{"component": "clause", "props": {"groups": [{"samples": [{"hash": "cFZKijDRqui", "uri": "/contracts/cFZKijDRqui#subsurface-utility-engineering", "label": "Work Authorization", "score": 24.9192333221, "published": true}, {"hash": "emu5e3RkZi9", "uri": "/contracts/emu5e3RkZi9#subsurface-utility-engineering", "label": "Work Authorization", "score": 24.9000682831, "published": true}, {"hash": "6CmtCajtyOi", "uri": "/contracts/6CmtCajtyOi#subsurface-utility-engineering", "label": "Work Authorization", "score": 24.9000682831, "published": true}], "size": 6, "snippet": "Subsurface Utility Engineering services includes utility investigations subsurface and above ground prepared in accordance with AASHTO standards and Utility Quality Levels as defined in the Utilities Section of the Design Criteria Manual. Based on the review of existing utilities and proposed roadway design, bridge design, drainage design, and other potential conflicts for utilities, the Utility Coordinator will recommend required test holes after completion of 60% conflict assessment. The Utility Coordinator will coordinate with the appropriate Utility Owner to utilize internal work forces toperformrequiredtestholesfor verification of its facilities. If requested, the Utility Coordinator will coordinate with the County and/or its Designated Representative to provide the required test holes. A sketch of the area to be included for the proposed test hole locations \u201cLevel A\u201d will be provided prior to the start of the work and must be approved by the County and/or its Designated Representative. The County or its Designated Representative will provide comments or approval of test hole plan within five (5) business days.\n4.1. Subsurface Utility Designate Service (Quality Level B). Designate means to indicate the horizontal location of underground utilities by the application and interpretation of appropriate non-destructive surface geophysical techniques and reference to established survey control. Designate (Quality Level B) Services are inclusive of Quality Levels C and D. The Utility Coordinator shall:\n4.1.1. As requested by the County, compile \"As Built\" information from plans, plats and other location data as provided by the utility owners.\n4.1.2. Coordinate with utility owner when utility owner's policy is to designate their own facilities at no cost for preliminary survey purposes. The Utility Coordinator will examine utility owner's work toensure accuracy and completeness.\n4.1.3. Designate, record and mark the horizontal location of the existing utility facilities and their service laterals to existing buildings using non-destructive surface geophysical techniques. No storm sewer facilities are to be designated unless authorized by the County. Anon-water base paint, utilizing the APWA colorcode scheme, must be used on all surface markings of underground utilities.\n4.1.4. Correlate utility owner records with designating data and resolve discrepancies using professional judgment. A color-coded composite utility facility plan with utility owner names, quality levels, line sizes and subsurface utility locate(test hole) locations, if applicable will be prepared and delivered to the County or its Designated Representative. It is understood by both the Utility Coordinator and the County that the line sizes of designated utility facilities detailed on the deliverable are from the best available records and that an actual line size is normally determined from a test hole vacuum excavation. A note must be placed on the designate deliverable only that states \"lines sizes are from best available records\". All above ground appurtenance locations must beincluded in thedeliverable to the County. This information will be provided in Microstation, Geopak or other applicable County/County's Design Consultant CADD system. The electronic file will be uploaded to Project Wise. A hard copy is required and must be sealed and dated by the Utility Coordinator. When requested by the County or its Designated Representative, the designated utility information must beover laid onthe County design plans.\n4.1.5. Determine and inform the County of the approximate utility depths at critical locations as determined by the County or its Designated Representative. This depth indication is understood by both the Utility Coordinator and the County and its Designated Representative to be approximate only.\n4.1.6. Clearly identify all utilities that were discovered from quality levels C and D investigation but cannot be depicted in quality level B standards. These utilities must have a unique line style and symbology in the designate (Quality Level B) deliverable.\n4.2. Subsurface Utility Locate (Test Hole) Service (Quality Level A). Locate means to obtain precise horizontal and vertical position, material type, condition, size and other data that may be obtainable about the utility facility and its surrounding environment through exposure by nondestructive excavation techniques that ensures the integrity of the utility facility. All test holes will be tied to project survey control provided by the County or its Designated Representative. Subsurface Utility Locate (Test Hole) Services (Quality Level A) are inclusive of Quality Levels B, C, and D. The Utility Coordinator shall:\n4.2.1. Review requested test hole locations and advise the County and/or its Designated Representative in the development of an appropriate locate (test hole) work plan relative to the existing utility infrastructure and proposed highway design elements.\n4.2.2. Coordinate with utility owner inspectors as may be required by law or utility owner policy\n4.2.3. Neatly cut and remove existing pavement material, such that the cut not exceed 1 square foot unless unusual circumstances exist.\n4.2.4. Measure and record the following data, as required, on an appropriately formatted test hole data sheet and upload to design project folder in ProjectWise.\n4.2.4.1. Elevation of top and/or bottom of utility tied to the datum of the furnished plan.", "snippet_links": [{"key": "engineering-services", "type": "clause", "offset": [19, 39]}, {"key": "utility-investigations", "type": "clause", "offset": [49, 71]}, {"key": "above-ground", "type": "definition", "offset": [87, 99]}, {"key": "in-accordance-with", "type": "clause", "offset": [109, 127]}, {"key": "utility-quality-levels", "type": "clause", "offset": [149, 171]}, {"key": "design-criteria-manual", "type": "definition", "offset": [215, 237]}, {"key": "based-on", "type": "definition", "offset": [239, 247]}, {"key": "review-of", "type": "clause", "offset": [252, 261]}, {"key": "existing-utilities", "type": "clause", "offset": [262, 280]}, {"key": "roadway-design", "type": "clause", "offset": [294, 308]}, {"key": "bridge-design", "type": "clause", "offset": [310, 323]}, {"key": "drainage-design", "type": "clause", "offset": [325, 340]}, {"key": "potential-conflicts", "type": "clause", "offset": [352, 371]}, {"key": "the-utility-coordinator", "type": "clause", "offset": [387, 410]}, {"key": "completion-of", "type": "definition", "offset": [452, 465]}, {"key": "conflict-assessment", "type": "clause", "offset": [470, 489]}, {"key": "utility-owner", "type": "definition", "offset": [552, 565]}, {"key": "work-forces", "type": "definition", "offset": [586, 597]}, {"key": "designated-representative", "type": "clause", "offset": [741, 766]}, {"key": "provide-the", "type": "clause", "offset": [770, 781]}, {"key": "the-area", "type": "clause", "offset": [815, 823]}, {"key": "the-proposed", "type": "clause", "offset": [843, 855]}, {"key": "test-hole", "type": "definition", "offset": [856, 865]}, {"key": "level-a", "type": "definition", "offset": [877, 884]}, {"key": "prior-to-the", "type": "clause", "offset": [903, 915]}, {"key": "work-and", "type": "clause", "offset": [929, 937]}, {"key": "by-the-county", "type": "clause", "offset": [955, 968]}, {"key": "will-provide", "type": "clause", "offset": [1051, 1063]}, {"key": "approval-of", "type": "definition", "offset": [1076, 1087]}, {"key": "business-days", "type": "clause", "offset": [1119, 1132]}, {"key": "level-b", "type": "definition", "offset": [1185, 1192]}, {"key": "location-of", "type": "definition", "offset": [1238, 1249]}, {"key": "underground-utilities", "type": "definition", "offset": [1250, 1271]}, {"key": "interpretation-of", "type": "clause", "offset": [1295, 1312]}, {"key": "reference-to", "type": "definition", "offset": [1376, 1388]}, {"key": "survey-control", "type": "clause", "offset": [1401, 1415]}, {"key": "inclusive-of", "type": "clause", "offset": [1458, 1470]}, {"key": "requested-by", "type": "clause", "offset": [1536, 1548]}, {"key": "information-from", "type": "clause", "offset": [1580, 1596]}, {"key": "location-data", "type": "clause", "offset": [1620, 1633]}, {"key": "by-the-utility", "type": "clause", "offset": [1646, 1660]}, {"key": "at-no-cost", "type": "definition", "offset": [1771, 1781]}, {"key": "preliminary-survey", "type": "clause", "offset": [1786, 1804]}, {"key": "accuracy-and-completeness", "type": "clause", "offset": [1882, 1907]}, {"key": "existing-utility-facilities", "type": "definition", "offset": [1974, 2001]}, {"key": "existing-buildings", "type": "clause", "offset": [2032, 2050]}, {"key": "using-non", "type": "clause", "offset": [2051, 2060]}, {"key": "sewer-facilities", "type": "clause", "offset": [2114, 2130]}, {"key": "authorized-by", "type": "definition", "offset": [2159, 2172]}, {"key": "professional-judgment", "type": "clause", "offset": [2401, 2422]}, {"key": "facility-plan", "type": "definition", "offset": [2456, 2469]}, {"key": "if-applicable", "type": "clause", "offset": [2575, 2588]}, {"key": "be-prepared", "type": "clause", "offset": [2594, 2605]}, {"key": "to-the-county", "type": "definition", "offset": [2620, 2633]}, {"key": "the-line", "type": "definition", "offset": [2737, 2745]}, {"key": "the-deliverable", "type": "definition", "offset": [2797, 2812]}, {"key": "vacuum-excavation", "type": "clause", "offset": [2918, 2935]}, {"key": "a-note", "type": "clause", "offset": [2937, 2943]}, {"key": "applicable-county", "type": "definition", "offset": [3208, 3225]}, {"key": "design-consultant", "type": "definition", "offset": [3235, 3252]}, {"key": "electronic-file", "type": "clause", "offset": [3270, 3285]}, {"key": "hard-copy", "type": "definition", "offset": [3322, 3331]}, {"key": "the-designated", "type": "definition", "offset": [3464, 3478]}, {"key": "utility-information", "type": "clause", "offset": [3479, 3498]}, {"key": "design-plans", "type": "definition", "offset": [3529, 3541]}, {"key": "county-of", "type": "clause", "offset": [3575, 3584]}, {"key": "all-utilities", "type": "clause", "offset": [3865, 3878]}, {"key": "material-type", "type": "definition", "offset": [4238, 4251]}, {"key": "other-data", "type": "definition", "offset": [4273, 4283]}, {"key": "integrity-of", "type": "clause", "offset": [4440, 4452]}, {"key": "project-survey", "type": "clause", "offset": [4506, 4520]}, {"key": "development-of", "type": "clause", "offset": [4837, 4851]}, {"key": "an-appropriate", "type": "clause", "offset": [4852, 4866]}, {"key": "work-plan", "type": "definition", "offset": [4886, 4895]}, {"key": "utility-infrastructure", "type": "definition", "offset": [4921, 4943]}, {"key": "design-elements", "type": "definition", "offset": [4965, 4980]}, {"key": "required-by-law", "type": "definition", "offset": [5040, 5055]}, {"key": "owner-policy", "type": "definition", "offset": [5067, 5079]}, {"key": "square-foot", "type": "definition", "offset": [5168, 5179]}, {"key": "unusual-circumstances", "type": "definition", "offset": [5187, 5208]}, {"key": "as-required", "type": "clause", "offset": [5262, 5273]}, {"key": "data-sheet", "type": "definition", "offset": [5315, 5325]}, {"key": "design-project", "type": "definition", "offset": [5340, 5354]}], "hash": "e1416db6a4a776110dd5b0a76ae30458", "id": 1}, {"samples": [{"hash": "9IViZlv1zwm", "uri": "/contracts/9IViZlv1zwm#subsurface-utility-engineering", "label": "Standard Form of Agreement for Open Ended Professional Design Services", "score": 23.1319637299, "published": true}, {"hash": "3HKUgcndReP", "uri": "/contracts/3HKUgcndReP#subsurface-utility-engineering", "label": "Standard Form of Agreement for Open Ended Professional Design Services", "score": 23.1288661957, "published": true}, {"hash": "1BRGfNNHUE1", "uri": "/contracts/1BRGfNNHUE1#subsurface-utility-engineering", "label": "Standard Form of Agreement for Open Ended Professional Design Services", "score": 19.2970561981, "published": true}], "size": 5, "snippet": "Providing the location and identification of unknown, unobservable underground facilities, utilities, tanks and other buried objects to the extent required for construction of the project. Prospecting techniques including radio frequency electromagnetic, magnetic acoustic emission sonics, terrain conductivity, ground penetrating radar and select excavation shall be used to provide a comprehensive horizontal map and give an indication of vertical position. Information obtained using this service shall be shown on the Plat of Survey of the project site. The Direct Labor rates and Overhead costs and rates for reimbursable expenses that shall be used by the Professional and any consultants for the term of this Agreement shall be those Hourly Rates attached to or listed in Rider D.\n1. For the additional services described in Exhibit C subparagraphs \u201c1\u201d through \u201c11\u201d, compensation shall be mutually agreed upon in advance by the School District and the Professional and reflected in the original Agreement or set forth in a Fiscal Adjustment to the Agreement. In the event an agreement in advance cannot be reached, the School District may direct the Professional to provide the additional services, in which case the Professional shall provide said services and shall keep a daily record of his cost for performing the additional services. After the additional services are completed by the Professional or are terminated by the School District, the Professional may submit an itemized claim for the cost incurred in performing the additional services.\n2. For the additional services described in Exhibit C subparagraphs \u201c12\u201d through \u201c17\u201d, compensation shall be based upon the actual cost of services. If the services are performed by an entity other than the Professional, the School District shall consider the actual cost of such services to be the amount paid to that entity by the Professional after soliciting bids or proposals approved by the School District, plus ten percent (10%) of that amount for the Professional\u2019s expenses and profit. Should the Professional perform these additional services, the actual costs of such services shall be at the hourly rates. This Individual Work Order is being issued on the day of , 200 , by and between the Warren County School District (hereinafter called the \"School District\") and All terms, requirements conditions and considerations of the Standard Form of Agreement for Open-Ended Professional Design Services previously executed between the School District and the Professional on the day of , 200 , are hereby referenced and made a part hereof as if attached.", "snippet_links": [{"key": "location-and-identification", "type": "clause", "offset": [14, 41]}, {"key": "underground-facilities", "type": "clause", "offset": [67, 89]}, {"key": "to-the-extent", "type": "clause", "offset": [133, 146]}, {"key": "construction-of-the-project", "type": "clause", "offset": [160, 187]}, {"key": "radio-frequency", "type": "definition", "offset": [222, 237]}, {"key": "ground-penetrating-radar", "type": "clause", "offset": [312, 336]}, {"key": "provide-a", "type": "definition", "offset": [376, 385]}, {"key": "plat-of-survey", "type": "definition", "offset": [522, 536]}, {"key": "the-project-site", "type": "clause", "offset": [540, 556]}, {"key": "labor-rates", "type": "definition", "offset": [569, 580]}, {"key": "overhead-costs", "type": "definition", "offset": [585, 599]}, {"key": "for-reimbursable-expenses", "type": "clause", "offset": [610, 635]}, {"key": "the-professional", "type": "clause", "offset": [658, 674]}, {"key": "the-term-of-this-agreement", "type": "clause", "offset": [699, 725]}, {"key": "hourly-rates", "type": "clause", "offset": [741, 753]}, {"key": "additional-services-described", "type": "clause", "offset": [799, 828]}, {"key": "exhibit-c", "type": "definition", "offset": [832, 841]}, {"key": "mutually-agreed", "type": "clause", "offset": [896, 911]}, {"key": "in-advance", "type": "clause", "offset": [917, 927]}, {"key": "the-school-district", "type": "clause", "offset": [931, 950]}, {"key": "agreement-or", "type": "definition", "offset": [1002, 1014]}, {"key": "adjustment-to", "type": "clause", "offset": [1037, 1050]}, {"key": "the-agreement", "type": "clause", "offset": [1051, 1064]}, {"key": "in-the-event", "type": "clause", "offset": [1066, 1078]}, {"key": "an-agreement", "type": "clause", "offset": [1079, 1091]}, {"key": "district-may-direct", "type": "clause", "offset": [1133, 1152]}, {"key": "provide-the", "type": "clause", "offset": [1173, 1184]}, {"key": "services-and", "type": "clause", "offset": [1256, 1268]}, {"key": "record-of", "type": "clause", "offset": [1288, 1297]}, {"key": "completed-by", "type": "clause", "offset": [1381, 1393]}, {"key": "cost-incurred", "type": "definition", "offset": [1507, 1520]}, {"key": "cost-of-services", "type": "definition", "offset": [1691, 1707]}, {"key": "the-services", "type": "definition", "offset": [1712, 1724]}, {"key": "performed-by", "type": "clause", "offset": [1729, 1741]}, {"key": "district-shall", "type": "clause", "offset": [1792, 1806]}, {"key": "services-to-be", "type": "clause", "offset": [1840, 1854]}, {"key": "amount-paid", "type": "clause", "offset": [1859, 1870]}, {"key": "soliciting-bids", "type": "clause", "offset": [1912, 1927]}, {"key": "approved-by", "type": "clause", "offset": [1941, 1952]}, {"key": "expenses-and", "type": "clause", "offset": [2035, 2047]}, {"key": "costs-of", "type": "clause", "offset": [2126, 2134]}, {"key": "work-order", "type": "clause", "offset": [2195, 2205]}, {"key": "issued-on", "type": "clause", "offset": [2215, 2224]}, {"key": "day-of", "type": "clause", "offset": [2229, 2235]}, {"key": "all-terms", "type": "clause", "offset": [2340, 2349]}, {"key": "agreement-for", "type": "clause", "offset": [2418, 2431]}, {"key": "professional-design-services", "type": "definition", "offset": [2443, 2471]}], "hash": "cbe8b1b4063575d57fdca39a70c59f5c", "id": 2}, {"samples": [{"hash": "2GhP0b6m8WG", "uri": "/contracts/2GhP0b6m8WG#subsurface-utility-engineering", "label": "Consultant Services Contract", "score": 31.597366333, "published": true}], "size": 4, "snippet": "Provide a Subsurface Utility Engineering (SUE) Quality Level B as described below. The SUE shall be performed in accordance with CI/ASCE 38-02. \u2022 Conduct appropriate investigations (e.g., owner records, County/CITY records, personal interviews, visual inspections, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project. \u2022 Collect applicable records (e.g., utility owner base maps, \u201cas built\u201d or record drawings, permit records, field notes, geographic information system data, oral histories, etc.) on the existence and approximate location of existing involved utilities. \u2022 Review records for: evidence or indication of additional available records; duplicate or conflicting information; need for clarification. \u2022 Develop SUE plan sheets and transfer information on all involved utilities to appropriate design plan sheets, electronic files, and/or other documents as required. Exercise professional judgment to resolve conflicting information. For information depicted, indicate: utility type and ownership; date of depiction; quality level(s); end points of any utility data; line status (e.g., active, abandoned, out of service); line size and condition; number of jointly buried cables; and encasement. \u2022 Identify surface features, from project topographic data and from field observations, that are surface appurtenances of subsurface utilities. \u2022 Include survey and correlation of aerial or ground-mounted utility facilities in Quality Level C tasks. \u2022 Survey surface features of subsurface utility facilities or systems. \u2022 The survey shall also include (in addition to subsurface utility features visible at the ground surface): determination of invert elevations of any manholes and vaults; sketches showing interior dimensions and line connections of such manholes and vaults; any surface markings denoting subsurface utilities, furnished by utility owners for design purposes. \u2022 Exercise professional judgment to correlate data from different sources, and to resolve conflicting information. \u2022 Update (or prepare) plan sheets, electronic files, and/or other documents to reflect the integration of Quality Level D and Quality Level C information. \u2022 Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as may be needed to further resolve discrepancies. \u2022 Provide Quality Level C to identify overhead utilities on the project and provide the overhead utility information on the SUE plan sheets. \u2022 Select and apply appropriate surface geophysical method(s) to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. \u2022 Based on an interpretation of data, mark the indications of utilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. \u2022 Unless otherwise directed, mark centerline of single-conduit lines, and outside edges of multi-conduit systems. \u2022 Resolve differences between designated utilities and utility records and surveyed appurtenances. \u2022 Recommend additional measures to resolve differences if they still exist. Recommendations may include additional or different surface geophysical methods, exploratory excavation, or upgrade to Quality Level A data. \u2022 As an alternative to the physical marking of lines, the ENGINEER may, with CITY\u2019s approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project\u2019s survey control. \u2022 Expose and locate utilities at specific locations. \u2022 Tie horizontal and vertical location of utility to survey control. \u2022 Provide utility size and configuration. \u2022 Provide paving thickness and type, where applicable. \u2022 Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site.", "snippet_links": [{"key": "provide-a", "type": "definition", "offset": [0, 9]}, {"key": "level-b", "type": "definition", "offset": [55, 62]}, {"key": "in-accordance-with", "type": "clause", "offset": [110, 128]}, {"key": "asce-38", "type": "definition", "offset": [132, 139]}, {"key": "city-records", "type": "clause", "offset": [210, 222]}, {"key": "personal-interviews", "type": "clause", "offset": [224, 243]}, {"key": "project-limits", "type": "definition", "offset": [340, 354]}, {"key": "affected-by", "type": "definition", "offset": [370, 381]}, {"key": "applicable-records", "type": "definition", "offset": [405, 423]}, {"key": "utility-owner", "type": "definition", "offset": [431, 444]}, {"key": "record-drawings", "type": "definition", "offset": [470, 485]}, {"key": "geographic-information-system-data", "type": "definition", "offset": [516, 550]}, {"key": "oral-histories", "type": "clause", "offset": [552, 566]}, {"key": "location-of", "type": "definition", "offset": [607, 618]}, {"key": "conflicting-information", "type": "clause", "offset": [739, 762]}, {"key": "for-clarification", "type": "definition", "offset": [769, 786]}, {"key": "plan-sheets", "type": "clause", "offset": [802, 813]}, {"key": "information-on", "type": "clause", "offset": [827, 841]}, {"key": "to-appropriate", "type": "clause", "offset": [865, 879]}, {"key": "design-plan", "type": "definition", "offset": [880, 891]}, {"key": "electronic-files", "type": "clause", "offset": [900, 916]}, {"key": "other-documents", "type": "definition", "offset": [925, 940]}, {"key": "as-required", "type": "clause", "offset": [941, 952]}, {"key": "professional-judgment", "type": "clause", "offset": [963, 984]}, {"key": "for-information", "type": "clause", "offset": [1021, 1036]}, {"key": "date-of", "type": "clause", "offset": [1085, 1092]}, {"key": "points-of", "type": "clause", "offset": [1126, 1135]}, {"key": "utility-data", "type": "definition", "offset": [1140, 1152]}, {"key": "out-of-service", "type": "clause", "offset": [1192, 1206]}, {"key": "number-of", "type": "clause", "offset": [1234, 1243]}, {"key": "field-observations", "type": "clause", "offset": [1351, 1369]}, {"key": "utility-facilities", "type": "definition", "offset": [1488, 1506]}, {"key": "level-c", "type": "definition", "offset": [1518, 1525]}, {"key": "the-survey", "type": "clause", "offset": [1606, 1616]}, {"key": "in-addition-to", "type": "clause", "offset": [1637, 1651]}, {"key": "ground-surface", "type": "definition", "offset": [1695, 1709]}, {"key": "determination-of", "type": "clause", "offset": [1712, 1728]}, {"key": "level-d", "type": "definition", "offset": [2192, 2199]}, {"key": "additional-surveys", "type": "clause", "offset": [2277, 2295]}, {"key": "overhead-utilities", "type": "clause", "offset": [2426, 2444]}, {"key": "provide-the", "type": "clause", "offset": [2464, 2475]}, {"key": "utility-information", "type": "clause", "offset": [2485, 2504]}, {"key": "utility-line", "type": "definition", "offset": [2692, 2704]}, {"key": "based-on", "type": "definition", "offset": [2718, 2726]}, {"key": "interpretation-of", "type": "clause", "offset": [2730, 2747]}, {"key": "on-the-ground", "type": "definition", "offset": [2788, 2801]}, {"key": "other-method", "type": "clause", "offset": [2850, 2862]}, {"key": "measures-to", "type": "clause", "offset": [3132, 3143]}, {"key": "geophysical-methods", "type": "definition", "offset": [3245, 3264]}, {"key": "exploratory-excavation", "type": "definition", "offset": [3266, 3288]}, {"key": "level-a", "type": "definition", "offset": [3312, 3319]}, {"key": "the-engineer", "type": "definition", "offset": [3380, 3392]}, {"key": "data-collection", "type": "clause", "offset": [3443, 3458]}, {"key": "geophysical-data", "type": "definition", "offset": [3535, 3551]}, {"key": "survey-control", "type": "clause", "offset": [3569, 3583]}, {"key": "where-applicable", "type": "clause", "offset": [3786, 3802]}, {"key": "soil-type", "type": "definition", "offset": [3822, 3831]}, {"key": "site-conditions", "type": "clause", "offset": [3836, 3851]}, {"key": "other-pertinent-information", "type": "clause", "offset": [3861, 3888]}, {"key": "test-hole", "type": "definition", "offset": [3930, 3939]}], "hash": "6693c3359aceb5facc88831b08f3eb1a", "id": 3}, {"samples": [{"hash": "gH5wBhIThGU", "uri": "/contracts/gH5wBhIThGU#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 32.2770614624, "published": true}, {"hash": "9iIWWNYcLgx", "uri": "/contracts/9iIWWNYcLgx#subsurface-utility-engineering", "label": "Williamson County Contract for Engineering Services", "score": 32.2722244263, "published": true}], "size": 3, "snippet": "Utility Designation/Investigation/Mapping (1,000 LF Minimum) $1.76/LF Test Hole 0 Feet - 5Feet $1,315.00/EA Test Hole Over 5 Feet to 8 Feet $1,600.00/EA Test Hole Over 8 Feet to 13 Feet $1,995.00/EA Test Hole Over 13 Feet to 20 Feet $2,575.00/EA Test Hole Over 20 Feet $3,025.00/EA Pavement Coring $370.00/EA Permits (Local, State, etc.) At Cost Traffic Control Plans, Signs, Barricades At Cost Select Backfill and pavement restoration At Cost Vacuum excavation truck mobilization and demobilization $5.00/mile Designating and/or other survey vehicle mobilization and demobilization $2.25/mile Traffic control vehicle mobilization and demobilization $2.00/mile REIMBURSABLE EXPENSES Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy Effective October 2022 One Person (1) Field Crew $120.75/HR Two Person (2) Field Crew $173.25/HR Three Person (3) Field Crew $204.75/HR One Person (1) GPS/RTK Crew $173.25/HR Two Person (2) GPS/RTK Crew $231.00/HR Three Person (3) GPS/RTK Crew $262.50/HR Terrestrial LIBAR Scanner $100/HR Additional Crew/Rod Person $47.25/HR Flagger $47.25/HR UAS LiBAR Unit-day rate $4,500.00 Mobile Mapping Unit-day rate $9,000.00 REIMBURSABLE EXPENSES Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy Effective October 2022 REIMBURSABLE EXPENSES Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy Effective October 2022 UTILITY COORDINATION & ENGINEERING Project Manager $193.20/\u2587\u2587 \u2587\u2587. Project Engineer $151.20/HR CAD Technician $73.50/\u2587\u2587 \u2587\u2587. CAD Technician $98.70/HR Administrative $52.50/HR REIMBURSABLE EXPENSES Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy Effective May 2023 ENGINEERING & REPORTING Principal $225.00/HR Senior Geotechnical Engineer $195.00/HR Project Engineer $135.00/HR Drafter $75.00/HR Administrative $75.00/HR LABORATORY SOIL TESTING Atterberg Limits $75.00/EA Grain Size Analysis (Includes Percent Passing #200 Sieve) $70.00/EA Unconfined Compressive Strength $75.00/EA Corrosion Suite (pH, Sol. Chlorides, Sulfates, Box Resistivity) $450.00/HR FIELD EXPLORATION Field Coordination (Staking of Borings, One-Call, Planning) $75.00/HR Logger $75.00/HR Transportation Cost \u2013 Trip Charge $65.00/Trip Mobilization (drill rig and support equipment, truck rig) $550.00/EA Water Hauling $175.00/EA Drilling and Sampling (Soil Boring) $22.00/FT Drilling and Sampling (Rock Coring) $32.00/FT Backfill Boreholes $6.00/FT REIMBURSABLE EXPENSES Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy Principal $320.00/HR Senior Project Manager $280.0/HR Project Engineer $214.00/HR Graduate Engineer $155.00/HR Administrative $95.00/HR", "snippet_links": [{"key": "utility-designation", "type": "clause", "offset": [0, 19]}, {"key": "test-hole", "type": "definition", "offset": [70, 79]}, {"key": "at-cost", "type": "definition", "offset": [338, 345]}, {"key": "traffic-control-plans", "type": "clause", "offset": [346, 367]}, {"key": "pavement-restoration", "type": "clause", "offset": [415, 435]}, {"key": "vacuum-excavation", "type": "clause", "offset": [444, 461]}, {"key": "mobilization-and-demobilization", "type": "clause", "offset": [468, 499]}, {"key": "other-survey", "type": "clause", "offset": [530, 542]}, {"key": "reimbursable-expenses", "type": "definition", "offset": [661, 682]}, {"key": "travel-reimbursement", "type": "clause", "offset": [695, 715]}, {"key": "in-accordance-with", "type": "clause", "offset": [747, 765]}, {"key": "williamson-county-vendor-reimbursement-policy", "type": "clause", "offset": [770, 815]}, {"key": "effective-october", "type": "clause", "offset": [816, 833]}, {"key": "additional-crew", "type": "clause", "offset": [1105, 1120]}, {"key": "day-rate", "type": "clause", "offset": [1175, 1183]}, {"key": "utility-coordination", "type": "clause", "offset": [1589, 1609]}, {"key": "project-engineer", "type": "definition", "offset": [1655, 1671]}, {"key": "effective-may", "type": "clause", "offset": [1917, 1930]}, {"key": "geotechnical-engineer", "type": "clause", "offset": [1988, 2009]}, {"key": "soil-testing", "type": "clause", "offset": [2103, 2115]}, {"key": "grain-size-analysis", "type": "definition", "offset": [2143, 2162]}, {"key": "unconfined-compressive-strength", "type": "definition", "offset": [2211, 2242]}, {"key": "field-exploration", "type": "clause", "offset": [2328, 2345]}, {"key": "transportation-cost", "type": "definition", "offset": [2433, 2452]}, {"key": "trip-charge", "type": "clause", "offset": [2455, 2466]}, {"key": "support-equipment", "type": "definition", "offset": [2507, 2524]}, {"key": "drilling-and-sampling", "type": "clause", "offset": [2573, 2594]}, {"key": "soil-boring", "type": "definition", "offset": [2596, 2607]}, {"key": "senior-project-manager", "type": "clause", "offset": [2869, 2891]}, {"key": "graduate-engineer", "type": "definition", "offset": [2930, 2947]}], "hash": "6f313a0d214061b9f39ae5f7f1901361", "id": 4}, {"samples": [{"hash": "bDLfB4FtSmh", "uri": "/contracts/bDLfB4FtSmh#subsurface-utility-engineering", "label": "Professional Services", "score": 33.2945327759, "published": true}], "size": 3, "snippet": "(\u201cSUE\u201d). The Professional shall perform SUE as described herein.\n4.2.1. The Professional shall provide SUE \u201cQuality Level B\u201d utility locates at select locations along the alignment of the pipeline. Level B includes two-dimensional horizontal information obtained through the application and interpretation of non-destructive surface geophysical methods providing horizontal positioning of subsurface utilities to within approximately one (1) foot.\n4.2.2. The Professional shall perform SUE \u201cQuality Level A\u201d for up to fifteen (15) pothole locations. Level A includes physically locating the actual utility \u2013 often by \u2018potholing.\u2019 Once the utility is potholed it is located horizontally and vertically by survey measurements. This location is typically to the top of the pipe and shall be noted on the design plans.\n4.2.3. The Professional shall provide coordination for utility locates/clearance and permitting required to conduct SUE potholes.\n4.2.4. The Professional shall provide traffic control, depending on the directed dig site locations.", "snippet_links": [{"key": "the-professional", "type": "clause", "offset": [9, 25]}, {"key": "level-b", "type": "definition", "offset": [116, 123]}, {"key": "utility-locates", "type": "clause", "offset": [125, 140]}, {"key": "interpretation-of", "type": "clause", "offset": [291, 308]}, {"key": "geophysical-methods", "type": "definition", "offset": [333, 352]}, {"key": "level-a", "type": "definition", "offset": [499, 506]}, {"key": "design-plans", "type": "definition", "offset": [801, 813]}, {"key": "for-utility", "type": "clause", "offset": [866, 877]}, {"key": "traffic-control", "type": "clause", "offset": [983, 998]}, {"key": "depending-on-the", "type": "clause", "offset": [1000, 1016]}, {"key": "site-locations", "type": "definition", "offset": [1030, 1044]}], "hash": "160b01b373ea3aef2179c77e79125243", "id": 5}, {"samples": [{"hash": "loamRgYqcCf", "uri": "/contracts/loamRgYqcCf#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 23.1546878815, "published": true}], "size": 3, "snippet": "Utility Engineering Investigation (currently Subsurface Utility Engineering) shall include utility investigations subsurface and above ground prepared in accordance with AASHTO standards [ASCE C-1 38-02 \u2587\u2587\u2587\u2587://\u2587\u2587\u2587.\u2587\u2587\u2587\u2587.\u2587\u2587\u2587.\u2587\u2587\u2587/programadmin/asce.cfm)] and Utility Quality Levels. Utility Quality Levels are defined in cumulative order (least to greatest) as follows: Quality Level D - Existing Records: Utilities are plotted from review of available existing records. Quality Level C - Surface Visible Feature Survey: Quality level \"D\" information from existing records is correlated with surveyed surface- visible features. Includes Quality Level D information. If there are variances in the designated work area of Level D then a new schematic or plan layout, if needed, is required showing the limits of the proposed project and limits of the work area required for this work authorization; including highway stations, limits within existing or proposed right of way, additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. If there are variances in the designated work area of Level D then a new schematic or plan layout, if needed, is required showing the limits of the proposed project and limits of the work area required for this work authorization; including highway stations, limits within existing or proposed right of way, additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. Quality Level B - Designate: Two-dimensional horizontal mapping. This information is obtained through the application and interpretation of appropriate non-destructive surface geophysical methods. Utility indications are referenced to established survey control. Incorporates quality levels C and D information to produce Quality Level B. If there are variances in the designated work area of Level D then a new schematic or plan layout, if needed, is required showing the limits of the proposed project and limits of the work area required for this work authorization; including highway stations, limits within existing or proposed right of way, additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. If there are variances in the designated work area of Level D then a new schematic or plan layout, if needed, is required showing the limits of the proposed project and limits of the work area required for this work authorization; including highway stations, limits within existing or proposed right of way, additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 Quality Level A - Locate (Test Hole): Three-dimensional mapping and other characterization data. This information is obtained through exposing utility facilities through test holes and measuring and recording (to appropriate survey control) utility/environment data. Incorporates quality levels B, C and D information to produce Quality Level A. For schematic design, the Engineer shall perform Designate Quality Level B. For PS&E, the Engineer shall perform Quality Level A to further locate utility conflicts identified during the schematic design. Designate (Quality Level B) Designate means to indicate the horizontal location of underground utilities by the application and interpretation of appropriate non-destructive surface geophysical techniques and reference to established survey control. Designate (Quality Level B) Services are inclusive of Quality levels C and D. The Engineer shall:", "snippet_links": [{"key": "utility-engineering-investigation", "type": "clause", "offset": [0, 33]}, {"key": "utility-investigations", "type": "clause", "offset": [91, 113]}, {"key": "above-ground", "type": "definition", "offset": [129, 141]}, {"key": "in-accordance-with", "type": "clause", "offset": [151, 169]}, {"key": "utility-quality-levels", "type": "clause", "offset": [255, 277]}, {"key": "level-d", "type": "definition", "offset": [374, 381]}, {"key": "review-of", "type": "clause", "offset": [429, 438]}, {"key": "level-c", "type": "definition", "offset": [475, 482]}, {"key": "surface-visible", "type": "clause", "offset": [485, 500]}, {"key": "information-from", "type": "clause", "offset": [535, 551]}, {"key": "designated-work-area", "type": "definition", "offset": [692, 712]}, {"key": "proposed-project", "type": "clause", "offset": [810, 826]}, {"key": "of-the-work", "type": "clause", "offset": [838, 849]}, {"key": "work-authorization", "type": "clause", "offset": [873, 891]}, {"key": "right-of-way", "type": "clause", "offset": [956, 968]}, {"key": "additional-areas", "type": "clause", "offset": [970, 986]}, {"key": "level-b", "type": "definition", "offset": [1540, 1547]}, {"key": "interpretation-of", "type": "clause", "offset": [1654, 1671]}, {"key": "geophysical-methods", "type": "definition", "offset": [1708, 1727]}, {"key": "survey-control", "type": "clause", "offset": [1779, 1793]}, {"key": "docusign-envelope", "type": "definition", "offset": [2741, 2758]}, {"key": "level-a", "type": "definition", "offset": [2808, 2815]}, {"key": "test-hole", "type": "definition", "offset": [2826, 2835]}, {"key": "utility-facilities", "type": "definition", "offset": [2943, 2961]}, {"key": "to-appropriate", "type": "clause", "offset": [3010, 3024]}, {"key": "schematic-design", "type": "clause", "offset": [3150, 3166]}, {"key": "the-engineer", "type": "definition", "offset": [3168, 3180]}, {"key": "utility-conflicts", "type": "clause", "offset": [3293, 3310]}, {"key": "location-of", "type": "definition", "offset": [3422, 3433]}, {"key": "underground-utilities", "type": "definition", "offset": [3434, 3455]}, {"key": "reference-to", "type": "definition", "offset": [3560, 3572]}, {"key": "inclusive-of", "type": "clause", "offset": [3642, 3654]}], "hash": "b9f861b1de6819128ea8f0b8e54883f9", "id": 6}, {"samples": [{"hash": "kwtDziHoz7R", "uri": "/contracts/kwtDziHoz7R#subsurface-utility-engineering", "label": "Professional Services", "score": 24.7275829315, "published": true}, {"hash": "cU5OPzCn0Ur", "uri": "/contracts/cU5OPzCn0Ur#subsurface-utility-engineering", "label": "Professional Services", "score": 24.7002048492, "published": true}], "size": 2, "snippet": "Quality Level A Subsurface Utility Engineering of up to five (5) potholes at conflict locations as determined by the Design Consultant. \u2022 Quality Level B Subsurface Utility Engineering designation along the length of the proposed roadway alignment.", "snippet_links": [{"key": "level-a", "type": "definition", "offset": [8, 15]}, {"key": "design-consultant", "type": "definition", "offset": [117, 134]}, {"key": "level-b", "type": "definition", "offset": [146, 153]}, {"key": "the-proposed", "type": "clause", "offset": [217, 229]}, {"key": "roadway-alignment", "type": "clause", "offset": [230, 247]}], "hash": "ab1fdb1949f327d78a4d55cf7c2f53e4", "id": 7}, {"samples": [{"hash": "5s048DWZ4zc", "uri": "/contracts/5s048DWZ4zc#subsurface-utility-engineering", "label": "Williamson County Contract for Engineering Services", "score": 24.6112251282, "published": true}, {"hash": "5NyWg465IbY", "uri": "/contracts/5NyWg465IbY#subsurface-utility-engineering", "label": "Williamson County Contract for Engineering Services", "score": 24.6112251282, "published": true}], "size": 2, "snippet": "One-Man Designating Crew (4-Hr Minimum) $107.02/hr", "snippet_links": [], "hash": "34fa9917b36f79c10c33f61ba311813c", "id": 8}, {"samples": [{"hash": "gZWJppJW7ck", "uri": "/contracts/gZWJppJW7ck#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 26.1841201782, "published": true}, {"hash": "8QMQGiCvbwB", "uri": "/contracts/8QMQGiCvbwB#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 25.6830940247, "published": true}], "size": 2, "snippet": "Utility Designation/Investigation/Mapping (1,000 LF Minimum) $1.76/LF Test Hole 0 Feet - 5Feet $1,315.00/EA Test Hole Over 5 Feet to 8 Feet $1,600.00/EA Test Hole Over 8 Feet to 13 Feet $1,995.00/EA Test Hole Over 13 Feet to 20 Feet $2,575.00/EA Test Hole Over 20 Feet $3,025.00/EA Pavement Coring $370.00/EA Permits (Local, State, etc.) At Cost Traffic Control Plans, Signs, Barricades At Cost Select Backfill and pavement restoration At Cost Vacuum excavation truck mobilization and demobilization $5.00/mile Designating and/or other survey vehicle mobilization and demobilization $2.25/mile Traffic control vehicle mobilization and demobilization $2.00/mile Out of town travel reimbursement (meals, lodging, etc.) will be in accordance with the Williamson County Vendor Reimbursement Policy", "snippet_links": [{"key": "utility-designation", "type": "clause", "offset": [0, 19]}, {"key": "test-hole", "type": "definition", "offset": [70, 79]}, {"key": "at-cost", "type": "definition", "offset": [338, 345]}, {"key": "traffic-control-plans", "type": "clause", "offset": [346, 367]}, {"key": "pavement-restoration", "type": "clause", "offset": [415, 435]}, {"key": "vacuum-excavation", "type": "clause", "offset": [444, 461]}, {"key": "mobilization-and-demobilization", "type": "clause", "offset": [468, 499]}, {"key": "other-survey", "type": "clause", "offset": [530, 542]}, {"key": "travel-reimbursement", "type": "clause", "offset": [673, 693]}, {"key": "in-accordance-with", "type": "clause", "offset": [725, 743]}, {"key": "williamson-county-vendor-reimbursement-policy", "type": "clause", "offset": [748, 793]}], "hash": "985fe193a309c45a135fd9956ad24532", "id": 9}, {"samples": [{"hash": "hz9W9iNP26W", "uri": "/contracts/hz9W9iNP26W#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 24.2689933777, "published": true}, {"hash": "337pHu7L3cE", "uri": "/contracts/337pHu7L3cE#subsurface-utility-engineering", "label": "Contract for Engineering Services", "score": 24.2689933777, "published": true}], "size": 2, "snippet": "One-Man Designating Crew (4-Hour Minimum) $110.00/HR Two-Man Designating Crew (4-Hour Minimum) $170.00/HR Vacuum Excavation Truck with 2 Technicians (Vac 3000 & 4000) (4-Hour Min.) $295.00/HR Vacuum Excavation Truck with 2 Technicians (Vac 6000) (4-Hour Minimum) $315.00/HR Ground Penetrating Radar with 1 Technician (4-Hour Minimum) $260.00/HR Closed Circuit Television (CCTV) with 2 Technicians $280.00/HR Traffic Control Officer At Cost Traffic Control (Lane Closures, etc.) At Cost Permits (Local, State, etc.) At Cost", "snippet_links": [{"key": "hour-minimum", "type": "clause", "offset": [28, 40]}, {"key": "vacuum-excavation", "type": "clause", "offset": [106, 123]}, {"key": "ground-penetrating-radar", "type": "clause", "offset": [274, 298]}, {"key": "closed-circuit-television", "type": "definition", "offset": [345, 370]}, {"key": "traffic-control-officer", "type": "clause", "offset": [408, 431]}, {"key": "at-cost", "type": "definition", "offset": [432, 439]}, {"key": "lane-closures", "type": "clause", "offset": [457, 470]}], "hash": "084be1301f3f7ddf5949a52bc5755771", "id": 10}], "next_curs": "CmcSYWoVc35sYXdpbnNpZGVyY29udHJhY3RzckMLEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IidzdWJzdXJmYWNlLXV0aWxpdHktZW5naW5lZXJpbmcjMDAwMDAwMGEMogECZW4YACAA", "clause": {"size": 70, "title": "SUBSURFACE UTILITY ENGINEERING", "children": [["", ""], ["definitions", "Definitions"], ["reference-information", "Reference Information"], ["compensation-and-costs", "Compensation and Costs"], ["ground-penetrating-radar", "Ground Penetrating Radar"]], "parents": [["field-services", "Field Services"], ["electronic-signatures", "Electronic Signatures"], ["services-by-task", "SERVICES BY TASK"], ["human-trafficking", "Human Trafficking"], ["invoicing", "INVOICING"]], "id": "subsurface-utility-engineering", "related": [["engineering", "Engineering", "Engineering"], ["geotechnical-engineer", "Geotechnical Engineer", "Geotechnical Engineer"], ["reverse-engineering", "Reverse Engineering", "Reverse Engineering"], ["environmental-assessment-and-mitigation", "Environmental Assessment and Mitigation", "Environmental Assessment and Mitigation"], ["underground-utilities", "Underground Utilities", "Underground Utilities"]], "related_snippets": [], "updated": "2025-07-24T04:27:51+00:00"}, "json": true, "cursor": ""}}