Stockpile Location Sample Clauses

Stockpile Location. Welchers Pit 1 ¼ Inch Minus 500 Welchers Pit 6-67 ROCK STOCKPILE SPECIFICATIONS Rock stockpiles listed in Clause 6-65 ROCK STOCKPILE LOCATION must meet the following specifications: Before placing aggregates upon the stockpile site, the site must be cleared of vegetation, trees, stumps, brush, rocks, or other debris and the ground leveled to a smooth, firm, uniform surface. When completed, the stockpile must be neat and regular in shape. The stockpile height is limited to a maximum of 24 feet. Stockpiles in excess of 200 cubic yards must be built up in layers of not more than 4 feet deep. Stockpile layers must be constructed by trucks, clamshells, or other methods approved in writing by the Contract Administrator. Each layer must be completed over the entire area of the pile before depositing aggregates in the next layer. The aggregates may not be dumped so that they run down and over the lower layers in the stockpile. Stockpiles of different types or sizes of aggregate must be spaced far enough apart, or separated by suitable walls or partitions, to prevent the mixing of the aggregates.
AutoNDA by SimpleDocs
Stockpile Location. Marble Pit 1½-INCH MINUS CRUSHED 1000 14+78 of PH-5220 1000 66+31 of PH-5000 6-67 ROCK STOCKPILE SPECIFICATIONS Rock stockpiles listed in Clause 6-65 ROCK STOCKPILE LOCATION must meet the following specifications: Before placing aggregates upon the stockpile site, the site must be cleared of vegetation, trees, stumps, brush, rocks, or other debris and the ground leveled to a smooth, firm, uniform surface. When completed, the stockpile must be neat and regular in shape. The stockpile height is limited to a maximum of 24 feet. Stockpiles in excess of 200 cubic yards must be built up in layers of not more than 4 feet deep. Stockpile layers must be constructed by trucks, clamshells, or other methods approved in writing by the Contract Administrator. Each layer must be completed over the entire area of the pile before depositing aggregates in the next layer. The aggregates may not be dumped so that they run down and over the lower layers in the stockpile. The method of dropping from a bucket or spout in one location to form a cone shaped pile is not allowed. Stockpiles of different types or sizes of aggregate must be spaced far enough apart, or separated by suitable walls or partitions, to prevent the mixing of the aggregates.
Stockpile Location. 5050 Pit 4 Inch Jaw 4000 5050 Pit
Stockpile Location. Gung Ho Pit 2” MINUS CRUSHED ROCK 2000 Gung Ho Pit
Stockpile Location. Timberline Quarry 2-inch minus crushed 3,000 Quarry site – see development plan
Stockpile Location. PH‐3000 Pit 1 ¼ Inch Minus 1,000 On the Right side of the PH‐3000 at station 49+00
Stockpile Location. Santa Xxxxx Pit 3-inch-minus ballast rock 1500 Within pit as directed by Contract Administrator. To be completed by June 1, 2021.
AutoNDA by SimpleDocs
Stockpile Location. P&E Extension Quarry 2 ½ INCH Crushed Rock 1,300 yds P&E Extension Quary
Stockpile Location. B.B. Pit 4 inch jaw 3,000 B.B. Pit
Stockpile Location. Harmony Quarry 2”‐ crushed 2000 See ROCK SOURCE DEVELOPMENT PLAN 6‐66 STOCKPILE BY SCREENING Purchaser shall screen 2000 cubic yards of 2”‐ crushed rock in accordance with the specifications in Clause 6‐30 2‐INCH MINUS CRUSHED ROCK.
Time is Money Join Law Insider Premium to draft better contracts faster.