STRUCTURE EXCAVATION. Dimension, size, depth and all alignment of excavation shall be shown on plans and detail drawing. Excavated excess materials shall be hauled within free haul distance (500m radius).
STRUCTURE EXCAVATION. STRUCTURE EXCAVATION shall conform to Subsections 300-3, “STRUCTURE EXCAVATION AND BACKFILL,” of the STANDARD SPECIFICATIONS. All surplus excavated shall become the property of the CONTRACTOR and shall be disposed of outside of project right-of-way in accordance with all applicable codes and ordinances. STRUCTURAL EXCAVATION is required for bridge abutments, footings and piers. See Caltrans Standard Plan A62C for limits.
STRUCTURE EXCAVATION. ROCK (COMPLETE)
STRUCTURE EXCAVATION. EARTH (COMPLETE)
STRUCTURE EXCAVATION. The volume of excavation to be paid for will be the number of cubic metres measured in original position of material acceptably excavated in conformity with the Plans or as directed by the Engineer, but in no case, except as noted, will any of the following volumes be included in the measurement for payment:
(1) The volume outside of vertical planes 450 mm (18 inches) outside of and parallel to the neat lines of footings and the inside walls of pipe and pipe-arch culverts at their widest horizontal dimensions.
(2) The volume of excavation for culvert and sections outside the vertical plane for culverts stipulated in (1) above.
(3) The volume outside of neat lines of underdrains as shown on the Plans, and outside the limits of foundation fill as ordered by the Engineer.