Substation Technical Requirements Sample Clauses

Substation Technical Requirements. It should be highlighted that, during the development of the final project study, the Concession Holder shall carry out all the studies required to ensure the proper operation of the equipment of the system proposed.
AutoNDA by SimpleDocs
Substation Technical Requirements. The three-phase power transformer shall be supplied with current transformers incorporated into the bushing insulators, with three (3) 5P20 protection cores, for the three phases and in the three windings, in addition to the corresponding cores for thermal image regulation and protection. The nominal voltage, voltage regulation, and 220/60/22.9 kV three-phase transformer connection group shall be as follows: ▪ Voltages - Primary voltage 220 kV - Secondary voltage 60 kV - Tertiary voltage 22.9 kV ▪ Rated power 50-65/50-65/15-19.5 MVA (ONAN-ONAF) in 220/60/22.9 kV ▪ Connection Group YN / YN / delta - Primary side, 220 kV Wye, solidly grounded neutral - Secondary side, 60 kV Wye, solidly grounded neutral - Tertiary side, 22.9 kV Delta - Voltage regulation Automatic under load on the 220 KV side, with reference busbar voltage of 60 kV (*).
Substation Technical Requirements. The reactors shall be supplied with current transformers incorporated into the bushing insulators, phase side and neutral side, with two (2) 5P20 protection cores, as well as the current transformers in the neutral of the three-phase setup. The reactance and power values and the definitive characteristics of the equipment shall be determined by the CONCESSIONAIRE, as defined, supported, and approved in the POS. g3. Losses Loss levels shall be guaranteed in transformer for permanent load levels of 100%, 75%, and 50% of the rated power. For the reactor, the loss value shall be guaranteed for operation at the rated voltage. The guaranteed values shall meet IEC 60076 or its ANSI/IEEE equivalent.
Substation Technical Requirements. The power transformer shall be supplied with current transformers incorporated into the bushing insulators, with three (3) 5P20 protection cores, for the three phases, in the three windings, as well as the corresponding cores for thermal image regulation and protection. The nominal voltage, voltage regulation, and 138/22.9 kV transformer connection group shall be as follows: ▪ Voltages - Primary voltage 138 kV - Secondary voltage 22.9 kV - Tertiary voltage 10 kV ▪ Rated power 20 – 25 / 20 – 25 / (*) – (*) MVA (ONAN – ONAF) ▪ Connection Group YN/YN/Delta - Primary side, 138 kV Wye, solidly grounded neutral - Secondary side, 22.9 kV Wye, solidly grounded neutral - Tertiary side, 10 kV Delta ▪ Voltage regulation Automatic under load on the 138 kV side, with taps of +/- 10 x 1% (**)

Related to Substation Technical Requirements

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Technical Regulations 1. The rights and obligations of the Parties in respect of technical regulations, standards and conformity assessment shall be governed by the WTO Agreement on Technical Barriers to Trade.

  • Operational Requirements 4 At-Sea Monitors are deployed, in accordance with coverage rates developed by 5 NMFS and as assigned through the Pre-Trip Notification System (PTNS), to 6 vessels. Due to availability of funding, changes in the fishery management, 7 such as emergency closures, court ordered closures, weather, and unforeseen 8 events must remain flexible. Additional funding for sea days may be added to 9 the contract within the scope and maximum allowable sea days. 10 The following items define the operational services to be provided by the 11 contractor under this contract.

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • Functional Requirements Applications must implement controls that protect against known vulnerabilities and threats, including Open Web Application Security Project (OWASP) Top 10 Risks and denial of service (DDOS) attacks.

  • General Requirements The Contractor hereby agrees:

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • DEVELOPMENTAL REQUIREMENTS The Personal Development Plan (PDP) for addressing developmental gaps is attached as Annexure B.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • DRUG-FREE WORKPLACE REQUIREMENTS Contractor will comply with the requirements of the Drug-Free Workplace Act of 1990 and will provide a drug-free workplace by taking the following actions:

Time is Money Join Law Insider Premium to draft better contracts faster.