definition", "offset": [1300, 1317]}, {"key": "according-to", "type": "definition", "offset": [1318, 1330]}, {"key": "cleaning-specification", "type": "definition", "offset": [1344, 1366]}, {"key": "pressure-washing", "type": "clause", "offset": [1527, 1543]}, {"key": "to-receive", "type": "definition", "offset": [2014, 2024]}, {"key": "application-of", "type": "clause", "offset": [2039, 2053]}, {"key": "finish-coats", "type": "clause", "offset": [2085, 2097]}, {"key": "all-items", "type": "definition", "offset": [2286, 2295]}, {"key": "original-condition", "type": "definition", "offset": [2326, 2344]}, {"key": "prior-to-completion", "type": "clause", "offset": [2356, 2375]}, {"key": "the-job", "type": "clause", "offset": [2379, 2386]}, {"key": "source-of", "type": "definition", "offset": [2577, 2586]}, {"key": "structural-damage", "type": "definition", "offset": [2791, 2808]}, {"key": "to-warrant", "type": "clause", "offset": [2822, 2832]}, {"key": "the-case", "type": "definition", "offset": [2866, 2874]}, {"key": "the-scope-of-services", "type": "clause", "offset": [2902, 2923]}, {"key": "this-contract", "type": "definition", "offset": [2927, 2940]}, {"key": "paint-work", "type": "clause", "offset": [2950, 2960]}, {"key": "provide-for", "type": "definition", "offset": [2999, 3010]}, {"key": "restoration-of", "type": "clause", "offset": [3022, 3036]}, {"key": "metal-surfaces", "type": "clause", "offset": [3252, 3266]}, {"key": "in-accordance-with", "type": "clause", "offset": [3384, 3402]}, {"key": "or-equivalent", "type": "definition", "offset": [3475, 3488]}, {"key": "construction-joints", "type": "clause", "offset": [3628, 3647]}, {"key": "expansion-joints", "type": "clause", "offset": [3649, 3665]}, {"key": "anchor-bolts", "type": "clause", "offset": [3840, 3852]}, {"key": "loss-of", "type": "clause", "offset": [4061, 4068]}, {"key": "the-area", "type": "clause", "offset": [4167, 4175]}, {"key": "an-appropriate", "type": "clause", "offset": [4189, 4203]}, {"key": "as-directed", "type": "clause", "offset": [4489, 4500]}, {"key": "data-sheets", "type": "clause", "offset": [4524, 4535]}, {"key": "open-time", "type": "definition", "offset": [4603, 4612]}, {"key": "water-intrusion", "type": "clause", "offset": [4673, 4688]}], "hash": "cfec6913d3aadbe1b937b407a5bd21e6", "id": 2}, {"snippet": "Use biodegradable soaps, cleaners and teak cleaners approved for ocean waters.", "samples": [{"hash": "2N88ah2ujIU", "uri": "/contracts/2N88ah2ujIU#surface-preparation", "label": "Maritime Contract", "score": 33.5560798645, "published": true}, {"hash": "eXDWsYdaLmP", "uri": "/contracts/eXDWsYdaLmP#surface-preparation", "label": "Maritime Contract", "score": 33.07554245, "published": true}, {"hash": "4ch0OyDcAg9", "uri": "/contracts/4ch0OyDcAg9#surface-preparation", "label": "Maritime Contract for Private Wharfage", "score": 23.336145401, "published": true}], "size": 5, "snippet_links": [{"key": "ocean-waters", "type": "definition", "offset": [65, 77]}], "hash": "7f29b59cdc0ab3de3fdd504e1b9fc548", "id": 4}, {"snippet": "Coating Application", "samples": [{"hash": "ci6rL2B26X", "uri": "/contracts/ci6rL2B26X#surface-preparation", "label": "Job Definitions and Lines of Progression Update", "score": 31.8291816711, "published": true}, {"hash": "5zDRV0UkhyP", "uri": "/contracts/5zDRV0UkhyP#surface-preparation", "label": "Job Definitions and Lines of Progression Agreement", "score": 31.5663928986, "published": true}, {"hash": "4LOEv5XSXXv", "uri": "/contracts/4LOEv5XSXXv#surface-preparation", "label": "Job Definitions and Lines of Progression Agreement", "score": 27.8271503448, "published": true}], "size": 4, "snippet_links": [], "hash": "cba8da9638192957e51ea8bb3ca35e1b", "id": 5}, {"snippet": "i. Use biodegradable soaps, cleaners and teak cleaners approved for ocean waters.\nii. Liberally use tarps to capture all scrapings, debris and drips. No material may enter the water.\niii. Only vibrator \u2587\u2587\u2587\u2587\u2587\u2587\u2587 (maximum of 2) with vacuum capture is allowed in the slips.\niv. Use a vacuum to remove all dust and debris. No material may enter the water.", "samples": [{"hash": "5K1rK52tagZ", "uri": "/contracts/5K1rK52tagZ#surface-preparation", "label": "Slip License Agreement", "score": 29.6582927704, "published": true}, {"hash": "hoYr7Z3Oglu", "uri": "/contracts/hoYr7Z3Oglu#surface-preparation", "label": "Dry Storage License Agreement", "score": 28.6582927704, "published": true}, {"hash": "bHnjYUzJLlS", "uri": "/contracts/bHnjYUzJLlS#surface-preparation", "label": "Dry Storage License Agreement", "score": 26.6582927704, "published": true}], "size": 4, "snippet_links": [{"key": "ocean-waters", "type": "definition", "offset": [68, 80]}, {"key": "no-material", "type": "clause", "offset": [150, 161]}], "hash": "d381936ab87474e95e6f2366557334a5", "id": 6}, {"snippet": "A. Remove all existing bituminous material that is unstable or non adherent to the pavement.\nB. Thoroughly clean the surface of the patch to remove dust and debris just prior to ACC placement.", "samples": [{"hash": "exFZoYPhEK2", "uri": "/contracts/exFZoYPhEK2#surface-preparation", "label": "Asphaltic Concrete Surface Patches Agreement", "score": 24.0704994202, "published": true}, {"hash": "jImv4oJNtKq", "uri": "/contracts/jImv4oJNtKq#surface-preparation", "label": "Asphaltic Concrete Surface Patches Agreement", "score": 23.5982208252, "published": true}, {"hash": "bWewV3Rqflz", "uri": "/contracts/bWewV3Rqflz#surface-preparation", "label": "Asphaltic Concrete Surface Patches Agreement", "score": 23.0930862427, "published": true}], "size": 4, "snippet_links": [{"key": "bituminous-material", "type": "clause", "offset": [23, 42]}, {"key": "thoroughly-clean", "type": "definition", "offset": [96, 112]}, {"key": "prior-to", "type": "clause", "offset": [169, 177]}], "hash": "0eee55fc59a7c41da14eab950387cff0", "id": 7}, {"snippet": "Surfaces shall be clean, dry to the touch, and free from dirt frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would tend to destroy or impair adhesion. Oil and grease shall be removed with solvent and surfaces shall be wiped dry with clean cloths. When resealing an existing joint, remove existing \u2587\u2587\u2587\u2587 or sealant prior to applying new sealant. For surface types not listed below, the sealant manufacturer shall be contacted for specific recommendations.", "samples": [{"hash": "6PMRijZSRzX", "uri": "/contracts/6PMRijZSRzX#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}, {"hash": "63mqSImCfma", "uri": "/contracts/63mqSImCfma#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}, {"hash": "31FJEv2qhi9", "uri": "/contracts/31FJEv2qhi9#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}], "size": 3, "snippet_links": [{"key": "oil-and-grease", "type": "definition", "offset": [184, 198]}, {"key": "prior-to", "type": "clause", "offset": [346, 354]}, {"key": "listed-below", "type": "clause", "offset": [399, 411]}, {"key": "specific-recommendations", "type": "clause", "offset": [461, 485]}], "hash": "076e8568ef807900419742ef19170ee7", "id": 8}, {"snippet": "Correct defects and inaccuracies in roof deck surface to eliminate poor drainage and hollow or low spots and perform the following:", "samples": [{"hash": "6PMRijZSRzX", "uri": "/contracts/6PMRijZSRzX#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}, {"hash": "63mqSImCfma", "uri": "/contracts/63mqSImCfma#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}, {"hash": "31FJEv2qhi9", "uri": "/contracts/31FJEv2qhi9#surface-preparation", "label": "Design Bid Build Construction Contract", "score": 20.1279945374, "published": true}], "size": 3, "snippet_links": [{"key": "roof-deck", "type": "clause", "offset": [36, 45]}], "hash": "510ff2dfd255a42a73ce1215d80137e9", "id": 9}, {"snippet": "Surface preparation is paid for by the square yard (meter) of the concrete surface acceptably repaired and blast cleaned prior to installation of the overlay. Payment includes all expenses associated with removal of existing concrete, repair and blast cleaning operations.", "samples": [{"hash": "gERqd2eMgWD", "uri": "/contracts/gERqd2eMgWD#surface-preparation", "label": "Contract", "score": 22.9739894867, "published": true}, {"hash": "8KmvaGxi0Aq", "uri": "/contracts/8KmvaGxi0Aq#surface-preparation", "label": "Contract", "score": 22.9110202789, "published": true}, {"hash": "9DbqEXgkds1", "uri": "/contracts/9DbqEXgkds1#surface-preparation", "label": "Amendment to Advertised Contract", "score": 22.5824775696, "published": true}], "size": 3, "snippet_links": [{"key": "installation-of-the", "type": "clause", "offset": [130, 149]}, {"key": "associated-with", "type": "definition", "offset": [189, 204]}, {"key": "removal-of", "type": "definition", "offset": [205, 215]}, {"key": "cleaning-operations", "type": "definition", "offset": [252, 271]}], "hash": "6918a1bc96f71c87dabf4a7a466ff169", "id": 10}], "next_curs": "ClwSVmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjgLEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhxzdXJmYWNlLXByZXBhcmF0aW9uIzAwMDAwMDBhDKIBAmVuGAAgAA==", "clause": {"children": [["dynamic-crack-repair", "Dynamic Crack Repair"], ["stucco-repair", "Stucco Repair"], ["static-crack-repair", "Static Crack Repair"], ["", ""], ["concrete-and-masonry", "Concrete and Masonry"]], "size": 153, "parents": [["preparation", "Preparation"], ["construction", "Construction"], ["public-records-compliance-applicable-for-service-contracts", "PUBLIC RECORDS COMPLIANCE (APPLICABLE FOR SERVICE CONTRACTS"], ["bid-preference", "BID PREFERENCE"], ["painting-technical-specifications", "Painting Technical Specifications"]], "title": "Surface Preparation", "id": "surface-preparation", "related": [["site-preparation", "Site Preparation", "Site Preparation"], ["joint-preparation", "Joint Preparation", "Joint Preparation"], ["proposal-preparation", "Proposal Preparation", "Proposal Preparation"], ["document-preparation", "DOCUMENT PREPARATION", "DOCUMENT PREPARATION"], ["preparation", "Preparation", "Preparation"]], "related_snippets": [], "updated": "2025-07-24T06:49:08+00:00", "also_ask": ["What minimum standards or industry benchmarks should be specified for surface preparation?", "How can liability for inadequate surface preparation be allocated or limited in the clause?", "What documentation or inspection rights should be included to verify compliance?", "How does this clause compare to standard surface preparation provisions in similar contracts?", "What are the most common disputes over surface preparation, and how have courts resolved them?"], "drafting_tip": "Specify required surface conditions to ensure quality results, list acceptable preparation methods to standardize procedures, and reference industry standards to facilitate compliance.", "explanation": "The Surface Preparation clause defines the requirements and standards for preparing surfaces before the application of coatings, finishes, or other treatments. It typically outlines the methods, materials, and conditions necessary to ensure that surfaces are clean, dry, and free from contaminants such as dust, grease, or old paint. For example, it may specify sandblasting, chemical cleaning, or other techniques appropriate for the material involved. The core function of this clause is to ensure that subsequent work adheres properly and achieves the desired durability and appearance, thereby preventing premature failure or defects."}, "json": true, "cursor": ""}}